USACE SPK DBB Construction - Natomas NPP Renovations - Sacramento, CA

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

W075 ENDIST SACRAMENTO

Contract Value

Not provided

Codes & Classification
Solicitation Number

W9123826X1BN4

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Classification Code

Z2NE

Additional Details
Set Aside

None

Place of Performance

Sacramento, California, UNITED STATES

SourceSAM
Documents1
The U.S. Army Corps of Engineers (USACE), Sacramento District (SPK), has issued a Sources Sought Notice to conduct market research for a forthcoming construction project titled "Natomas Named Pumping Plants (NPP) Renovations" in Sacramento, California. This notice is intended solely for information gathering and does not constitute a solicitation for bids or proposals; no contract will be awarded as a result of this announcement. The primary objective is to identify qualified and interested businesses, including those in the small business community—such as Small Businesses, 8(a) Program Participants, HUBZone, Service-Disabled Veteran-Owned Small Businesses (SDVOSB), and Women-Owned Small Businesses (WOSB)—capable of executing the described scope of work. **Project Purpose and Scope** The anticipated project involves the renovation of three irrigation pumping stations—Elkhorn, Riverside, and Pritchard Pumping Plants—located along the Sacramento River north of Interstate 5 in the Natomas region. These facilities are critical for conveying water from the Sacramento River into the Natomas Mutual Water Company’s irrigation systems. The primary construction activity at each site will be the removal of existing discharge pipes that currently penetrate the levee and the installation of new discharge piping routed over the levee. This modification is intended to enhance the integrity and functionality of the levee system while maintaining reliable water delivery to the irrigation canals. **Key Requirements and Deliverables** For each pumping plant, the anticipated work includes: - Levee excavation and removal of existing piping and appurtenances - Backfilling and compaction of the levee embankment - Installation of new discharge piping traversing over the levee - Site-specific tasks such as: - At Elkhorn: Building up the area, partial removal and replacement of Garden Highway pavement, installation of a vacuum system and conduit, and replacement of fiber optic line conduit - At Riverside: Modification of the existing maintenance ramp, partial pavement replacement, installation of a vacuum system and conduit, and installation of underground conduit - At Pritchard: Installation of a vacuum system and conduit, and replacement of fiber optic line conduit All construction activities must comply with the USACE Safety and Health Requirements Manual (EM 385-1-1) and all applicable federal, state, and local regulations. The contractor must demonstrate the capability to sequence work effectively and perform levee improvement projects. Additionally, the project requires Level 1 Self Certification under the Cybersecurity Maturity Model Certification (CMMC) framework. **Project Timeline and Magnitude** The estimated construction magnitude is between $10,000,000 and $15,000,000. The anticipated duration for completion is 780 calendar days from the Notice to Proceed, with construction expected to occur sequentially—one plant per construction season—over approximately three years. The government encourages respondents to provide feedback on the proposed timeline, particularly regarding equipment lead times or other scheduling considerations. **Contracting and Procurement Details** - **Contracting Entity:** U.S. Army Corps of Engineers, Sacramento District (W075 ENDIST SACRAMENTO) - **Location:** Sacramento, California - **NAICS Code:** 237110 (Water and Sewer Line and Related Structures Construction) - **Product Service Code (PSC):** Z2NE (Repair or Alteration of Water Supply Facilities) - **Anticipated Contract Type:** Firm-Fixed Price - **Anticipated Acquisition Method:** FAR Part 14, Sealed Bidding - **Estimated Solicitation Release:** July 2026 **Special Considerations** Environmental and cultural resource concerns are present, including the potential impact on Giant Garter Snake (GGS) habitat and other cultural considerations. Contractors should be prepared to address these challenges as part of their project approach. **Participation and Submission Instructions** This notice is open to all interested parties, including those seeking subcontracting opportunities. Respondents are encouraged to identify their interest in specific features of work and their small business socio-economic status. All responses must be submitted via the official online Market Survey Form by 8:00 AM Pacific Time on May 19, 2026. Submissions by email or other means will not be accepted. **Contact Information** - **Primary Contact:** Constantinos Laliotitis - **Email:** [email protected] - **Phone:** 916-557-7621 **Additional Information** This Sources Sought Notice is for market research purposes only. Participation is voluntary and does not affect eligibility for future solicitations. The acquisition strategy, including any set-aside determinations, will be finalized based on the responses received and further market research. Interested firms should monitor the System for Award Management (SAM) for updates and the eventual solicitation. For more details and to access the official notice, visit: [SAM.gov Opportunity](https://sam.gov/opp/45ef38c54a3347bba9045b1ddc750481/view). This opportunity is well-suited for contractors with experience in water infrastructure, levee improvements, and complex site logistics, particularly those with a strong safety record and familiarity with federal construction standards.