FCI Marion - Replace Summer Boiler #2

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

FAO

Contract Value

Not provided

Codes & Classification
Solicitation Number

15BBNF26Q00000093

NAICS

238220 - Plumbing, Heating, and Air-Conditioning Contractors

Classification Code

Z2FF

Additional Details
Set Aside

NONE

Place of Performance

Marion, Illinois, UNITED STATES

SourceSAM
The Federal Bureau of Prisons (BOP), through its Field Acquisition Office (FAO), has issued a combined synopsis/solicitation for the replacement of Summer Boiler #2 at the Federal Correctional Institution (FCI) Marion, located at 4500 Prison Road, Marion, Illinois. This procurement, identified by solicitation number 15BBNF26Q00000093, seeks qualified contractors to provide all necessary equipment, labor, materials, and incidentals required to remove the existing 4,800 MBTU summer boiler and install a new 7,500 MBTU watertube boiler system. The project is governed by the requirements of FAR Part 12 (commercial products/services) in conjunction with FAR Part 36 (construction), and is classified under NAICS code 238220 (Plumbing, Heating, and Air Conditioning Contractors). **Purpose and Scope** The primary objective of this contract is to modernize the facility’s steam generation infrastructure by replacing the outdated boiler with a higher-capacity, natural-gas-fired watertube boiler. The new system must meet stringent performance and safety standards, ensuring reliable operation and compliance with all applicable codes and regulations. The scope of work encompasses the complete removal and disposal of the existing boiler, including disconnection and removal of associated steam, feedwater, and blowdown piping, safety valve vent, electrical connections, and a section of the existing stack. The contractor will supply, deliver, and install a new Cleaver Brooks M5‑700‑7500‑150St (or equivalent) boiler with a 7,500 MBTU input and 6,000 MBTU output capacity, featuring a 0.95" tube wall thickness and 100 psig operating pressure. **Key Requirements and Deliverables** Contractors are expected to: - Remove and dispose of the existing boiler and associated components. - Install the new watertube boiler, including all required piping, valves, gauges, regulators, safety devices, low-water cutoff, stack components, gas train modifications, feedwater connections, and electrical reconnections. - Integrate new steam spool pieces, a non-return valve, a 4" stop valve, and tie-in to the existing steam distribution system. - Install and test the HAWK actuator system, perform commissioning, boil-out procedures, operational testing, and verify all safety and control functions. - Complete all work without altering existing walls or doors, adhering to Federal, State, and local codes (IBC, IMC, NEC, NFPA, OSHA, ACA Standards, and BOP Technical Design Guidelines). - Provide comprehensive service manuals, troubleshooting guides, and operator training to institution staff upon project completion. **Contracting Entity and Location** The contracting entity is the Federal Bureau of Prisons, Field Acquisition Office (FAO), a federal office under the Department of Justice. The place of performance is FCI Marion in Marion, Illinois. The procurement is not set aside for any specific business category; all qualified entities may submit quotations. **Procurement Process and Special Considerations** This solicitation is distributed exclusively via the Contract Opportunity website (https://www.sam.gov), and all secure documents require active SAM vendor registration and a valid Marketing Partner Identification Number (MPIN) for access. Contractors must ensure their SAM registration includes the relevant NAICS code and accurate business size metrics. Payment will be processed via Electronic Funds Transfer (EFT) in accordance with FAR clause 52.232-33. A site visit is scheduled for June 17, 2026, at 9:30 am CDT, and attendance is encouraged to assess existing conditions. Vendors must submit NCIC background check forms for all attendees by June 10, 2026, at 9 am CDT to [email protected]. Questions regarding the solicitation must be submitted in writing to the Contracting Officer, Luke Bonner ([email protected]), by June 22, 2026, at 11 am CDT. Quotations are due by June 29, 2026, at 11:00 am CDT, and must include a specification sheet and all relevant submittal information. Faxed and hand-delivered quotes will not be accepted. **Contract Lifecycle and Constant Elements** Throughout the contract lifecycle, the requirement for strict adherence to codes and standards, comprehensive documentation, and operator training will remain constant. The performance period is set at 235 calendar days from the issuance of the notice to proceed, ensuring a defined timeline for project completion. **Summary for Contractors** This opportunity is well-suited for contractors with expertise in boiler replacement, steam system integration, and compliance with institutional and regulatory standards. The project demands a turnkey solution, from demolition to commissioning, with a strong emphasis on safety, code compliance, and operational reliability. Interested parties should review the specifications attachment for detailed requirements and ensure timely registration and document submission via SAM.gov. For further information and access to solicitation documents, contractors should visit the official notice at https://sam.gov/opp/f5bb452acb0c48189b9ab39676322fe5/view and direct any questions to the primary contact, Luke Bonner, at [email protected].
Documents8