RWP - High Pressure Air System Expansion

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

FA9101 AEDC PKP PROCRMNT BR

Contract Value

Not provided

Codes & Classification
Solicitation Number

FA9101269_HPASE

NAICS

-

Classification Code

5430

Additional Details
Set Aside

None

Place of Performance

Arnold AFB, Tennessee, UNITED STATES

SourceSAM
Documents2
The United States Air Force, through the Air Force Test Center (AFTC)/PZIA at Arnold Air Force Base (AFB), Tennessee, is seeking industry input via a Sources Sought/Request for White Papers (RWP) for the High Pressure Air Storage Expansion (HPASE) project. This initiative is being conducted under the authority of 10 U.S.C. § 4022, which enables Other Transactions for Prototype (OTP) projects, and is managed by the Arnold Engineering Development Complex (AEDC). The RWP process is the initial phase of a multi-step solicitation, with the intent to identify innovative, technically sound, and sustainable solutions for expanding and modernizing the high pressure air (HPA) storage infrastructure at AEDC. **Purpose and Scope** The HPASE project addresses critical capacity and lifecycle limitations of the existing HPA system, which is essential for AEDC’s testing operations. The current storage vessels are approaching the end of their service life and cannot meet projected testing demands. The project’s primary goal is to design, fabricate, install, and commission two new, independent, and fully operational HPA storage systems at specified locations within Arnold AFB. This includes the replacement of legacy storage vessels and the addition of new capacity to ensure the facility’s ability to support current and future mission requirements. **Key Requirements and Objectives** Offerors are expected to propose comprehensive solutions that encompass all aspects of engineering, design, analysis, procurement, demolition of specified legacy components, fabrication, installation, inspection, and testing. The new systems must be generally consistent in form and function with existing installations, scaled as required, and fully integrated with the current HPA distribution infrastructure. Critical performance parameters include: - **Storage Capacity:** - Location 1: 27,000 ft³ (±5%) - Location 2: 6,800 ft³ (±5%) - **Operating Pressure:** Minimum 4,400 PSIG for the distribution system. - **Pressure Loss:** No more than 50 PSID from any vessel’s discharge to the system connection point. - **System Integration:** Seamless connection to existing headers (NPS 4 for Location 1, NPS 18 for Location 2) with double-block-and-bleed valve protection. - **Control System Compatibility:** All control hardware and software must integrate with AEDC’s existing systems, specifically utilizing Emerson RX3i PLCs, Proficy Machine Edition 9.5, and Cimplicity 9.5 for HMI. **Technical and Site Constraints** - **Vessel Fabrication:** Vessels must be integrally forged, single-wall, ASME BPVC Section VIII, Div. 1 compliant, and National Board registered. Layered vessels and any welding on the vessel (including for lugs) are not permitted. Material must be low alloy steel, ASME SA-372, Grade L. - **Design Life:** Vessels must be rated for a 40-year design life, withstanding 204 full pressurization/depressurization cycles and 100 blow down cycles annually. - **Configuration:** Each vessel must have a minimum volume of 94.8 ft³, a 24-inch outside diameter, and specified nozzle configurations. - **Site Installation:** Installations are restricted to designated “Bottle Farm Location” boundaries. Location 2 may require a pipe bridge over Schriever Ave. - **Data Rights:** The Government will retain Unlimited Data Rights to all technical data, analysis, drawings, software, and code produced. **Submission and Evaluation Process** Interested parties are invited to submit a white paper (maximum 15 pages) detailing their technical approach, relevant corporate experience (with emphasis on ASME and high-pressure vessel projects), key personnel qualifications, a notional schedule with milestones, a rough order of magnitude (ROM) cost estimate, and justification for compliance with 10 U.S.C. § 4022 award conditions. White papers will be evaluated on technical merit, understanding of objectives, relevant experience, and the credibility of the proposed path to a fully integrated and sustainable solution. **Security and Compliance** Offerors must be compliant with NIST SP 800-171 and CMMC Level 2 (Self) certification requirements. Access to protected requirements documents will be granted upon verification of certification and company CAGE code. All submissions and communications must be handled as Controlled Unclassified Information (CUI). **Contracting Entity and Contact Information** - **Contracting Office:** FA9101 AEDC PKP PROCRMNT BR, Air Force Test Center (AFTC)/PZIA, Arnold AFB, TN - **Department/Agency:** Department of Defense, Department of the Air Force - **Primary Contact:** Haley Smith ([email protected]) - **Secondary Contact:** Paytonne Szatkowski ([email protected]) - **Product Service Code:** 5430 (Storage Tanks) - **Place of Performance:** Arnold AFB, Tennessee, United States **Procurement Type and Special Considerations** This opportunity is not a traditional FAR-based procurement but is being conducted under Other Transaction Authority (OTA) for prototype projects. Offerors must demonstrate compliance with at least one of the following: significant participation by a nontraditional defense contractor or nonprofit research institution, all significant participants are small businesses or nontraditional defense contractors, or at least one third of the project cost is funded by non-federal sources. **Submission Deadline and Instructions** White papers are due by July 10, 2026, at 1:00 PM Central Time. Submissions must be in PDF format and emailed to both the Agreements Officer and Agreements Specialist. The subject line should read: “RWP Submission for HPASE Project - [Offeror Name].” Proprietary information, if included, must be clearly marked on each page. **Conclusion** The HPASE project represents a significant opportunity for qualified contractors with expertise in high-pressure air systems, ASME pressure vessel fabrication, and complex system integration. The Government seeks innovative, reliable, and sustainable solutions that will ensure the operational utility and longevity of AEDC’s critical test infrastructure. Interested parties are encouraged to review the full RWP and associated appendices for detailed requirements and to submit a comprehensive white paper by the stated deadline. For further details and access to protected documents, contact the Agreements Officer or Specialist as listed above. The official notice and any updates can be found at: https://sam.gov/opp/ca73fd321a3940439184d6e4a5c0e917/view