McNary Downstream Miter Gate Replacement

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

US ARMY ENGINEER DISTRICT WALLA WAL

Contract Value

Not provided

Codes & Classification
Solicitation Number

W912EF26RSS26

NAICS

-

Classification Code

-

Additional Details
Set Aside

None

Place of Performance

Oregon, UNITED STATES

SourceSAM
Documents2
The US Army Corps of Engineers, Walla Walla District, is conducting a sources sought inquiry for the McNary Downstream Miter Gate Replacement project, located in Oregon. This initiative is part of the Corps’ ongoing efforts to maintain and upgrade critical navigation infrastructure along the Columbia River. The project’s primary objective is the replacement of the existing two-leaf arch rib miter gate, including associated mechanical equipment and embedded pintle ball and sill beam components. Each gate leaf is substantial, weighing approximately 425 tons (850,000 pounds) and measuring 53.5 feet in width by 106 feet in height. The anticipated contract will be a firm-fixed-price construction agreement, with an estimated magnitude ranging from $25,000,000 to $100,000,000. Contractors will be required to provide 100% performance and payment bonds. The procurement is classified under NAICS code 237990 (Other Heavy Civil Engineering and Construction), with a small business size standard of $45.0 million. This sources sought notice is strictly for market research and planning purposes; it is not a solicitation and does not obligate the government to award a contract or reimburse respondents for any costs incurred. The Corps seeks to identify businesses with the technical expertise, capacity, and interest to undertake this complex project. Respondents are expected to provide information demonstrating relevant experience, qualifications, and certifications, as well as details regarding business size status, bonding capacity, and intent to submit a proposal when the formal solicitation is released. Key technical requirements include: - Fabrication and shop coating of each gate leaf using ASTM A709 Grade 50 steel, adhering to AWS D1.5 Bridge Welding Code with Fracture Critical Members (FCM). - Fabrication shops must hold AISC certifications: Certified Bridge Fabricator – Intermediate (IBR) with Fracture Control Endorsement (FCE), Certified Bridge Fabricator – Advanced (ABR) with FCE, or Certified Hydraulic Fabricator – Advanced (HYDA). - Coating must comply with USACE System 5-E-Z Impacted Immersion Vinyl standards, with painter certification required (SSPC QP 1 or AISC Complex Coating Endorsement). - Each gate leaf must be delivered to the site in one piece by barge. The tentative project schedule includes contract award in April 2028, completion of fabrication by December 2029 (20 months from notice to proceed), and a 16-week site work window during the 2030 Extended Columbia River Navigation Outage (January to April 2030). The site installation phase will involve removal and barge loading of old gate leafs, demolition and replacement of embedded components, installation of new machinery, and precise alignment and sealing of the new gate leafs. The Corps is specifically seeking feedback on the feasibility of the proposed fabrication timeline, barge delivery logistics, crane requirements for gate removal and installation, and the ability to complete site installation within the designated outage window. Respondents should address these points in their submission, along with project references, business status, and other requested information. The contracting entity is the US Army Engineer District Walla Walla, a federal office under the Department of Defense, Department of the Army. The primary point of contact for this notice is Preston Jones, Contract Specialist, who can be reached at [email protected] or 509-527-7206. Interested parties must submit their responses by 3:00 PM on May 29, 2026. Further details and updates, including attachments, are available via the SAM.gov opportunity page: https://sam.gov/opp/f60805ec66de4fc6bc30ac066fef9f94/view. Contractors considering this opportunity should carefully review the technical requirements, schedule constraints, and certification standards to determine alignment with their capabilities and resources. The scope and complexity of the work, combined with the stringent fabrication and installation timeline, make this project suitable for firms with proven experience in heavy civil engineering, large-scale steel fabrication, and specialized coatings for immersed structures.