Village Power Communication Line Re-Routing

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

FA5682 31 CONS DA LGC

Contract Value

Not provided

Codes & Classification
Solicitation Number

FA568226QA003

NAICS

-

Classification Code

-

Additional Details
Set Aside

None

Place of Performance

Campia Turzii, Cluj, ROMANIA

SourceSAM
Documents2
The Department of the Air Force, through the 31st Contracting Squadron (FA5682 31 CONS DA LGC), has issued a Sources Sought notice for the "Village Power Communication Line Re-Routing" project, located in Campia Turzii, Cluj, Romania. This procurement seeks to identify qualified contractors capable of executing a comprehensive underground conduit installation to enhance the reliability, safety, and maintainability of the Village’s power and communication infrastructure. **Purpose and Scope** The primary objective of this project is to relocate the existing above-ground power and communication lines—currently routed on a concrete pad with exposed cable trays—into a robust underground conduit system. This transition is intended to mitigate risks associated with weather exposure, physical damage, and operational disruptions, while also facilitating future network expansion. The scope of work encompasses the full lifecycle of underground conduit installation, including trench excavation, conduit placement, backfilling, surface restoration, and all associated site protection and documentation. The contractor will be responsible for providing all labor, materials, equipment, and supervision necessary to complete the project in accordance with international (IEC 60364-5-52), national (Romanian underground cable installation standards), and U.S. (NEC, IEEE) codes and standards. **Key Requirements and Deliverables** - **Trench Excavation:** Excavate a 14-meter trench with a finished depth of 80–90 cm (with a specific requirement for 90 cm in some sections) and a minimum width of 45–75 cm, ensuring compliance with all relevant standards. - **Conduit Installation:** Install four (4) Ø110 mm underground-rated PVC conduits in a 1×4 configuration, maintaining specified horizontal and vertical clearances and spacing. Each conduit must be capped, unobstructed, and include a draw-string for future cable pulls. The use of foam, sealant, or any filler inside spare conduits is strictly prohibited. - **Bedding and Backfill:** Provide a 10 cm clean masonry sand bedding, followed by 21 cm of sand backfill, warning tape 30 cm above the conduit crown, and 37 mm of well-graded crushed aggregate. The surface must be restored with a 22 cm concrete slab matching the adjacent area in thickness, strength, and appearance. - **Site Restoration and Safety:** Implement comprehensive site protection, erosion control, and restoration measures. All personnel must use appropriate PPE, and work must be conducted between 9AM and 5PM. Concrete pouring is prohibited during suspected storms. - **Documentation and Reporting:** Maintain daily progress logs and submit daily PDF work reports. Deliverables include an underground routing plan, construction drawings, material submittals, as-built drawings, and technical data sheets. - **Testing and Acceptance:** Conduct compaction testing, depth verification, and provide documentation to demonstrate compliance. Final acceptance is contingent upon meeting all technical specifications, complete as-built documentation, and restoration of the site to its original or improved condition. - **Warranty:** A minimum 12-month warranty on all workmanship and installed materials is required, with prompt correction of any defects at no additional cost. **Contracting Entity and Location** The contracting activity is managed by FA5682 31 CONS DA LGC, a federal office under the Department of the Air Force, Department of Defense. The place of performance is Campia Turzii, Cluj (RO-CJ), Romania. **Procurement Type and Special Considerations** This notice is a Sources Sought, intended to gather information from potential contractors and does not constitute a solicitation or request for proposals at this stage. There are no set-aside requirements or special procurement types indicated in the notice. Contractors must be prepared to comply with all U.S. Government (USG) and Romanian Air Force (RoAF) security protocols, including advance base access requests and protection of sensitive infrastructure information. **Support and Oversight** The USG and RoAF will facilitate access to controlled areas, coordinate with local authorities and utility providers, and provide oversight and quality assurance inspections. However, all tools, materials, and labor must be furnished by the contractor unless otherwise specified. **Period of Performance** The anticipated period of performance is 14 working days from Notice to Proceed (NTP), with a detailed schedule and milestones required within 10 days of award. **Contact Information** Interested parties may direct inquiries to the following contacts: - Primary: Delvin Talton ([email protected]) - Secondary: Tara Higgins ([email protected]) **Additional Information** The notice is currently active, with a response deadline of April 17, 2026. Further details, including attachments, can be accessed via the official SAM.gov opportunity listing (Opportunity ID: 151d0b79e9ef428d82df03a88e7397ce). **Summary for Contractors** This project represents a critical infrastructure upgrade with stringent technical, safety, and documentation requirements. Contractors with demonstrated experience in underground utility installations, compliance with international and U.S. standards, and the ability to operate within secure, controlled environments are encouraged to respond. The scope, deliverables, and acceptance criteria are clearly defined, ensuring transparency and consistency throughout the contract lifecycle.