CARTRIDGE,CHECK VAL

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

NAVSUP WEAPON SYSTEMS SUPPORT MECH

Contract Value

Not provided

Codes & Classification
Solicitation Number

N0010426QFD19

NAICS

332919 - Other Metal Valve and Pipe Fitting Manufacturing

Classification Code

4820

Additional Details
Set Aside

None

Place of Performance

-

SourceSAM
Documents2
The Department of the Navy, through the Naval Supply Systems Command (NAVSUP) Weapon Systems Support office in Mechanicsburg, PA, has issued a solicitation (Procurement Identifier: N0010426QFD19) for the manufacture and delivery of a Cartridge, Check Valve assembly. This procurement is classified under NAICS code 332919 (Other Metal Valve and Pipe Fitting Manufacturing) and Product Service Code 4820, reflecting its focus on specialized shipboard valve components. The opportunity is a total small business set-aside, inviting qualified small business manufacturers with relevant experience in high-assurance, critical shipboard systems. **Purpose and Scope** The Cartridge, Check Valve assembly is a critical component intended for use in vital shipboard systems. The solicitation underscores the essential nature of this material, designating it as SPECIAL EMPHASIS (Level I, Scope of Certification, or Quality Assured) due to the severe consequences of failure—including potential personnel injury, loss of life, or catastrophic ship system failure. As such, the procurement invokes stringent quality assurance, traceability, and certification requirements to ensure the highest standards of safety and reliability. **Key Requirements and Deliverables** Contractors are required to deliver a complete cartridge assembly for a 2-inch vent check valve, manufactured in accordance with NAVSEA drawing 845-6903452, item 35, and as further specified or modified in the solicitation. The assembly and its constituent parts must meet detailed material and process specifications, including: - **Material Certification:** Quantitative chemical and mechanical analysis is required for key parts (e.g., Guide and Poppet), with materials conforming to ASTM-B574 (UNS N10276) and MIL-DTL-24252 (composition 1, condition CA-7), respectively. - **Testing and Inspection:** Certifications are required for non-destructive tests (NDT) on welds, cartridge assembly tests, and ultrasonic inspection of the poppet. All testing must comply with referenced military and industry standards (e.g., MIL-STD-2132, MIL-DTL-24252). - **Pressure and Thread Requirements:** Pressure tolerances and test durations are strictly defined, and all internal threads must be cut (not cold-formed) and inspected per FED-STD-H28 or ASME B1 series. - **Welding and Brazing:** All welding and brazing must follow NAVSEA and military standards, with procedures and personnel qualifications submitted for approval prior to work. Repair welding on MIL-DTL-24252 material is prohibited. - **Traceability and Certification:** Full traceability from raw material to finished product is mandatory, with permanent marking and comprehensive certification data required for each item. Certificates of Compliance must be submitted, demonstrating conformance to all specifications and listing all tests performed. - **Quality System:** Contractors must maintain a quality system compliant with ISO 9001 (or MIL-I-45208 as an alternate), with calibration systems per ISO 10012, ANSI-Z540.3, and ISO 17025. The system and all products are subject to government evaluation and source inspection. - **Packaging:** Preservation, packaging, and marking must comply with MIL-STD-2073 and contract-specific instructions. **Contract Administration and Submission Requirements** - **Data and Documentation:** Certification data must be submitted to Portsmouth Naval Shipyard (DODAAC N50286) for review and acceptance prior to each shipment, using the Wide Area Work Flow (WAWF) system. No material may be shipped before formal acceptance. - **Delivery Schedule:** Certification Data CDRLs are due at least 20 days prior to scheduled delivery. The shipyard will review and accept/reject within 30 working days of receipt. Final material delivery is required within 250 days of contract award. - **Configuration Control:** Contractors must maintain baseline configuration and submit Engineering Change Proposals (ECPs) for any modifications affecting form, fit, function, or interface. - **Subcontractor Oversight:** Prime contractors are responsible for ensuring all sub-tier suppliers meet the same quality and traceability requirements, with periodic audits and flow-down of all applicable contract clauses. **Special Considerations** - **National Defense Priority:** This is a DX-rated order under the Defense Priorities and Allocations System (DPAS), indicating its criticality for national defense. - **Emergency Acquisition Flexibilities:** The procurement is issued under Emergency Acquisition Flexibilities (EAF), which may affect certain administrative procedures. - **Security and Export Controls:** Access to drawings and technical data may require additional authorization and compliance with distribution statements and export control regulations. - **Mercury-Free Requirement:** No mercury or mercury-containing compounds may be used or come into contact with the supplied hardware. **Contracting Entity and Contact Information** - **Contracting Office:** NAVSUP Weapon Systems Support (WSS) Mechanicsburg, PA - **Primary Contact:** Ashton K. Perry, Telephone: 717-605-7574, Email: [email protected] - **Submission Portal:** https://sam.gov/opp/ff288c1ac6004721a152287f89d6b717/view **Summary for Contractors** This solicitation represents a highly specialized opportunity for small business manufacturers with expertise in precision metal valve and pipe fitting production, particularly for critical naval applications. The contract demands rigorous adherence to technical, quality, and traceability standards, with extensive documentation and government oversight throughout the contract lifecycle. Contractors must be prepared to implement robust quality systems, manage complex certification and inspection processes, and coordinate closely with both government and sub-tier suppliers to ensure full compliance. The work supports national defense priorities and is subject to expedited acquisition procedures. Interested parties should carefully review all referenced specifications, drawings, and contract clauses, and ensure their capabilities align with the stringent requirements before responding. All inquiries and requests for access to controlled documents should be directed to the primary contact listed above.