Multiple Trail Bridges Replacement Project Phase 2

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

USDA-FS, CSA EAST 12

Contract Value

Not provided

Codes & Classification
Solicitation Number

12445226Q0033

NAICS

237310 - Highway, Street, and Bridge Construction

Classification Code

Z1LB

Additional Details
Set Aside

SBA

Place of Performance

Lakemont, Georgia, UNITED STATES

SourceSAM
The "Multiple Trail Bridges Replacement Project Phase 2" represents a significant infrastructure initiative undertaken by the United States Department of Agriculture (USDA) Forest Service, specifically through the CSA EAST 12 office. This project, located in Lakemont, Georgia, is focused on the replacement of multiple trail bridges, aiming to enhance the safety, accessibility, and longevity of recreational and service routes within the designated area. Classified under NAICS code 237310 (Highway, Street, and Bridge Construction), the scope of work falls squarely within the domain of heavy civil construction, with a particular emphasis on bridge replacement. The associated Product Service Code (PSC) Z1LB further clarifies that the project involves maintenance, repair, and alteration of highways, roads, streets, bridges, and railways. The intended outcome is the successful replacement of existing trail bridges to meet current standards, ensuring continued safe passage for both the public and Forest Service personnel. This procurement was set aside for small businesses under the Small Business Administration (SBA) guidelines, reflecting the agency’s commitment to supporting small business participation in federal contracting. Contractors interested in similar future opportunities should note the set-aside status, as eligibility is restricted to SBA-qualified entities. The place of performance is specified as Lakemont, Georgia, within the United States. The project is managed by the USDA-FS, CSA EAST 12 office, a federal entity under the Department of Agriculture’s Forest Service. The primary point of contact for this procurement is Jalisa C. Sims, who can be reached via email at [email protected] for any inquiries related to the project. While the notice is an award announcement and does not include attachments or detailed documentation, it signals the completion of the solicitation phase and the selection of a contractor for the bridge replacement work. Contractors evaluating similar opportunities should be prepared to demonstrate expertise in bridge construction and replacement, compliance with federal and local regulations, and the ability to deliver durable, safe infrastructure improvements in natural or recreational settings. For further details or to monitor related opportunities, interested parties can refer to the official notice on SAM.gov using the Opportunity ID 35647072e14e4bbd81132412a53bd97c. In summary, this project underscores the Forest Service’s ongoing commitment to maintaining and improving critical infrastructure within national forests, with a focus on safety, accessibility, and support for small business contractors.