NRCS-WV Kanawha County EWP Streambank Stabilization Sharon Hollow and Ohley Hollow Road
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
FPAC BUS CNTR-ACQ DIV
Contract Value
Not provided
Codes & Classification
Solicitation Number
12FPC326B0010
NAICS
237990 - Other Heavy and Civil Engineering Construction
Classification Code
Y1QA
Additional Details
The United States Department of Agriculture (USDA), through its Farm Production and Conservation Business Center (FPAC BUS CNTR-ACQ DIV), has issued a combined synopsis/solicitation for streambank stabilization services under the Emergency Watershed Protection (EWP) program in Kanawha County, West Virginia. This procurement, identified by number 12FPC326B0010, seeks qualified contractors to perform critical streambank stabilization work at two sites: Sharon Hollow and Ohley Hollow Road.
The primary objective of this project is to mitigate erosion and sedimentation risks along designated streambanks, thereby protecting infrastructure, water quality, and public safety in the affected areas. The scope of work encompasses a comprehensive suite of heavy and civil engineering construction activities, classified under NAICS code 237990 (Other Heavy and Civil Engineering Construction) and Product Service Code Y1QA. The project is set aside for SBA-eligible contractors, ensuring opportunities for small businesses in the sector.
Key requirements and deliverables include:
- Clearing and grubbing of designated areas, involving the removal and proper disposal of trees, stumps, brush, and debris.
- Shaping of the stream channel to specified contours and grades.
- Implementation of erosion and sediment control measures to minimize environmental impacts during construction.
- Preparation of the site for revegetation, including furnishing and applying seed, mulch, fertilizer, lime, and other soil amendments, with special seed mixtures and soil preparation requirements for the Ohley site.
- Mobilization and demobilization of all necessary personnel, equipment, and materials.
- Establishment and maintenance of traffic control to ensure safe and convenient public access throughout the project duration.
- Management of surface and groundwater, including the construction and subsequent removal of temporary water containment and diversion facilities, as well as the operation of pumps and related equipment.
- Excavation and disposal of materials as required by project drawings and specifications.
- Construction of earth embankments, fills, and backfills in accordance with detailed plans.
Recent updates to the solicitation documents (as of 6/15/2026) include specific notes and requirements for the Ohley Hollow Road site:
- Acknowledgement of a potentially abandoned septic tank, which must be properly decommissioned if encountered during construction.
- Identification of a pet cemetery area to be strictly avoided.
- Requirement for a temporary fence to be constructed between the house corner and the existing road fence.
- Enhanced seeding specifications, including a unique seed mix and limitations on rock size in the seedbed.
- Additional procedures for site preparation, including loosening compacted areas and blending disturbed soils.
- Requirements for the removal of concrete from chain link posts if they are to be reused.
Contractors are advised to review all attachments and the full specifications document for comprehensive details on the scope and technical requirements. The place of performance is Kanawha County, West Virginia, and all work must comply with federal, state, and local regulations.
The contracting office for this opportunity is the FPAC Business Center Acquisition Division, a federal office under the Department of Agriculture. The primary point of contact for inquiries is Mark Domingo, who can be reached at [email protected].
Interested and qualified SBA contractors specializing in heavy and civil engineering construction are encouraged to review the full solicitation and associated documents, available via the official SAM.gov posting (Opportunity ID: 0ec4d4e34472444b8ecd52cecf88bcd6), and to submit their responses by the specified deadline.
This procurement represents a significant opportunity for contractors with experience in streambank stabilization, environmental controls, and site restoration to contribute to the resilience and safety of West Virginia’s watershed infrastructure.