Electric 5k - 6k DBP Burden Carrier Tractor

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

AVIATION LOGISTICS CENTER (ALC)(00038)

Contract Value

Not provided

Codes & Classification
Solicitation Number

70Z03826QE0000050

NAICS

333924 - Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing

Classification Code

1740

Additional Details
Set Aside

None

Place of Performance

Elizabeth City, North Carolina, UNITED STATES

SourceSAM
Documents5
The United States Coast Guard (USCG), under the Department of Homeland Security, has issued a combined synopsis/solicitation (Solicitation No. 70Z03826QE0000050) for the procurement of Electric 5k - 6k Draw Bar Pull (DBP) Burden Carrier Tractors. This procurement is managed by the Aviation Logistics Center (ALC) in Elizabeth City, North Carolina, and is classified under NAICS code 333924 (Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing), with a small business size standard of 900 employees. The Product Service Code is 1740. **Purpose and Scope** The primary objective of this procurement is to acquire a fleet of electric burden carrier tractors capable of providing 5,000 to 6,000 pounds of draw bar pull. These units will be used for towing and moving USCG aircraft—including H65, H60, and C144 models—at various air stations, as well as serving as burden carriers for ground support equipment (GSE). The tractors are intended to operate in diverse and often challenging coastal environments, with all USCG air stations (27 in total, most within 50 miles of the ocean) receiving units. The most severe operational environment is noted as the air station in Hawaii, located just 400 feet from the ocean surf. **Key Requirements and Deliverables** - **First Article Testing:** The procurement will begin with the acquisition of a single first article unit, which must be delivered within 90-120 days after receipt of order (ARO). This unit will undergo evaluation against a government-approved test plan. Only upon successful completion of this evaluation will the production order proceed. - **Production Run:** Upon approval of the first article, a production run of 116 additional units is anticipated, with delivery required within 90 days after the first article passes testing. - **Technical Specifications:** All tractors must be new, meet the salient characteristics outlined in the solicitation attachments, and be suitable for both pushing and towing operations. The tractors must be capable of 8 hours of continuous operation on a single battery charge under standard ramp conditions, with vendors responsible for proposing a battery configuration that meets this requirement. - **Design Considerations:** The USCG will accept rear suspension systems utilizing either leaf springs or rubber cushion (bonded rubber) isolators, provided the required load-carrying capacity is met. Steering systems must not lock up in the event of power loss; steering should remain operable, albeit with increased effort, similar to a standard automobile with failed power steering. - **Environmental Protection:** All units must include a tropical rustproofing package as a standard feature (not optional), ensuring durability in harsh, salt-laden coastal environments. - **Charging Systems:** An onboard charging system is preferred, but proposals for external charging systems will be considered. If an external charger is proposed, it must be included as a separate line item, and total unit cost evaluation will account for both the tractor and the charging system. - **Optional Features:** Air conditioning may be proposed as an optional feature, with pricing provided separately as indicated in the solicitation attachments. - **Delivery Location:** All 117 units (first article plus production) are to be shipped to the Aviation Logistics Center in Elizabeth City, NC. **Procurement Process and Submission Requirements** This is an unrestricted, firm-fixed price procurement open to all responsible sources. The solicitation is conducted in accordance with FAR subpart 12.6 and part 13, as supplemented by the Revolutionary FAR Overhaul (RFO) under Executive Order 14275. No drawings, specifications, or schematics are available from the agency; all requirements are detailed in the solicitation attachments. Interested offerors must complete and submit Attachment 1 (Schedule of Supplies) and Attachment 2 (Acknowledgement Certification) in full; failure to do so will result in disqualification. Additional attachments include Terms and Conditions, Requirements, and the Test and Evaluation Plan. All quotations and capability statements must be submitted via email to [email protected] and [email protected], with the solicitation number clearly indicated in the subject line. **Key Dates and Contacts** - **Questions Due:** 12:00pm ET, August 10, 2026 - **Offers Due:** 12:00pm ET, August 17, 2026 - **Anticipated Award Date:** September 3, 2026 **Contracting Entity and Contact Information** - **Contracting Office:** Aviation Logistics Center (ALC), US Coast Guard, Elizabeth City, NC, United States - **Primary Contact:** William Swinson II ([email protected]) - **Secondary Contact:** Patrick Morris ([email protected]) **Special Considerations** - This is an unrestricted procurement; there are no set-aside requirements. - All parts and units must be new and approved. - The procurement is for commercial items only, and only the items specified in the solicitation will be considered for award. - The procurement is governed by the latest applicable FAR provisions and clauses as of November 28, 2025. **Summary** This opportunity represents a significant procurement for electric aircraft tow tractors, with a focus on reliability, operational endurance, and environmental resilience. Contractors with experience in manufacturing industrial electric tractors for aviation or similar applications, and with the capacity to meet stringent testing and delivery requirements, are encouraged to review the solicitation documents in detail and consider submitting a proposal.