The Defense Logistics Agency (DLA), through its DCSO Richmond Division #1, has issued a solicitation (SP4703-26-Q-0065) for the construction and installation of a lawn irrigation system at Buildings 46 and 47 (B46 & B47) at the Defense Supply Center Richmond (DSCR), located in North Chesterfield, Virginia. This procurement seeks qualified small business contractors under NAICS code 236220 (Commercial and Institutional Building Construction), with a size standard of $45 million, to deliver a comprehensive, fully functional irrigation solution in accordance with the requirements set forth in the solicitation and associated Statement of Work (SOW).
**Purpose and Scope:**
The primary objective of this project is to furnish and install a robust, reliable lawn irrigation system serving the grounds of DSCR’s B46 and B47. The scope encompasses all necessary site preparation, utility coordination, equipment installation, system commissioning, and post-installation auditing to ensure optimal performance and compliance with government standards. The anticipated magnitude of construction is between $250,000 and $500,000, as defined by FAR 36.204(d).
**Key Requirements and Deliverables:**
- **System Installation:** The contractor is responsible for the complete installation of the irrigation system, including all trenching, boring, and pipe laying, with strict adherence to utility marking protocols. Only Rainbird or Hunter brands are acceptable for system components.
- **Valve Boxes and Backflow Prevention:** All valve lids must be lockable, with preferred box dimensions of 15”x26”x15” or equivalent. A lockable backflow enclosure is required.
- **Site Restoration:** Any Bermuda grass disturbed during installation must be restored, with replacement sodding or planting to occur in spring/summer, provided it does not exceed the contract’s period of performance.
- **System Audit:** A full system audit is required post-installation to verify operational integrity across all zones.
- **Safety and Compliance:** Movable barriers must be provided to mitigate safety hazards during inspection periods. Grounding of the system (including a grounding rod and copper wire at the controller) and inclusion of a rain sensor are mandatory.
- **Utility Coordination:** The government will ensure all utilities are marked prior to excavation. The contractor is not liable for unmarked utilities.
- **Access and Staging:** Materials may be stored on-site in a designated laydown area. Parking and staging for equipment are restricted to Parking Lot Six.
- **Work Schedule:** Standard work hours are Monday through Friday, 7:00 AM to 5:00 PM. Weekend work is permitted only for the main water tie-in.
- **Wage Determination:** Department of Labor wage rates apply as specified in Attachment 2 of the solicitation.
- **DBIDS Access:** All personnel must complete DBIDS pre-enrollment and obtain passes for site access, with new passes issued for the project duration.
**Contracting and Evaluation:**
This is a firm-fixed price contract with a period of performance of 240 days from Notice to Proceed (NTP). The acquisition is set aside exclusively for SBA-certified small businesses. Only prime contractors with a publicly visible office within a 120-mile commutable radius of DSCR (as validated on SAM.gov) are eligible. The contractor must list their mobilization address in the proposal.
Award will be made to the lowest priced, technically acceptable (LPTA) offeror who meets all requirements of the SOW and solicitation. Technical acceptability includes a review of past performance, with data pulled from CPARS and SPRS. Partial proposals will not be considered.
**Special Considerations:**
- **Liquidated Damages:** The contract includes a liquidated damages clause of $500 per calendar day for delays beyond the specified completion date.
- **Change Orders:** Any required changes due to site conditions must be processed via contract modification, with proper notification and documentation provided to the Project Manager/Contracting Officer’s Representative (COR).
- **Weather and Base Operations:** The period of performance may be adjusted for delays outside the contractor’s or government’s control.
**Timeline and Submission:**
- **Site Visit:** August 18, 2026, at 10:00 AM (coordinate with Ramy Massey at (804) 929-1846 or [email protected]).
- **Questions Due:** August 19, 2026 (submit to [email protected]).
- **Quotes Due:** August 28, 2026 (submit via email to [email protected]).
- **Award Anticipated:** Before September 30, 2026.
**Contact Information:**
- Contracting Officer: Brandon Jump
- Email: [email protected]
- Phone: 445-737-4512
**Additional Information:**
- Contractors must be registered in SAM (www.sam.gov) prior to award.
- Access requirements and DBIDS enrollment instructions are detailed at https://www.dla.mil/Aviation/Installation/Visitors-and-ID-Office/ and https://dbids-global-enroll.dmdc.mil.
- The solicitation and all attachments are available at https://sam.gov/opp/a6ee10d9441c4c82934422eed16131a9/view.
This opportunity is ideal for small business contractors with demonstrated experience in commercial irrigation system installation, site restoration, and federal construction contracting. The project’s requirements, schedule, and evaluation criteria are clearly defined, ensuring a transparent and competitive selection process.
Documents7