Spares: B-2 Hose Assembly, Non-metallic NSN: 4720-01-362-3482FW

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

FA8119 AFSC PZABC

Contract Value

Not provided

Codes & Classification
Solicitation Number

FA811926Q0002

NAICS

336419 - Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing

Classification Code

4720

Additional Details
Set Aside

NONE

Place of Performance

Tinker AFB, Oklahoma, UNITED STATES

SourceSAM
The Department of the Air Force, through the Air Force Sustainment Center (AFSC) at Tinker Air Force Base (AFB), Oklahoma, has issued a solicitation (Procurement Identifier: FA811926Q0002) for a firm-fixed price (FFP), indefinite-delivery requirements contract to supply the B-2 Hose Assembly, Non-metallic (NSN: 4720-01-362-3482FW, Part Number: DAA3515A011-019). This procurement supports the forward environmental control system of the B-2 aircraft, ensuring continued operational readiness and sustainment of this critical Air Force asset. **Purpose and Scope:** The primary objective of this solicitation is to procure non-metallic hose assemblies specifically designed for the B-2 platform. The contract encompasses the delivery of production units, a first article for testing, and associated compliance and certification documentation. The scope includes all necessary non-recurring engineering (NRE) efforts to support production and qualification, as well as the provision of first article test reports and material certifications. **Key Requirements and Deliverables:** The solicitation outlines the following contract line items: - **Line Item 0001:** Nine (9) units of the Hose Assembly, Non-metallic. - **Line Item 0002:** One (1) unit of the Hose Assembly, Non-metallic (First Article). - **Line Item 0003:** First Article Test Report. - **Line Item 0004:** Certificate of Compliance. - **Line Item 0005:** Material Certification. - **Line Item 0006:** Non-Recurring Engineering (NRE). The hose assembly must conform to the specified dimensions (Length: 11.2", Width: 1.0", Height: 1.0", Weight: 0.17 lbs) and be manufactured from non-metallic materials. The first article test and associated reports are required to ensure compliance with Air Force standards prior to full-rate production and delivery. **Delivery and Performance:** Deliveries are to be made FOB Origin to designated locations at Tinker AFB, Oklahoma. The delivery schedule is as follows: - First Article Test Report, Certificate of Compliance, and Material Certification are due by January 1, 2027 (early delivery acceptable). - Non-Recurring Engineering deliverable is due by March 27, 2027 (early delivery acceptable). - The First Article unit and production units are due by April 3, 2028 (early delivery acceptable). The period of performance commences upon contract award and concludes upon government acceptance of all supplies. **Contracting Entity and Contact Information:** - **Contracting Office:** DEPARTMENT OF THE AIR FORCE, BLDG 3001 SUITE 1AF1-99A, TINKER AFB, OK 73145 - **Contract Specialist:** Caleb Taylor ([email protected]) - **Contracting Officer:** Jonathan Payne ([email protected]) - **Ombudsman Contact:** 405-736-3273 (for concerns during proposal development; not for solicitation requests) **Classification and Codes:** - **NAICS Code:** 336419 (Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing) - **PSC:** 4720 (Hose and Flexible Tubing) - **Place of Performance:** Tinker AFB, Oklahoma, USA **Procurement Type and Special Considerations:** This is a full and open competition; however, the requirement is not set aside for small businesses or any socioeconomic programs, as there are not two or more small businesses capable of fulfilling the requirement. Only three sources are currently approved for this item: The Boeing Company (CAGE: 81205), Northrop Grumman Systems Corporation (CAGE: 1W025), and ITL Solutions LLC (CAGE: 7BGA2). No qualification requirements or technical data packages are provided with this solicitation. **Solicitation and Submission Details:** - The anticipated solicitation issue date is April 2, 2026, with a closing date of May 5, 2026. - All responses and questions must be submitted in writing via email; no telephone requests will be accepted. - Prospective offerors must specify their business size and ownership status in their response. - The solicitation and any amendments will be posted on SAM.gov (https://sam.gov/opp/0e10516473654adf8694e37090412eb0/view). **Constant Elements Over Contract Lifecycle:** - The requirement for first article testing and associated documentation will remain unchanged. - The approved sources and part specifications are fixed for the duration of the contract. - The place of performance and delivery locations will remain at Tinker AFB, Oklahoma. - The procurement will continue to be managed by the AFSC at Tinker AFB, with the designated contracting officials as primary points of contact. This opportunity is best suited for contractors with prior approval to supply the specified hose assembly and the capability to meet stringent Air Force quality and documentation requirements. Interested parties should review the full solicitation and attachments on SAM.gov and direct all inquiries to the listed contracting officials.
Documents6