Q4 FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

W2SD ENDIST BALTIMORE

Contract Value

Not provided

Codes & Classification
Solicitation Number

W912DR26BA004_

NAICS

237990 - Other Heavy and Civil Engineering Construction

Classification Code

Z1KF

Additional Details
Set Aside

None

Place of Performance

-

SourceSAM
The U.S. Army Corps of Engineers, Baltimore District (W2SD ENDIST BALTIMORE), has issued a presolicitation notice for the Q4 FY26 Baltimore Harbor and Channels Maintenance Dredging project, targeting the Maryland Channels within the Chesapeake Bay, MD. This significant maintenance effort is designed to ensure the continued navigability and operational efficiency of the deep-draft federal navigation channels serving the Port of Baltimore, a critical hub for commercial maritime activity. The scope of work encompasses the dredging of approximately 2,250,000 cubic yards (cy) of material from designated federal channels. Specifically, the project will remove about 1,538,000 cy from the Maryland approach channels—including the Craighill Entrance, Craighill Angle, Cutoff Angle, and Upper Range Channels—with the dredged material to be transported and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. An additional 700,000 cy will be dredged from the Baltimore Harbor Channels, namely the Brewerton Angle and Curtis Bay Channels, and placed at the Cox Creek Dredged Material Containment Facility. Dredging operations are scheduled to occur between November 2026 and March 2027, with a performance period of approximately 120 calendar days from the issuance of the Notice-to-Proceed. The required dredging depth for all channels is 50 feet mean lower low water (MLLW), with an allowable overdepth of 1 to 2 feet. The work will be conducted in heavily trafficked commercial waterways, necessitating careful coordination and robust operational planning. Contractors should anticipate the need for substantial marine equipment, including two or more clamshell dredges with capacities exceeding 30 cubic yards, a 24 to 30-inch hydraulic unloader, six to eight large tugs, six to eight material scows ranging from 2,500 to 6,000 cubic yards, a drag bar and barge, as well as the necessary attendant plant and pipeline infrastructure. Dredging will be performed using clamshell/bucket and scow methods. The estimated magnitude of construction for this project is between $25,000,000 and $100,000,000. The procurement is classified under NAICS code 237990 (Other Heavy and Civil Engineering Construction), with a Product Service Code of Z1KF. The solicitation is anticipated to be released on or about July 10, 2026, with responses due by July 10, 2026. This opportunity is managed by the Department of Defense, Department of the Army, and all inquiries should be directed to the primary point of contact, Ashley Flaherty, at [email protected] or 410-962-5626. Contractors with proven experience in large-scale dredging operations, marine logistics, and material placement in environmentally sensitive and high-traffic waterways are encouraged to monitor this opportunity. The project’s complexity, scale, and operational environment require a high level of technical capability, resource availability, and adherence to federal performance and safety standards. Interested parties should review the forthcoming solicitation for detailed requirements and submission instructions. For further information and updates, please refer to the official notice at: https://sam.gov/opp/9c88cf1b086e418f9e76cb711b0ad562/view.