Ltr Cromwell Maintenance & Storage Facility Modernization Project (Lrmp Tranche 3) 20260715

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

Maryland Transit Administration

Contract Value

Not provided

Codes & Classification
Solicitation Number

BPM057988

NAICS

-

Classification Code

-

Additional Details
Set Aside

None

Place of Performance

Maryland

SourceSLED
The Maryland Transit Administration (MTA) has issued a procurement notice for the modernization of the Cromwell Maintenance and Storage Facility (MSF), located at 7390 Baltimore Annapolis Blvd, Glen Burnie, Maryland. This initiative, identified as the Ltr Cromwell Maintenance & Storage Facility Modernization Project (LRMP Tranche 3), seeks to engage a qualified design-build contractor to deliver comprehensive improvements to the facility. The primary purpose of this project is to prepare the Cromwell MSF for the anticipated acquisition and integration of new Low Floor Light Rail Vehicles (LFLRVs). The scope encompasses both the design and construction phases, ensuring the facility is fully equipped to support the transition from the existing High Floor Light Rail Vehicle (HFLRV) fleet to the new LFLRVs. Key objectives include facilitating the transitioning, training, testing, commissioning, and ongoing maintenance activities associated with the new vehicles. Contractors responding to this opportunity will be expected to deliver a modernized facility that meets the operational requirements of the new LFLRV fleet. This includes, but is not limited to, upgrades and modifications to accommodate the physical and technical specifications of the LFLRVs, as well as enhancements to support staff training and vehicle commissioning processes. The project is integral to MTA’s broader strategy for fleet modernization and service improvement. The contracting entity for this procurement is the Maryland Transit Administration, a state agency responsible for public transportation services in Maryland. All work will be performed within the state, specifically at the Cromwell MSF in Glen Burnie. Interested parties should note that the procurement is being managed through the Maryland state procurement portal, with full details and updates available at https://emma.maryland.gov/page.aspx/en/bpm/process_manage_extranet/96229. While the notice does not specify set-aside requirements, procurement type, or special considerations, contractors should be prepared to demonstrate experience with design-build delivery methods, facility modernization for rail transit operations, and integration of new vehicle technologies. The project timeline, submission requirements, and evaluation criteria will be governed by the Maryland Transit Administration’s procurement policies. This opportunity represents a significant investment in Maryland’s transit infrastructure, with long-term implications for service reliability, operational efficiency, and the successful deployment of new light rail vehicles. Contractors with relevant expertise in transit facility upgrades and vehicle integration are encouraged to review the notice and consider participation.