The Indian Health Service (IHS), under the Department of Health and Human Services, has issued a solicitation notice for the Stephenson-Taylor Water Line Extension project, procurement identifier 75H70126R00038. This construction initiative is managed by the Division of Engineering Services – Seattle and is designed to support the infrastructure needs of Caddo County Rural Water District No. 3 in Oklahoma. The project is classified under NAICS code 237110 (Water and Sewer Line and Related Structures Construction), with a size standard of $45 million, and is set aside exclusively for Indian Small Business Economic Enterprises (ISBEE) in accordance with the Buy Indian Act.
The primary objective of this procurement is to secure all necessary commercial services, equipment, materials, and supplies required to construct a water line extension across three sites in Binger, Oklahoma. The scope of work is comprehensive and includes the following key tasks:
- Furnishing and installing 10,940 feet of 2-inch DR 11 HDPE water main and 870 feet of 4-inch DR11 HDPE casing.
- Directional boring for a total of 815 feet, encompassing two road crossings, one driveway crossing, and one creek crossing.
- Performing two open cut gravel road crossings totaling 55 feet.
- Ensuring proper casing of the water main or maintaining a minimum 5-foot horizontal and 2-foot vertical separation from all gas lines.
- Installing four water main taps, water meters, and service lines to homes, including 400 feet of 1-inch PE and 870 feet of 1.5-inch PE with associated appurtenances.
- Providing and installing appurtenances such as gate valves, flush hydrants, air relief valves, tracer wire, locate stations, anode bays, thrust blocks, and fittings.
- Conducting pressure testing and submitting results to the project engineer.
- Completing disinfection and bacteriological testing of the water main, with two consecutive negative tests required 24 hours apart; any positive results must be re-sampled at the contractor’s expense.
- Connecting the newly installed water line extension to the existing infrastructure of Caddo County Rural Water District No. 3.
The anticipated magnitude of this construction project is between $250,000 and $500,000. The period of performance is set at 90 calendar days from the issuance of the notice to proceed, ensuring a timely completion of all deliverables. IHS intends to award a single Firm Fixed Price (FFP) contract for this requirement, utilizing a Request for Proposal (RFP) process governed by FAR Part 36 procedures. Evaluation will be based on the Lowest Price Technically Acceptable (LPTA) criteria.
A site visit is scheduled for July 24, 2026, at 10:00 AM Central Time, providing prospective offerors an opportunity to assess the project locations and clarify any technical aspects. All dates, including site visits and proposal deadlines, are subject to change; contractors are advised to consult the official solicitation documents for the most current information.
Registration in the System for Award Management (SAM) is mandatory for all offerors. Contractors should ensure their SAM registration is complete and current, as the government will not delay award to accommodate registration issues. All solicitation documents, amendments, and updates will be posted exclusively on https://sam.gov; hard copies will not be provided.
The contracting entity for this project is the Division of Engineering Services – Seattle, with Taylor Kanthack serving as the primary point of contact ([email protected], 240-478-1501). Interested parties should direct all inquiries and correspondence to this contact.
This opportunity is well-suited for ISBEE-certified firms with expertise in water and sewer line construction, particularly those familiar with HDPE installations, directional boring, and rural water infrastructure projects. The requirements and deliverables are clearly defined, and the project’s scope, location, and performance period are consistent throughout the contract lifecycle. Contractors are encouraged to review the full solicitation and associated documents on SAM.gov for detailed specifications, wage determinations, and proposal instructions.
For further information and to access the solicitation, visit: https://sam.gov/opp/63c793ad97e646cc91dce4bb5bf865bb/view.