Application to Test in the NRIC DOME Facility
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
BATTELLE ENERGY ALLIANCE–DOE CNTR
Contract Value
Not provided
Codes & Classification
Solicitation Number
INL-NRICRFA02
NAICS
221113 - Nuclear Electric Power Generation
Classification Code
4470
Additional Details
Documents3
Battelle Energy Alliance, LLC (BEA), serving as the Management and Operating Contractor for the U.S. Department of Energy’s Idaho National Laboratory (INL), has issued a Special Notice inviting industry applicants to participate in advanced reactor experiments at the National Reactor Innovation Center’s (NRIC) Demonstration of Microreactor Experiments (DOME) facility. The DOME test bed, located at INL’s Material and Fuels Complex in Idaho Falls, Idaho, is designed to accelerate the development and commercialization of advanced nuclear reactor technologies by providing a unique, federally supported environment for testing fueled reactor concepts. The application deadline for this opportunity has been extended to July 17, 2026, with updated Request for Application (RFA) wording as of July 6, 2026.
The primary objective of this procurement activity is to facilitate industry-led, self-funded testing of advanced reactor designs in the DOME facility, beginning in July 2027. By offering access to a nuclear reactor test bed, BEA and NRIC aim to unlock private capital, expedite commercial licensing, and support the safe, reliable, and affordable demonstration of first-of-a-kind nuclear technologies. This initiative is rooted in the mandate of NRIC, established under Section 958 of the Nuclear Energy Innovation Capabilities Act (NEICA) of 2017, to enable private sector-funded reactor concept testing and demonstration.
Applicants must propose advanced nuclear reactor experiments that meet stringent thresholds for maturity and readiness. Key requirements include:
- A sufficiently mature reactor design capable of supporting imminent safety basis documentation and a final documented safety analysis for operations.
- Established nuclear material plans, including lifecycle pathways for all materials used or generated, with qualified fuel forms and a defined fuel fabrication plan.
- Adequate financial resources and a mature supply chain to support all phases of the project, from design through decommissioning.
- Execution readiness, including procurement and manufacturing capabilities, qualified staffing, and project management infrastructure.
- A developed commercialization plan outlining next steps, long-term licensing, and future demonstration locations.
Applications must address nine core categories: technology maturity, nuclear material feedstock/fuel, test objectives, project schedule, DOME integration, DOE authorization plan, funding, experience and capabilities, and commercialization/regulatory strategy. Each application must include a Master Document and Deliverable List (MDDL) and a detailed project schedule as attachments. The application process and evaluation criteria are detailed in INL guide GDE-55115 DOME Scheduling Application, which is provided as an attachment. Applicants are responsible for all costs associated with application development.
Eligibility is limited to applicants who demonstrate significant progress through conceptual design and DOE engagement on nuclear safety agreements. U.S.-owned companies or those passing a DOE-P 485.1A review are eligible, as are companies incorporated in the U.S. with parent entities that provide reciprocal opportunities and intellectual property protections for U.S. firms.
The selection process involves evaluation by NRIC and DOE, with scheduling recommendations made to DOE based on the optimization of DOME facility use. There is no guarantee of selection or specific testing timelines; results are anticipated within four to six months of application receipt. Only applicants proposing fueled reactor experiments compatible with DOME’s specifications and submitting a completed scheduling application will be considered.
Interested parties must submit contact information (company name, contact name, telephone, and email) via email to AnnMarie Marshall ([email protected]) or Sam Reiss ([email protected]) by 5:00 p.m. MDT on June 19, 2026. Upon receipt, applicants will be provided with further instructions and a secure submission link. Final applications are due by 5:00 p.m. MDT on July 17, 2026, and must not exceed fifty pages in PDF format, excluding the MDDL and schedule attachments. Applications should clearly address all evaluation criteria and include supporting assumptions and bases.
Applicants are advised to mark any proprietary or business-sensitive information in their submissions. Technical questions must be submitted in writing at least two weeks prior to the closing date; responses will be shared with all applicants.
The procurement is classified under NAICS Code 221113 (Nuclear Electric Power Generation) and Product Service Code 4470. The place of performance is Idaho Falls, Idaho. The contracting entity is Battelle Energy Alliance–DOE Contractor, operating under the Department of Energy. For further information, applicants may refer to the official notice on SAM.gov (Opportunity ID: eb07112252ed4524bbb33e6b6e10fe4c).
This opportunity represents a significant pathway for industry stakeholders to advance nuclear reactor technologies through federally supported testing, with a focus on commercialization, safety, and regulatory readiness. Contractors with mature reactor designs, robust project management capabilities, and a clear commercialization strategy are encouraged to evaluate their alignment with the requirements and objectives outlined in this notice.