USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
SOUTHWEST REGIONAL MAINT CENTER
Contract Value
Not provided
Codes & Classification
Solicitation Number
N5523626R0009
NAICS
333618 - Other Engine Equipment Manufacturing
Classification Code
2815
Additional Details
The Department of the Navy, through the Southwest Regional Maintenance Center, has issued a sole source procurement notice for the USS BOXER (LHD-4) concerning the replacement of ALCO Model 251C Long Lead Time Material (LLTM). This procurement activity is intended to secure critical engine equipment components necessary for the ongoing maintenance and operational readiness of the USS BOXER, a key asset within the Navy’s fleet.
The scope of this procurement is specifically focused on the acquisition of replacement parts for the ALCO Model 251C engine, as detailed in the Product Description (Attachment J-1). The procurement is classified under NAICS code 333618, “Other Engine Equipment Manufacturing,” and product service code 2815, indicating its relevance to specialized engine equipment. The intended outcome is to ensure the timely and reliable supply of these long lead time materials, which are essential for sustaining the vessel’s propulsion and auxiliary systems.
This solicitation, identified by procurement number N5523626R0009, is being conducted as a combined synopsis/solicitation for commercial products in accordance with FAR Part 12. Notably, the procurement is a sole source action, with Fairbanks Morse Defense designated as the exclusive provider. The Government has determined that only Fairbanks Morse possesses the requisite capability and proprietary access to supply the specified parts, and as such, no competitive proposals are being solicited. The notice explicitly states that this is not a request for competitive proposals, and any decision to compete the contract will be at the sole discretion of the Government.
Key requirements include adherence to the updated product description provided in Attachment J-1, which outlines the specific parts and materials to be supplied. The procurement incorporates standard FAR and DFAR provisions and clauses, accessible via https://acquisition.gov, ensuring compliance with federal acquisition regulations.
The contracting entity is the Southwest Regional Maintenance Center, a federal office within the Department of Defense, specifically under the Department of the Navy. Primary and secondary points of contact for this opportunity are Mira Maje Brown ([email protected], 619-708-0826) and Kristin Liljestrom ([email protected], 619-952-8463), respectively. The notice remains active as of April 11, 2026, and further details, including the full solicitation and synopsis, can be accessed via the SAM.gov opportunity link: https://sam.gov/opp/e28e42098d3b432287458e7ac3b57102/view.
Contractors considering this opportunity should note the sole source nature of the procurement, the specific engine equipment requirements, and the critical role these materials play in supporting Navy operations. The elements outlined in this notice, including the contracting entity, scope, and requirements, are expected to remain constant throughout the contract lifecycle.