FPC Yankton - Above Ground Storage Tanks
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
FPC YANKTON
Contract Value
Not provided
Codes & Classification
Solicitation Number
15B41626Q00000006
NAICS
237120 - Oil and Gas Pipeline and Related Structures Construction
Classification Code
Y1NA
Additional Details
The Federal Bureau of Prisons, specifically the Federal Prison Camp (FPC) Yankton in Yankton, South Dakota, has issued a combined synopsis/solicitation (Solicitation No. 15B41626Q00000006) for the replacement of an underground fuel storage tank with a new above ground storage tank and associated fuel dispensing system. This procurement is conducted in accordance with FAR Part 12 (Acquisition of Commercial Products and Commercial Services) and FAR Part 36 (Construction and Architect-Engineering Contracts), and is set aside exclusively for small business concerns under NAICS code 237120 (Oil and Gas Pipeline and Related Structures Construction), with a small business size standard of $45 million.
**Purpose and Scope:**
The primary objective of this project is to enhance the fuel storage and dispensing infrastructure at FPC Yankton by decommissioning and removing an existing 2,500-gallon underground storage tank and replacing it with a modern, compliant above ground storage solution. The scope of work encompasses all labor, materials, equipment, and incidentals necessary to complete the removal, site remediation, and installation of the new system, ensuring compliance with all applicable safety, environmental, and regulatory standards.
**Key Requirements and Deliverables:**
- **Decommissioning and Removal:** The contractor must notify the Department of Agriculture and Natural Resources (DANR) 30 days prior to tank removal, decommission the existing fuel dispenser, and safely isolate the fueling system. Tasks include de-energizing and disconnecting electrical wiring per NFPA 70, pumping out and disposing of residual fuel in accordance with API RP 1604, rendering the tank vapor-free, and excavating and disposing of the old tank, piping, and Gasboy pump. A certified site assessment with soil sampling is required, with results submitted to DANR for a closure letter.
- **Site Preparation and New Installation:** The contractor will backfill the excavation to 95% standard proctor density, grade for a new tank pad, and install a 6-inch compacted stone base. A new 6-inch thick, 4000 psi reinforced concrete pad with #4 rebar will be poured to support a 3,000-gallon split compartment, double-wall above ground storage tank (500 gallons diesel, 2,500 gallons unleaded), UL 142 listed. The tank must be anchored and equipped with atmospheric and emergency vents, level gauge, anti-siphon valve, ground-level fill with spill containment, continuous leak detection, overfill prevention, electronic tank gauge with high-level alarm, field-mounted driver gauge, and graduated gauging rod.
- **Fuel Dispensing System:** Installation includes a raised concrete fuel island pad and two new Gasboy 9823K-F Astra (or equal) fuel dispensers with pulse output, UL-listed hoses, breakaways, nozzles, dispenser sumps, and entry boots. Dispensers must be calibrated, tested, and certified by Weights & Measures.
- **Automated Fuel Tracking:** The system must integrate with a new automated fuel tracking system, including a key fob reader and data entry terminal at the island, connected to a controller in the Garage Office and backed up by generator power. The contractor must provide 30 unique vehicle key fobs and 2 general key fobs.
- **Testing and Protection:** The contractor will perform pressure/leak testing and install protective concrete-filled steel bollards around the tank and dispensing area.
- **Documentation and Compliance:** All work must adhere to the Statement of Work/Specifications and applicable regulatory requirements. Offerors must submit a specification sheet and product submittals with their quotation.
**Contracting Entity and Contact Information:**
- **Contracting Office:** FPC Yankton, Federal Bureau of Prisons, Department of Justice
- **Location:** Yankton, South Dakota, United States
- **Primary Contact:** Dominick Warmbein
- **Email:** [email protected]
- **Phone:** 605-665-3262 ext. 1112
**Procurement Details and Special Considerations:**
- **Set-Aside:** This is a 100% small business set-aside. Only small businesses registered under NAICS 237120 in SAM.gov are eligible.
- **Performance Period:** 161 calendar days from the notice to proceed.
- **Submission Requirements:** Quotations must be submitted electronically via the Contract Opportunity website (https://www.sam.gov). Faxed or hand-delivered quotes will not be accepted. Offerors must be registered in SAM.gov and have the appropriate NAICS code listed.
- **Site Visit:** A site visit is scheduled to allow vendors to assess existing conditions. Attendance is encouraged but not mandatory. All attendees must submit NCIC background check forms by the specified deadline and receive prior approval.
- **Key Dates:**
- NCIC Forms Due: June 29, 2026, 9:00 AM CDT
- Site Visit: July 8, 2026, 9:00 AM CDT
- Questions Due: July 10, 2026, 11:00 AM CDT
- Quotation Deadline: July 17, 2026, 11:00 AM CDT
- **Payment Terms:** Payment will be made via Electronic Funds Transfer (EFT) in accordance with FAR 52.232-33.
- **Access to Documents:** All solicitation documents and amendments are available exclusively through SAM.gov. Vendors must have an active SAM registration and a valid MPIN to access secure documents.
**Constant Elements Over Contract Lifecycle:**
- The project is governed by federal procurement regulations and is strictly limited to small business participation under the specified NAICS code.
- All work must be performed at FPC Yankton, a federal correctional facility, with adherence to security and safety protocols.
- Compliance with environmental, safety, and regulatory standards is mandatory throughout the project.
- Communication with the contracting office and submission of required documentation will be conducted electronically.
This opportunity is well-suited for small businesses with expertise in fuel storage tank removal and installation, site remediation, and fuel dispensing systems, particularly those familiar with federal, state, and industry standards for such work. Interested contractors should review the full Statement of Work and solicitation attachments on SAM.gov and ensure timely submission of all required documentation and background checks for site access.
Documents6