9330--Acrovyn Handrail and End Cap
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
262-NETWORK CONTRACT OFFICE 22 (36C262)
Contract Value
Not provided
Codes & Classification
Solicitation Number
36C26226Q0897
NAICS
326199 - All Other Plastics Product Manufacturing
Classification Code
9330
Additional Details
Documents5
The Department of Veterans Affairs (VA), through its Network Contracting Office 22, has issued a Combined Synopsis/Solicitation (Procurement Identifier: 36C26226Q0897) for the procurement and installation of Acrovyn handrails and end caps at the Greater Los Angeles VA Healthcare System, specifically in Building 500 located at 11301 Wilshire Blvd, Los Angeles, CA 90073. This procurement is classified under NAICS Code 326199 (All Other Plastics Product Manufacturing) and Product Service Code 9330.
**Purpose and Scope:**
The primary objective of this procurement is to replace the outdated and non-compliant handrails in the main hospital building, which have not been updated since the early 1990s. Many of the existing handrails are broken, lack available replacement parts, and fail to meet current ADA and Infection Control standards, posing safety risks to patients, staff, and visitors. The intended outcome is to enhance safety, accessibility, and compliance with regulatory requirements throughout inpatient areas and common corridors.
**Key Requirements and Deliverables:**
The solicitation calls for the supply and installation of:
- 10,000 linear feet of Acrovyn 4000 Woodgrain/Brushed Metal patterned Handrail, Model HRB-4CPN, featuring a blunt-shaped profile, 1-1/2" grip surface, and 5-1/2" face, with a quick lock mounting system. The specified color is 1312 Burmese Teak. All covers, recycled bumpers, and aluminum retainers must be included, with maximum unit lengths of 10 feet.
- 600 units of Acrovyn 4000 Woodgrain/Brushed Metal patterned End Caps for Model HRB-4CPN, also in color 1312 Burmese Teak.
No substitutions are permitted regarding model, color, installation method, mounting system, or dimensions. All components must be installed in accordance with manufacturer guidelines and applicable safety codes.
**Compliance and Safety:**
Contractors must adhere to all relevant Federal, State, and VA safety and fire regulations, including OSHA standards (29 CFR Parts 1910 and 1926), NFPA 70E, and Joint Commission quality assurance standards. All personnel must use appropriate Personal Protective Equipment (PPE) and comply with VA policies regarding identification, parking, and the VHA’s comprehensive smoke-free policy. Possession of weapons or contraband is strictly prohibited on VA premises.
**Vendor and Personnel Requirements:**
Installers are required to check in with Supply Chain Management upon arrival and obtain a vendor badge. For one-time visits, documentation confirming no active pulmonary disease or a negative TB test, proof of influenza vaccination, and a COVID-19 vaccination card are required.
**Insurance and Invoicing:**
The contractor must maintain Workers Compensation and Employee Public Liability Insurance as per Federal and California State laws, with proof of coverage provided within 15 days of contract award. Invoices are to be submitted in arrears upon satisfactory completion of services, referencing all relevant contract and purchase order numbers.
**Procurement Process and Submission Instructions:**
This is a combined synopsis/solicitation, and the government intends to award without discussions; therefore, initial offers should reflect the best terms. Quotes must be submitted electronically in PDF format (max 10MB per email) to Sam Choo at [email protected] by July 20, 2026, 10:00 AM PDT. All offerors must be registered in SAM.gov and, if applicable, verified as SDVOSB or VOSB through the SBA. An authorization letter from the OEM, dated within 90 days of the offer deadline, is required to demonstrate authorized dealer/distributor/reseller status.
**Contracting Entity and Contact Information:**
- Contracting Office: Department of Veterans Affairs, Network Contracting Office 22, 4811 Airport Plaza Drive, Suite 600, Long Beach, CA 90815
- Contracting Officer: Anthony Dela Cruz
- Contracting Officer’s Representative: Clifford Somers, Engineering, 11301 Wilshire Blvd, Los Angeles, CA 90073, [email protected], 213-247-7064
- Primary Point of Contact for Offers/Questions: Sam Choo, [email protected]
**Period of Performance:**
All materials must be delivered and work completed within 60 days of contract award. The period of performance excludes federal holidays as specified in the solicitation.
**Special Considerations:**
- No site visit is scheduled.
- All submissions must be complete and responsive to the solicitation requirements; incomplete offers will not be considered.
- The government reserves the right to reject any or all offers, accept other than the lowest offer, and waive minor irregularities.
This opportunity is suitable for contractors with experience in supplying and installing specialized handrail systems in healthcare environments, with the ability to meet stringent compliance, safety, and documentation requirements. The project is a one-time procurement with a defined scope and timeline, and all terms and conditions not amended remain in full effect throughout the contract lifecycle.
For full details and attachments, refer to the official notice at: https://sam.gov/opp/d520c95456ef434faff84f1d3f4e736b/view