SOURCES SOUGHT for PLA - Flood Risk Management Project for Milton, WV
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
W072 ENDIST HUNTINGTON
Contract Value
Not provided
Codes & Classification
Solicitation Number
W91237-26-X-1BLY
NAICS
237990 - Other Heavy and Civil Engineering Construction
Classification Code
Y1PZ
Additional Details
The U.S. Army Corps of Engineers, Huntington District, has issued a Sources Sought notice for the Lower Mud River Flood Damage Reduction Project in Milton, West Virginia. This market research initiative seeks industry input regarding the potential use of Project Labor Agreements (PLAs) for a major flood risk management construction project, with an estimated value exceeding $35 million. The notice is not a solicitation and does not commit the government to a specific acquisition strategy; rather, it aims to gather information to inform future procurement decisions.
Purpose and Scope:
The primary objective of the Milton, WV Flood Risk Management Project is to mitigate flood risks for the City of Milton, an area historically prone to significant flooding events since the early 1900s. The project is designed to protect over 600 structures—including residences, businesses, public facilities, personal property, and critical infrastructure—by implementing comprehensive flood control measures. The scope encompasses the construction of a levee, river channel modifications, installation of water management systems, utility relocations, and environmental mitigation efforts.
Key Requirements and Deliverables:
Contractors will be expected to deliver a range of heavy civil engineering works, including:
- Construction of approximately 6,800 linear feet of earthen levee, featuring a full-depth soil bentonite seepage barrier (variable depth to bedrock: 20’–40’) and a managed overtopping section.
- Installation of about 1,500 linear feet of concrete floodwall, reinforced with full-depth sheetpile (except for two sections with toe drains), and a stop log closure structure at Bill Blenko Drive.
- Development of two pump stations with capacities of 87,000 GPM (Johns Branch) and 19,000 GPM (Newmans Branch), each equipped with gravity culverts, gatewells, and discharge lines over the levee, as well as five gravity outfalls and associated ponding areas.
- Relocation and modification of the Mud River, shortening a 1,200-foot segment to a new 800-foot channel, including channel geometry benching.
- Relocation of the city’s raw water intake and a low-flow weir, along with other utility relocations.
- Implementation of environmental mitigation measures to offset impacts to vegetation, wetlands, and aquatic resources, and installation of stone slope protection.
The project is engineered for a 4% annual chance of exceedance (250-year return frequency), requiring expertise in large-scale earthmoving, geotechnical engineering, structural concrete, mechanical/electrical/plumbing trades, river engineering, utility coordination, and environmental compliance.
PLA Considerations:
The Corps is specifically seeking industry feedback on the use of PLAs for this project. Respondents are asked to address their willingness to enter into a PLA, prior experience with PLAs, potential impacts on cost, schedule, and risk, as well as local labor market conditions and union availability. The notice includes a detailed list of questions to guide responses, focusing on the practical implications of PLA requirements and their effect on project execution and federal procurement efficiency.
Contracting Entity and Classification:
The procurement is managed by W072 ENDIST HUNTINGTON, a federal office under the Department of Defense, Department of the Army. The project falls under NAICS Code 237990 (Other Heavy and Civil Engineering Construction) and Product Service Code Y1PZ. The place of performance is Milton, West Virginia, USA.
Procurement Type and Special Considerations:
This is a Sources Sought notice for market research; no set-aside requirements or solicitation details are provided at this stage. Contractors should note that the government is evaluating the feasibility and advisability of requiring a PLA, which may influence future solicitation terms.
Contact Information:
Interested parties are encouraged to submit responses by 3:00 PM on May 7, 2026. Responses should be directed to:
- Ms. Kristen Smith, Contract Specialist ([email protected], 304-399-5337)
- Ms. Patrina Singleton, Contracting Officer ([email protected], 304-399-6936)
Additional Information:
The notice is active and available for review on SAM.gov (Opportunity ID: 4bffd30b63294b52980c0529c2ce1037). No attachments or additional documents are currently provided.
Summary for Contractors:
This opportunity represents a significant, complex flood risk management project requiring multidisciplinary expertise in heavy civil construction, environmental mitigation, and water management systems. Contractors with relevant experience and capacity are encouraged to review the PLA inquiry and provide detailed feedback, which will help shape the government’s acquisition strategy. The elements described—including scope, technical requirements, and PLA considerations—are expected to remain central throughout the contract lifecycle.