Full Window Replacement, Building 674, U.S. Army Garrison Devens Reserve Forces Training Area (RFTA)
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
W6QK ACC-PICA
Contract Value
Not provided
Codes & Classification
Solicitation Number
W15QKN26RA056
NAICS
238350 - Finish Carpentry Contractors
Classification Code
Z2AZ
Additional Details
The Department of the Army, under the auspices of the U.S. Army Garrison Devens Reserve Forces Training Area (RFTA), has issued a combined synopsis/solicitation for a full window replacement project at Building 674, located at 30 Quebec Street, Devens, Massachusetts. This procurement, identified by W15QKN26RA056, is a single, firm-fixed-price (FFP) construction contract and is fully set aside for small business concerns in accordance with FAR 19.502-2. The solicitation is managed by the Army Contracting Command (ACC-PICA), with primary contacts Nelia Shyshak ([email protected]) and Edward Sherwood ([email protected]).
**Purpose and Scope**
The primary objective of this project is the comprehensive replacement of all windows in Building 674. The contractor will be responsible for the removal and disposal of existing windows, followed by the supply and installation of approximately 282 new vinyl, single-hung, dual-pane, low-E insulated windows with a dark bronze finish. Each window must feature a 3-1/4-inch depth and 7/8-inch insulated glass filled with Argon gas. The scope includes all necessary ancillary work such as flashing, sealants, shims, trim, and insect screens to ensure a weather-tight installation. The contractor must provide all labor, supervision, materials, equipment, tools, and transportation required to complete the project.
**Key Requirements and Deliverables**
- **Demolition and Preparation:** Complete removal of all existing windows in strict accordance with SOW Section 02 41 00, with daily removal of debris from government property.
- **Window Installation:** Installation of specified replacement windows, ensuring compliance with technical specifications and performance requirements.
- **Ancillary Work:** Installation of all associated components to ensure weather-tight joints and operable insect screens.
- **Environmental Controls:** Adherence to Section 01 57 20 (Environmental Protection), including hazardous waste minimization, proper disposal, and immediate reporting of spills/releases to the Devens DPW Environmental Specialist.
- **Clarification of Scope:** The requirement is strictly limited to Building 674; any references to other buildings in the attachments are null and void.
- **Site Visit:** Offerors are strongly encouraged to attend a site visit for dimensional verification. Two site visits are scheduled: June 22, 2026, and June 23, 2026, from 10:00 AM to 11:00 AM. Attendees must submit a Request for Fort Devens Access Control Visitors Pass (Attachment 0004) at least 48 hours prior to the visit to Zygmunt Osiecki ([email protected], 978-615-6104) and Paul A. Lavoie ([email protected], 520-717-2442).
**Contracting and Evaluation Details**
- **Classification Codes:** PSC Z2AZ (Maintenance, Repair, or Alteration of Other Residential Buildings); NAICS 238350 (Finish Carpentry Contractors), with a small business size standard of $19.5 million.
- **Contract Type:** Firm-fixed-price construction contract.
- **Set-Aside:** 100% for small business concerns.
- **Period of Performance:** 365 calendar days from receipt of the written Notice to Proceed.
- **Source Selection:** Lowest Price, Technically Acceptable (LPTA) process per FAR 52.212-2.
- **Bonds:** Bid Bond (20% of bid price or $3 million, whichever is less), Performance Bond (SF 25), and Payment Bond (SF 25A) equal to 100% of contract price, due within 10 days of award.
- **Liquidated Damages:** $275 per calendar day for delays.
- **Wage Determination:** Davis-Bacon Act Wage Determination MA20260001 (Middlesex County, MA), updated May 18, 2026.
**Proposal Submission Instructions**
Proposals must be submitted electronically to the designated contract specialist and contracting officer by the deadline. Submissions should include:
- **Volume I – Technical Proposal (15-page limit, searchable PDF):**
- Detailed technical narrative outlining the approach to window removal, environmental controls, surface patching, and installation.
- Identification of subcontractors, percentage of work, and compliance with FAR 52.219-14 (Limitations on Subcontracting).
- **Volume II – Price Proposal (no page limit):**
- Signed and completed SF 1442.
- Contractor Cost Breakdown Form (Attachment 0003), detailing labor, equipment, materials, overhead/G&A, and profit rates.
- FFP CLIN 0001 (Full Window Replacement) and FFP CLIN 0002 (Bond reimbursement).
- Bid Bond documentation.
**Milestones and Deadlines**
- **Site Visits:** June 22 and June 23, 2026, 10:00 AM – 11:00 AM.
- **Questions Deadline:** June 24, 2026, 4:00 PM.
- **Proposal Submission Deadline:** July 1, 2026, 12:00 PM (Noon).
**Constant Elements Throughout Contract Lifecycle**
The contract will remain a firm-fixed-price agreement, governed by the Davis-Bacon wage determination, and will require strict adherence to environmental protection standards and site-specific access protocols. The scope is limited to Building 674, and all work must comply with the technical specifications and performance requirements outlined in the solicitation and attachments.
**Contact and Additional Information**
For further details, contractors may refer to the official notice on SAM.gov (https://sam.gov/opp/f4749cf128234450a918eb86da707aa0/view) and direct inquiries to Nelia Shyshak or Edward Sherwood. The contracting entity is W6QK ACC-PICA, a federal office under the Department of Defense, Department of the Army.
This opportunity is well-suited for small businesses specializing in finish carpentry and window installation, with the capacity to manage environmental controls and comply with federal construction standards. Interested contractors should review all solicitation documents and attachments, attend a site visit, and ensure timely submission of a comprehensive proposal.
Documents8