NIWTP Biosolids Sludge Dryer Alternative Building D/B

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

INTERNAT. BOUNDARY AND WATER COMM.

Contract Value

Not provided

Codes & Classification
Solicitation Number

191BWC26R0010

NAICS

236220 - Commercial and Institutional Building Construction

Classification Code

Y1PD

Additional Details
Set Aside

NONE

Place of Performance

Rio Rico, Arizona, UNITED STATES

SourceSAM
The International Boundary and Water Commission (IBWC), United States Section, is soliciting proposals for a design-build project titled "NIWTP Biosolids Sludge Dryer Alternative Building D/B" at the Nogales International Wastewater Treatment Plant (NIWTP) in Rio Rico, Santa Cruz County, Arizona. This procurement seeks qualified contractors to deliver a comprehensive solution for the design and construction of a new facility dedicated to housing a recently acquired sludge dryer system, as part of ongoing improvements to the NIWTP. **Purpose and Scope** The primary objective of this project is to provide a fully operational, code-compliant, and turn-key building that will accommodate the sludge dryer and its associated equipment. The scope encompasses both design and construction phases, including site investigation, surveying, geotechnical studies, and the development of construction documents and technical specifications. The contractor will be responsible for the demolition of existing belt filter presses and related polymer system components (excluding certain structural and electrical elements), relocation of an existing three-sided metal structure, and all necessary site work, utilities, permitting, and commissioning activities. The end result will be a facility ready for immediate use, with all required utilities (water, sanitary sewer, communications, electrical, fire protection, etc.) and site improvements completed. **Key Requirements and Deliverables** - **Design Phase:** Includes site investigation, surveying, geotechnical analysis, design development, preparation of construction documents, technical specifications, and coordination with stakeholders and regulatory agencies. - **Construction Phase:** Encompasses site preparation, demolition, relocation activities, construction of the new building, installation of all required systems, quality control testing, commissioning, and project closeout. - **Compliance:** All work must adhere to federal, state, and local codes, including NEPA, OSHA, ADA/ABAAS, and relevant environmental and safety regulations. The contractor is responsible for obtaining all necessary permits and coordinating with utility providers. - **Deliverables:** A fully commissioned, turn-key building with all utilities and site improvements, ready for immediate use upon completion. **Contracting Entity and Location** - **Contracting Agency:** International Boundary and Water Commission: US-Mexico (INTERNAT. BOUNDARY AND WATER COMM.) - **Place of Performance:** Nogales International Wastewater Treatment Plant, Rio Rico, Arizona (31°26'56.58"N, 110°57'49.33"W) - **NAICS Code:** 236220 (Commercial and Institutional Building Construction) - **Product Service Code:** Y1PD **Procurement Approach and Timeline** - **Type:** Design-Build (DB), Firm Fixed Price contract - **Period of Performance:** 365 calendar days after Notice to Proceed (NTP), including final paperwork and site cleanup - **Set-Aside:** The government anticipates a small business set-aside, pending market research results - **Solicitation Process:** Two-Phase Design-Build Selection Procedures (FAR Subpart 36.3) - **Phase One:** Evaluation of technical qualifications and capability - **Phase Two:** Evaluation of technical proposal and price **Submission Requirements** Interested offerors will be required to submit: - Qualifications and relevant experience with similar design-build projects - Technical approach and project management plan - Past performance information - Price proposal - Non-Disclosure Agreement (NDA) for site visit **Site Visit and Proposal Deadlines** - **Site Visit:** July 24, 2026, at 10 AM local time. Attendees must submit names and NDA (IBWC Form 358) by July 22, 2026, 3 PM MDT. PPE (hard hat, safety shoes, vest) is required and not provided by IBWC. Maximum two attendees per company. Valid ID required for check-in; all visitors must be escorted by IBWC personnel. - **Questions Due:** August 3, 2026, at 3 PM MDT - **Proposal Due Date:** August 21, 2026, at 3 PM MDT **Additional Considerations** - The estimated project magnitude is between $1 million and $5 million. - All prospective bidders must be registered in the System for Award Management (SAM) with an active Unique Entity Identifier (UEI) and appropriate NAICS code. - Solicitation documents, specifications, and drawings will be available on SAM.gov. Contractors are responsible for monitoring SAM.gov for updates and amendments. - The primary point of contact for this procurement is Seone Michael Jones ([email protected]). **Constant Elements Throughout Contract Lifecycle** - The project location and scope will remain unchanged. - Compliance with all applicable codes and regulations is mandatory. - The design-build, firm fixed price contract structure and two-phase selection process will be maintained. - The requirement for a fully commissioned, operational facility is central to the contract. - All communication and updates will be managed through SAM.gov. This opportunity is well-suited for contractors with proven experience in commercial and institutional building construction, particularly those familiar with wastewater treatment facility upgrades and design-build delivery methods. The project demands technical expertise in both design and construction, robust project management capabilities, and a strong commitment to regulatory compliance and quality assurance. Interested parties should review the solicitation documents and attachments on SAM.gov for detailed requirements and ensure timely submission of all required materials.
Documents13