FCI Marion - Replace Summer Boiler #2

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

FAO

Contract Value

Not provided

Codes & Classification
Solicitation Number

15BBNF26Q00000051

NAICS

238220 - Plumbing, Heating, and Air-Conditioning Contractors

Classification Code

Z2FF

Additional Details
Set Aside

SBA

Place of Performance

Marion, Illinois, UNITED STATES

SourceSAM
The Federal Bureau of Prisons (BOP), through its Field Acquisition Office (FAO), has issued a combined synopsis/solicitation (Procurement Identifier: 15BBNF26Q00000051) for the replacement of Summer Boiler #2 at the Federal Correctional Institution (FCI) in Marion, Illinois. This procurement seeks a qualified contractor to provide all necessary equipment, labor, materials, and incidentals required to remove the existing 4,800 MBTU summer boiler and install a new 7,500 MBTU watertube boiler system, in strict accordance with project specifications and all applicable codes. **Purpose and Scope:** The primary objective of this project is to upgrade the facility’s boiler infrastructure by replacing the current summer boiler with a higher-capacity, modern watertube boiler. The intended outcome is to ensure reliable, efficient, and code-compliant steam generation for the institution, thereby supporting its operational needs and safety requirements. **Key Requirements and Deliverables:** The contractor will be responsible for the complete removal and disposal of the existing boiler, including the disconnection and removal of all associated steam piping, feedwater piping, blowdown piping, safety valve vent, electrical connections, and a section of the existing stack. The new installation must feature a Cleaver Brooks M5‑700‑7500‑150St (or equivalent) natural-gas-fired watertube boiler with a 7,500 MBTU input and 6,000 MBTU output capacity, 0.95" tube wall thickness, and 100 psig operating pressure. The scope of work includes: - Supplying, delivering, and installing the new boiler and all required components (piping, valves, gauges, regulators, safety devices, low-water cutoff, stack components, gas train modifications, feedwater connections, and electrical reconnections). - Installing new steam spool pieces, a non-return valve, a 4" stop valve, and tying into the existing steam distribution system. - Installation and testing of the HAWK actuator system, commissioning, boil-out procedures, operational testing, and verification of all safety and control functions. - Ensuring all work is performed without altering existing walls or doors and in compliance with all Federal, State, and local codes (including IBC, IMC, NEC, NFPA, OSHA, ACA Standards, and BOP Technical Design Guidelines). - Providing all service manuals, troubleshooting manuals, and operator training to institution staff upon project completion. **Contracting Entity and Location:** - Contracting Entity: Federal Bureau of Prisons, Field Acquisition Office (FAO) - Department: U.S. Department of Justice - Place of Performance: FCI Marion, Marion, Illinois, USA **Classification and Codes:** - NAICS Code: 238220 (Plumbing, Heating, and Air-Conditioning Contractors), with a small business size standard of $19 million. - Product Service Code: Z2FF (Repair or Alteration of Heating, Ventilation, Air Conditioning, and Refrigeration - Facilities). **Procurement Type and Set-Aside:** This solicitation is issued as a combined synopsis/solicitation in accordance with FAR Part 12 (Commercial Products and Services) and FAR Part 36 (Construction and Architect-Engineering Contracts). It is a 100 percent small business set-aside, meaning only small businesses registered under the applicable NAICS code in SAM.gov are eligible to participate. The procurement will result in a single award to the responsible offeror whose quotation meets all requirements. **Special Considerations and Compliance:** - The period of performance has been extended from 60 to 235 calendar days from the notice to proceed. - The solicitation incorporates several key FAR clauses, including those addressing DEI discrimination (FAR 52.222-90), tailored terms and conditions (FAR 52.212-4), inspection/acceptance (FAR Dev 52.246-12), changes (FAR Dev 52.243-5), and progress payment provisions. - All work must comply with relevant codes and standards, and the contractor must provide comprehensive documentation and training upon completion. - Offerors must submit a specification sheet and all relevant submittal information with their quotation. - Payment will be processed via Electronic Funds Transfer (EFT) in accordance with FAR 52.232-33. **Submission and Access Requirements:** - The solicitation and all related documents are available exclusively through the SAM.gov Contract Opportunities portal. Access to secure/locked documents requires active SAM registration and a valid MPIN. - Only vendors with the appropriate NAICS code listed in their SAM.gov profile will be granted access to solicitation documents. - All questions must be submitted in writing to the Contracting Officer, Luke Bonner ([email protected]). - Faxed and hand-delivered quotes will not be accepted. **Key Dates:** - Solicitation Post Date (estimated): April 13, 2026 - NCIC Forms Due: April 20, 2026, by 9:00 am CDT (for site visit clearance; email to [email protected]) - Site Visit: April 22, 2026, at 9:00 am CDT (attendance encouraged; prior approval required) - Questions Due: April 24, 2026, by 11:00 am CDT - Quotation Deadline: May 8, 2026, at 12:00 pm CDT **Contact Information:** - Primary Contact: Luke Bonner, Contracting Officer - Email: [email protected] **Additional Information:** - Contractors must be registered in SAM.gov as a small business under NAICS 238220 to be eligible for award. - The solicitation, amendments, and all future updates will be posted solely on SAM.gov. Interested parties are responsible for monitoring the site for the latest information. - For technical issues accessing documents, contact the Federal Service Desk at 866-606-8220. This opportunity is well-suited for small business contractors with expertise in large-scale boiler replacement, mechanical systems installation, and compliance with institutional and correctional facility standards. The project’s comprehensive scope, strict adherence to codes, and requirement for detailed documentation and training underscore the need for experienced, detail-oriented firms capable of delivering turnkey solutions in secure environments.
Documents7