Exit Gate Modification and Repair - 187th Fighter Wing
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
W7MT USPFO ACTIVITY ALANG 187
Contract Value
Not provided
Codes & Classification
Solicitation Number
W50S6N-26-Q-A021
NAICS
238990 - All Other Specialty Trade Contractors
Classification Code
5660
Additional Details
Documents4
The Department of Defense, through the Department of the Army and the W7MT USPFO ACTIVITY ALANG 187, is soliciting proposals for the modification and repair of the main exit gate at the 187th Fighter Wing, located at 5187 Selma Highway, Montgomery, Alabama. This procurement is issued as a combined synopsis/solicitation under procurement identifier W50S6N-26-Q-A021, and is set aside exclusively for small business concerns under NAICS code 238990 (All Other Specialty Trade Contractors).
The primary objective of this project is to restore and upgrade the main exit gate, ensuring enhanced functionality, reliability, and security for the installation. The scope of work encompasses a comprehensive overhaul of the gate and its supporting structures, including removal and replacement of key components, installation of new support rollers, realignment of gate posts, and modification of mounting brackets. A significant aspect of the project is the conversion of the existing hydraulic roller drive system to a HySecurity extreme drive rack and drive wheel system, which is a brand name requirement. The contractor will be responsible for the re-installation, adjustment, and thorough testing of the gate and operator system to confirm full operational capability.
The solicitation specifies a single line item: Main Exit Gate Modification and Repair, with a quantity of one job. Contractors are expected to provide all necessary labor, materials, and equipment to complete the work as described. The place of performance is Alabama, specifically at the west end of the airport property off old Hayneville Road.
Security and access requirements are integral to this contract. All contractor and subcontractor personnel must comply with installation access protocols, including background checks and personal identity verification in accordance with DoD, HAF, and local policies. AT Level I awareness training is mandatory for all personnel requiring access to government-controlled areas, with certificates of completion maintained by the Contracting Officer’s Representative. Contractors must also adhere to Homeland Security Presidential Directive (HSPD-12) and Federal Information Processing Standards (FIPS PUB 201) for personal identification verification throughout the contract lifecycle.
A pre-quote site visit is planned in accordance with FAR Provision 52.237-1, though the originally scheduled date has been cancelled and will be rescheduled. Interested offerors must provide attendee information in advance for base access, and should be prepared for vehicle searches and compliance with base security protocols.
Proposal submissions are due by 11 August 2026, 5:00 PM local time, and must include complete pricing, as well as descriptions and customer contact information for two relevant past projects performed within the last five years. Evaluation criteria will focus on past performance and price, with award made to the offeror whose proposal represents the best value to the Government.
Additional considerations include compliance with DBA Wage Determination AL20260093 (dated 05/18/2026), and the absence of a Defense Priorities and Allocations System (DPAS) rating for this solicitation. Applicable provisions and clauses are incorporated by reference and can be accessed at www.acquisition.gov; a clause listing is attached to the solicitation.
The contracting entity is a federal office under the Department of Defense, with primary and secondary points of contact as follows:
- Stephen Shanks ([email protected], 334-394-7529)
- Jeremy Hendrick ([email protected], 334-394-7410)
Contractors interested in this opportunity should review the full solicitation and attachments via SAM.gov (Opportunity ID: 7e3a0b29f0ef4ff09a5baeb564e10da0) and ensure alignment with the technical, security, and administrative requirements outlined above. This project represents a critical infrastructure upgrade for the 187th Fighter Wing and requires specialized expertise in gate systems, concrete work, and security compliance.