SUMMIT VIEW WATER SYSTEM PIPE REPLACEMENT

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

White River National Forest

Contract Value

Not provided

Codes & Classification
Solicitation Number

1240LT26Q0136

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Classification Code

Y1NE

Additional Details
Set Aside

None

Place of Performance

Thompson, Utah, UNITED STATES

SourceSAM
The U.S. Forest Service, under the Department of Agriculture, is soliciting quotes for the Summit View Water System Pipe Replacement project, located within the Montpelier Ranger District of the Caribou-Targhee National Forest in Bear Lake County, Idaho. This procurement, identified by solicitation number 1240LT26Q0136, seeks qualified contractors to undertake the replacement of a critical waterline servicing the Summit View Campground. The project site is approximately 20 miles north of Montpelier, Idaho, accessible via State Highway 30 and Left-Hand Georgetown Canyon Road (coordinates: 42.5528° N, 111.2957° W). The scope of work encompasses the removal and replacement of approximately 1,770 feet of waterline, originating at Thompson Spring and extending to the iodinator. The replacement will utilize a minimum 2-inch diameter HDPE waterline and includes pipe zone bedding, installation of a utility locating system, air release valve, drains, and a backflow preventer. Additional requirements involve heat fusion joints, trenching, and other incidentals necessary for a complete and functional water system upgrade. All work must be performed in accordance with the attached documentation and specifications, with quantities detailed in the Schedule of Items. The contract will be awarded as a firm fixed price agreement, with an estimated price range between $40,000 and $60,000. The procurement is classified under NAICS code 237110 (Water and Sewer Line and Related Structures Construction), with the applicable Product Service Code Y1NE. Contractors should note that all administrative revisions to the solicitation documents as of July 29, 2026, are strictly wording changes and do not affect the terms or timelines of the project. Key dates for this opportunity include: - Posting Date: July 20, 2026 - Q&A Due Date: July 27, 2026 - Quotes Due Date: July 30, 2026 - Anticipated Award Date: August 5, 2026 Interested contractors are encouraged to arrange a site visit by contacting the Contracting Officer’s Representative (COR). All questions regarding the project should be directed to Mary Jenkins at [email protected]. The primary contracting officer is Lonnie D Root, who can be reached at [email protected]. The contracting entity is the White River National Forest, a federal office under the U.S. Forest Service. The place of performance is listed as Thompson, Utah, though the project description and coordinates indicate the work is to be performed in Bear Lake County, Idaho. Contractors should verify the exact location during the site visit and through direct communication with the COR. This solicitation remains active and is accessible via SAM.gov at https://sam.gov/opp/96a7e8836be24479aa555b0a3c0dc574/view. Contractors evaluating this opportunity should ensure their capabilities align with the requirements for waterline construction, HDPE pipe installation, and related site work in a remote forest environment. The contract’s scope, technical specifications, and administrative requirements are expected to remain constant throughout the contract lifecycle.
Documents9