USCG Station Marathon Repair Asphalt and Ground Repair

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

BASE MIAMI(00028)

Contract Value

Not provided

Codes & Classification
Solicitation Number

30314PR260000015

NAICS

238990 - All Other Specialty Trade Contractors

Classification Code

Z2ED

Additional Details
Set Aside

SBA

Place of Performance

Marathon, Florida, UNITED STATES

SourceSAM
Documents5
The U.S. Coast Guard (USCG), under the Department of Homeland Security, is soliciting proposals for a firm-fixed-price construction contract to perform asphalt and ground repairs at USCG Station Marathon, located at 1800 Overseas Highway, Marathon, Florida. This procurement is issued as a combined synopsis/solicitation in accordance with FAR Parts 13 and 36, and is set aside exclusively for small business concerns under NAICS code 238990 (All Other Specialty Trade Contractors), with a project magnitude not to exceed $20,000. **Purpose and Scope** The primary objective of this project is to address and remediate deteriorated asphalt surfaces and associated ground conditions at Station Marathon. Specifically, the work involves repairing sunken asphalt in front of the station’s boat house to ensure proper drainage and eliminate standing water, as well as restoring broken and missing asphalt adjacent to the pier. The project also includes ground repair activities necessitated by prior work, with the use of a 6,000-lb telehandler and skid steer (to be managed and operated by station personnel) for moving sheet pilings and facilitating repairs. **Key Requirements and Deliverables** The contractor is responsible for providing all supervision, labor, materials, and equipment necessary to complete the following tasks: - Cut and mill damaged asphalt in designated areas (in front of the boat house and next to the pier). - Remove and legally dispose of all debris, old asphalt, and millings off-site, in compliance with federal, state, and local regulations. - Replace damaged and missing asphalt with Florida Department of Transportation (FDOT) approved hot mix asphalt. - Ensure proper grading and compaction of new asphalt to facilitate drainage and prevent water accumulation. - Coordinate closely with station personnel for site access and removal of obstacles prior to commencement of work. All work must commence within 10 days of the Notice to Proceed and be completed within 30 to 60 calendar days of contract award. Contractors are expected to schedule work to minimize disruption to station operations, primarily during normal business hours (8:00 AM to 4:00 PM, Monday through Friday, excluding federal holidays), with alternative hours subject to prior approval. **Site Access, Security, and Safety** A site visit is highly encouraged (though not mandatory) and is scheduled for August 13, 2026, at 10:00 AM EST. Prospective bidders should coordinate with DC2 Trace J. Weller ([email protected], 806-786-9677) for access and additional information. Contractor personnel must submit a consolidated list of all workers (including full name, date of birth, and last four digits of SSN) at least 1-2 days prior to work for background checks. Only U.S. citizens and permanent resident aliens are permitted on site; foreign nationals are strictly prohibited. All personnel and vehicles are subject to search, and strict adherence to station security and conduct regulations is required. The contractor must comply with all applicable OSHA standards (29 CFR 1926), submit a Site-Specific Safety Plan within five days of award, and implement appropriate personal protective equipment and safety measures. The USCG reserves the right to bar any personnel for safety violations. **Contract Administration and Compliance** The contract will be awarded based on a Best Value determination, considering both technical acceptability (compliance with the Statement of Work) and price reasonableness. Proposals must include a detailed price breakdown for labor, supervision, materials, and equipment. The contract is subject to Davis-Bacon Act wage determinations (FL20260022, Monroe County, FL), with certified payrolls required weekly. Contractors must also comply with Executive Orders 13706 (Paid Sick Leave) and 13658/14026 (Minimum Wage), as well as the Buy American Act (FAR 52.225-9) for materials, unless an exemption is granted. At least 15% of the contract value must be performed by the prime contractor (FAR 52.219-14), and all subcontractors must be pre-approved. The contractor is responsible for the conduct and compliance of all subcontractors. **Bonding and Insurance** Contractors must maintain the following minimum insurance coverage: - General Liability: $1,000,000 per occurrence - Workers’ Compensation: As required by state law - Automobile Liability: $500,000 per accident **Inspection, Acceptance, and Warranty** All work is subject to inspection by the Contracting Officer’s Representative (COR), who may reject non-conforming work or materials. Upon completion, the contractor must notify the COR for final inspection with at least 24 hours’ notice. Any discrepancies must be corrected within five business days. The contractor warrants all workmanship and materials for one year from the date of substantial completion. **Special Considerations** - The contractor must adhere to all station-specific regulations, including traffic rules, use of restrooms, and observance of daily flag ceremonies. - No hazardous or bulk construction waste may be disposed of in Coast Guard dumpsters. - The contract includes a clause (FAR 52.222-90) prohibiting racially discriminatory diversity, equity, and inclusion (DEI) activities, with mandatory reporting and flow-down requirements for all subcontractors. - Delays beyond the agreed completion date may result in liquidated damages of $150 per calendar day, unless due to documented unforeseen conditions. **Contracting Entity and Contact Information** The contracting office is USCG Procurement & Contracting, 12100 SW 152nd St, Miami, FL 33177. The primary contracting officer is Mehdi Bouayad ([email protected], 571-607-8108). The primary on-site point of contact is DC2 Trace J. Weller ([email protected], 806-786-9677), with MKC Andrew Vilitski ([email protected], 808-366-8983) as secondary contact. **Submission Details** Proposals are due by Thursday, August 20, 2026, at 11:00 AM EST, and must be submitted via email to [email protected]. All questions must be submitted in writing to DC2 Trace J. Weller and CC’d to the contracting officer by COB Monday, August 17, 2026. **Summary** This opportunity is well-suited for small business contractors with experience in asphalt paving, ground repair, and small-scale federal construction projects. The scope is clearly defined, with a focus on quality, safety, and compliance with federal regulations. Contractors must be prepared to coordinate closely with USCG personnel, adhere to strict security and operational protocols, and deliver timely, high-quality repairs that meet all specified standards.