Z1DA--556-24-113 Oil Transformer and Switch Enclosure Upgrades

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

252-NETWORK CONTRACT OFFICE 12 (36C252)

Contract Value

Not provided

Codes & Classification
Solicitation Number

36C25226B0029

NAICS

238210 - Electrical Contractors and Other Wiring Installation Contractors

Classification Code

Z1DA

Additional Details
Set Aside

None

Place of Performance

-

SourceSAM
Documents4
The Department of Veterans Affairs, through its 252-Network Contract Office 12, has issued a solicitation (Procurement Identifier: 36C25226B0029) for a comprehensive construction project titled "Oil Transformer and Switch Enclosure Upgrades" at the Captain James A. Lovell Federal Health Care Center (FHCC), located at 3001 Green Bay Rd, North Chicago, IL 60064. This initiative, identified as Project Number 556-24-113, is classified under NAICS Code 238210 (Electrical Contractors and Other Wiring Installation Contractors) and Product Service Code Z1DA, reflecting its focus on electrical infrastructure improvements. The primary objective of this procurement is to enhance the reliability, safety, and compliance of the FHCC’s electrical distribution systems. The scope of work encompasses the replacement of medium voltage oil-filled transformers serving multiple campus buildings (1, 3, 9, 11, 66, 137, and 187). Specifically, the project involves replacing four 150 KVA transformers, two 300 KVA transformers, and one 750 KVA transformer, with the additional requirement to relocate the 150 KVA transformer at building 3. The contractor will also be responsible for replacing the electrical distribution switchboards at buildings 137 and 3, as well as installing new concrete pads for transformers at buildings 9, 66, 187, and the new location at building 3. To further enhance site security and safety, anti-ram rated bollards are to be installed at all transformer locations. The contract mandates that the selected contractor provide all necessary tools, materials, labor, quality assurance, and supervision to deliver a complete and fully functional project. A robust quality assurance and safety plan is expected, with an emphasis on minimizing disruptions and avoiding rework. The contractor is required to expedite both planning and execution, particularly with respect to the procurement of long-lead equipment, to ensure that work proceeds without interruption and that all milestones are met efficiently. The anticipated period of performance is approximately 357 calendar days from the Notice to Proceed, with a detailed sequence of milestones outlined in the solicitation. These include submission and review phases for Division 01 and Division 02+ documents, procurement and delivery of long-lead items, mobilization, demolition, construction, and project closeout. The general contractor is responsible for coordinating the schedule, including the submission of factory ship date commitments and optimizing the timeline to reduce field disruption and costs. Prospective bidders are advised that a single pre-bid conference will be scheduled to allow observation of current site conditions; no additional site visits are anticipated. The event will be informational only, with no questions permitted during the walkthrough. All inquiries must be submitted as formal Requests for Information (RFIs) in accordance with solicitation instructions, ensuring a transparent and equitable process for all participants. The contracting activity is managed by the Department of Veterans Affairs, with Lynn H VanderVelde serving as the primary point of contact ([email protected]). The solicitation is currently active, with a response deadline of August 11, 2026. Interested contractors are encouraged to review all solicitation documents and attachments available via the official SAM.gov opportunity listing (Opportunity ID: 1e55ab346ebe4b28875c966674b8e31c). This opportunity is well-suited for experienced electrical contractors with demonstrated capabilities in medium voltage transformer replacement, switchgear upgrades, and associated civil works. Firms must be prepared to adhere to stringent quality, safety, and scheduling requirements, and to coordinate closely with VA representatives throughout the project lifecycle.