The U.S. Army Corps of Engineers (USACE), Nashville District, is conducting market research for a significant rehabilitation project at the Wolf Creek Powerhouse in Jamestown, Tennessee. This notice, titled "Wolf Creek Turbine Generator Rehab" (Procurement Identifier: W912P527T1BX9), is a Sources Sought Request for Information (RFI) and is not a solicitation for bids or proposals. The primary purpose is to identify qualified contractors capable of executing a comprehensive overhaul of the facility’s Francis turbine generator units, with an estimated project magnitude between $100 million and $250 million.
The scope of work encompasses the design, manufacture, and installation of new Francis turbines, improvements to dissolved oxygen levels, rewinding of generator units (specifically Units 1-3 and Unit 5), and refurbishment of associated equipment and components for all six units. The project aims to significantly enhance the effectiveness, efficiency, and reliability of the hydropower units, thereby supporting the local community with cost-effective power and contributing to the broader hydropower rehabilitation efforts across the Cumberland River System.
Key requirements include:
- Application of advanced design methodologies, such as Computational Fluid Dynamics (CFD) and physical performance modeling, to develop aerating capabilities for the replacement turbines.
- Concurrent generator rewinding with turbine supply and installation.
- Coordination with government-led asbestos abatement activities, which may require contractors to pause work on individual units for 6 to 8 weeks.
- Detailed mechanical and electrical tasks, including hydraulic modeling, disassembly and refurbishment of generator and turbine components, installation of new head covers and wicket gates, guide and thrust bearing refurbishment, supply of turbine oil, installation of RTDs, replacement of cooling and packing water piping, and comprehensive unit reassembly.
- Electrical work such as prototype coil testing, stator coil and core supply and installation, rotor field pole refurbishment, collector ring and brush maintenance, generator special field tests, start-up and commissioning, and replacement of generator leads and cable trays.
- Optional tasks and spare parts provision, as well as model validation testing.
The anticipated North American Industry Classification System (NAICS) code is 237990 (Other Heavy and Civil Engineering Construction), with a size standard of $45 million. The Product Service Code is Y1PZ. The place of performance is Jamestown, Tennessee, United States.
The contracting entity is W072 ENDIST NASHVILLE, a federal office under the Department of Defense, Department of the Army. The primary point of contact for this notice is Alison Abernathy ([email protected]).
Contractors responding to this RFI are requested to provide detailed past performance information, specifically listing three projects completed within the past ten years that demonstrate experience in major Francis turbine generator rehabilitation, either as a prime contractor or subcontractor. Additional information requested includes business classification under the NAICS code, subcontracting plans, bonding capacity, willingness to bid under various contract scenarios, compliance with the Buy American Act, and input on contract duration, escalation adjustment commodities, and pre-award data needs.
Responses are due by 1:00 PM Central Time, July 9, 2026, and should be submitted via email to Alison Abernathy. Participation in this RFI is non-binding and does not preclude firms from future solicitations.
This opportunity is ideal for contractors with substantial experience in hydropower facility rehabilitation, particularly those with expertise in Francis turbine generator systems. The project requires a multidisciplinary approach, encompassing advanced engineering, manufacturing, installation, and commissioning capabilities, as well as the ability to coordinate with government-led environmental and safety activities. Contractors should carefully review the requirements and consider their capacity to deliver on the technical, logistical, and compliance aspects of this complex, high-value project.
For further details and updates, contractors are encouraged to monitor the official notice at https://sam.gov/opp/f3cae3cf5b47434ab70c815b712cee3f/view.