U.S. Coast Guard Pease Building Mini-Split HVAC System Install
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
BASE SEATTLE(00033)
Contract Value
Not provided
Codes & Classification
Solicitation Number
70Z03326Q201900005
NAICS
238220 - Plumbing, Heating, and Air-Conditioning Contractors
Classification Code
N041
Additional Details
The U.S. Coast Guard, under the Department of Homeland Security, is soliciting quotes for the procurement and installation of a mini-split HVAC system at the Pease Building, located at Air Station Port Angeles, Washington. This project is managed by BASE SEATTLE (00033) and is classified under NAICS code 238220 (Plumbing, Heating, and Air-Conditioning Contractors), with Product Service Code N041, specifically covering the installation of refrigeration, air conditioning, and air circulating equipment. The procurement is set aside exclusively for small businesses, in accordance with SBA requirements.
The primary objective of this contract is to enhance the climate control capabilities within four crew duty rooms by installing one new heat pump and four associated indoor mini-split units. The contractor will be responsible for providing all necessary labor, materials, equipment, transportation, supervision, and services to ensure a complete and functional installation. The intended outcome is to deliver independent and adequate temperature control for the designated spaces, thereby improving comfort and operational efficiency for Coast Guard personnel.
The scope of work includes, but is not limited to, the following key tasks: procurement and installation of HVAC equipment, review and inspection of the electrical system’s capacity, initial and final performance testing, component adjustment and balancing, thermostat and control verification, and site cleanup. The contractor must also submit a final performance verification report. All work must be completed within the specified period of performance, with a firm completion date of July 31, 2026.
The procurement will be conducted as a firm-fixed-price purchase order, and the government intends to award to the lowest cost, responsible, and responsive quoter who provides the most advantageous and reasonable offer. Prospective contractors must be registered in the System for Award Management (SAM) prior to award.
Interested offerors are strongly encouraged to attend a site visit scheduled for June 18, 2026, between 8:00 AM and 1:00 PM PDT at the project location (1 Ediz Hook Rd, Port Angeles, WA 98362). Site visit arrangements must be made by emailing Alec MacLeod at [email protected] no later than June 15, 2026.
Questions regarding the solicitation must be submitted in writing to Contract Specialist Patrick Gittings at [email protected], referencing RFQ number 70Z03326Q2010900005 in the subject line. The deadline for questions is 3:00 PM PDT on June 25, 2026. Responses will be posted on SAM.gov to ensure equal access for all vendors.
Quotes must be submitted electronically to [email protected] by July 6, 2026, at 3:00 PM PDT. Submissions must include three parts: (1) a completed and signed SF 1449 with the total firm-fixed-price bid, (2) a detailed price breakdown (not exceeding one page) itemizing major tasks, and (3) a technical proposal (not exceeding two pages) outlining the technical approach, list of major materials and equipment (including technician and firm certifications, test instruments, and calibration certificates), and a high-level project schedule with milestones from Notice to Award through completion.
Extraneous materials such as promotional brochures or generic cover letters are prohibited and will not be evaluated. Only the requested information should be submitted.
For further information, contractors may refer to the official notice on SAM.gov (Opportunity ID: d85e3f4c9d5d4ac992089365c6a61608) or contact the primary point of contact, Patrick Gittings, at [email protected] or 571-610-4474.
This opportunity is ideal for small business contractors specializing in HVAC installation, particularly those with experience in government facility upgrades and compliance with federal procurement requirements. The project’s requirements and deliverables are clearly defined, and the contract terms are expected to remain constant throughout the lifecycle.
Documents8