Shenango River Lake Water Tank Rehabiliation

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

W072 ENDIST PITTSBURGH

Contract Value

Not provided

Codes & Classification
Solicitation Number

W911WN26BA014

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Classification Code

Y1QA

Additional Details
Set Aside

SBA

Place of Performance

-

SourceSAM
Documents3
The U.S. Army Corps of Engineers, Pittsburgh District, is soliciting bids for the comprehensive rehabilitation of the elevated water tank at Shenango River Lake, located in Mercer County, Pennsylvania. This project is a critical infrastructure initiative aimed at ensuring the continued safe and reliable operation of the water system that supports both flood mitigation and recreational activities in the area. The scope of work encompasses the removal and in-kind replacement of all interior pedestal and tank piping and valves, including risers, overflow, and drain lines, as well as associated heat tracing, insulation, supports, and appurtenances. Additionally, the contractor will be responsible for the removal and replacement of the interior 6-inch concrete slab and removable grating, with all necessary fill, steel reinforcement, expansion materials, and accommodations for penetrations through the slab. Key deliverables also include the removal and replacement of interior electrical panels—specifically the Lighting Panel, Safety Switch, Cathodic Protection Panel, and Pump Control Panel—with new panels required to functionally duplicate the existing systems. The project further calls for the removal and replacement of the interior lower access ladder, extending from ground level through the insulated ceiling to the first work platform, with an OSHA-approved ladder and safety climbing devices, including a flexible cable system and full body harness. All removed materials, including ferrous and other construction waste, must be disposed of at commercially permitted facilities licensed for waste or recyclable materials, in accordance with applicable regulations. The work will be conducted in close proximity to areas actively used for flood mitigation and recreation, and the existing facilities are staffed by government personnel around the clock. Coordination with the Contracting Officer and government staff is required to schedule the emptying of the tank during the fall 2026/winter 2027 or fall 2027/2028 off-seasons. The government will refill the tank by May 15, 2027, and May 15, 2028, to coincide with the start of the summer recreation seasons. All work must be substantially complete—meaning installation, testing, disinfecting, and government acceptance of all water-contact equipment and piping—by May 15, 2027, to ensure the timely reopening of the recreational area to the public. This procurement is designated as a 100% Small Business Set-Aside under NAICS Code 237110 (Water and Sewer Line and Related Structures Construction), with a small business size standard of $45,000,000.00. The opportunity is open to all responsible small business bidders, who are encouraged to submit their bids via the Procurement Integrated Enterprise Environment (PIEE) by the specified response date. Contractors should note that information regarding the U.S. Army Corps of Engineers’ process for equitable adjustments and change order definitization under construction contracts is available online, as referenced in the solicitation. The contracting entity for this project is W072 ENDIST PITTSBURGH, a federal office under the Department of Defense, Department of the Army. Primary and secondary points of contact for this solicitation are Mario Taormina ([email protected], 412-395-7256) and Connie L. Ferguson ([email protected], 412-395-7551), respectively. The solicitation and all related documents can be accessed via the official SAM.gov opportunity listing (SAM Opportunity ID: 2cbbf6c67364472db59eab454bf5f919). This project represents a significant opportunity for qualified small businesses specializing in water and sewer line construction and rehabilitation, with a focus on safety, regulatory compliance, and timely delivery to support critical public infrastructure and recreational access.