USS MAKIN ISLAND (LHD-8), Ships Service Diesel Generators (SSDGs) Long Lead Time Material (LLTM) Direct Item Replacements
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
SOUTHWEST REGIONAL MAINT CENTER
Contract Value
Not provided
Codes & Classification
Solicitation Number
N5523626R0013
NAICS
333618 - Other Engine Equipment Manufacturing
Classification Code
2815
Additional Details
Documents4
The Department of the Navy, through the Southwest Regional Maintenance Center (SWRMC) in San Diego, California, has issued a combined synopsis/solicitation (Procurement Identifier: N5523626R0013) for the expedited procurement of long lead time material (LLTM) direct replacement parts for the Ships Service Diesel Generators (SSDGs) aboard the USS MAKIN ISLAND (LHD-8), a Wasp-class amphibious assault ship. This procurement is critical to support the repair and maintenance of six SSDGs, ensuring the vessel’s operational readiness and mission capability.
**Purpose, Scope, and Intended Outcomes:**
The primary objective of this procurement is to acquire 725 distinct direct replacement parts required for the repair and maintenance of the ship’s SSDGs. These parts are essential for sustaining the ship’s power generation systems, which are vital to the vessel’s overall functionality and mission success. The procurement is classified as a long lead time material acquisition, reflecting the extended manufacturing and delivery timelines associated with these specialized components.
**Key Requirements, Objectives, and Deliverables:**
- The procurement is for commercial products, specifically OEM (Original Equipment Manufacturer) parts, to ensure compatibility and reliability.
- All parts must be sourced directly from Fairbanks Morse Defense (FMD), the OEM for the SSDGs, as stipulated in the Product Description (Attachment J-1).
- The contract encompasses 725 unique parts, each necessary for the comprehensive repair and maintenance of six SSDGs.
- Delivery is required F.O.B. Destination, with inspection and acceptance at the destination by the Government.
- Packaging and preservation must adhere to best commercial practices to maximize protection against damage.
- Standard commercial warranties will apply to all delivered items.
**Contracting Entity and Contact Information:**
- Contracting Entity: Southwest Regional Maintenance Center (SWRMC), Department of the Navy, Department of Defense
- Place of Performance: San Diego, California, United States
- NAICS Code: 333618 (Other Engine Equipment Manufacturing)
- Product Service Code: 2815
- Primary Contact: Kristin Liljestrom, [email protected], 619-708-3630
- Secondary Contact: Mira Maje Brown, [email protected], 619-708-0826
**Procurement Type, Set-Aside, and Special Considerations:**
- This is a sole source procurement under FAR Part 12, with the Government intending to contract exclusively with Fairbanks Morse Defense for the required parts.
- The solicitation is not open to competitive proposals; the determination not to compete is at the Government’s discretion.
- The applicable set-aside type is listed as 8AN, though the procurement is sole source to the OEM.
- The Defense Priorities and Allocations System (DPAS) rating is DO-A3, indicating the procurement’s priority for national defense.
- Sensitive Activity and Intelligence-Related Contracting (SAIRC) protections are not required for this action.
- A Small Business Subcontracting Plan is required if the offeror is other than a small business and the contract exceeds the applicable threshold, in accordance with FAR 52.219-9.
**Evaluation and Submission Details:**
- The Government will evaluate offers based on technical acceptability (ability to meet delivery requirements and product specifications) and price, using a Lowest Price Technically Acceptable (LPTA) methodology.
- All questions regarding the solicitation must be submitted in writing by 05 September 2026, 2:00 PM (San Diego local time).
- Quotes must be submitted via email to the designated contacts and received no later than 09 September 2026, 2:00 PM (San Diego local time).
- The current amendment (Amendment 0001) extends the COMSS due date to 23 October 2026, 2:00 PM (Pacific), and provides an updated Product Description (PD REV 1).
**Applicable Provisions and Clauses:**
The solicitation incorporates a comprehensive set of FAR and DFARS clauses, including but not limited to those addressing subcontractor sales restrictions, equal opportunity, Buy American requirements, sustainable products, electronic payment, and cybersecurity. NAVSEA-specific clauses are also included as an attachment.
**Constant Elements Over Contract Lifecycle:**
- The requirement for OEM-supplied, direct replacement parts for the SSDGs will remain unchanged.
- The place of performance will consistently be San Diego, California.
- The contract will be administered by SWRMC, Department of the Navy.
- Compliance with the incorporated FAR and DFARS clauses, as well as standard commercial warranties and packaging requirements, will be maintained throughout the contract period.
**Summary for Contractors:**
This opportunity is highly specialized and limited to Fairbanks Morse Defense as the OEM for the required SSDG parts. Contractors should note the sole source nature of the procurement, the criticality of timely delivery, and the comprehensive compliance requirements. The procurement supports a high-priority defense asset and is governed by stringent federal acquisition regulations. Interested parties must ensure all submissions are complete, timely, and in accordance with the detailed instructions provided in the solicitation.
For further details, including the full product description and applicable clauses, refer to the solicitation documents and attachments available at the provided SAM.gov link: https://sam.gov/opp/66f61ddb3bc341169d353d436113fc7c/view.