Combined Concrete Repairs - Amendment 0001
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
PBS PROJECT DELIVERY WEST - BRANCH E
Contract Value
Not provided
Codes & Classification
Solicitation Number
47PD5526R0027
NAICS
236220 - Commercial and Institutional Building Construction
Classification Code
Z2AA
Additional Details
Documents3
The General Services Administration (GSA), through its Public Buildings Service (PBS) Project Delivery West - Branch E, has issued Solicitation 47PD5526R0027, titled "Combined Concrete Repairs - Amendment 0001." This procurement seeks qualified contractors to provide comprehensive concrete repair services at three federal facilities located in Montana. The scope of work encompasses a range of structural concrete repairs, with a focus on ensuring safety, accessibility, and the long-term integrity of critical building infrastructure.
Amendment 0001 to the solicitation addresses responses to Requests for Information (RFIs), incorporates a revised Statement of Work (SOW) dated April 20, 2026, and includes additional supporting documents. Notably, the deadline for submission of offers has been extended to May 7, 2026, with all proposals due no later than 4:30 PM Central Standard Time. All other terms and conditions of the original solicitation remain unchanged.
The project is classified under NAICS Code 236220 (Commercial and Institutional Building Construction), with Product Service Code Z2AA, and is set aside for SBA-qualified contractors. The primary place of performance is Billings, Montana, with additional work at federal facilities in Bozeman and Butte.
The procurement covers the following facilities and work scopes:
1. **James F. Battin Federal Courthouse – Billings, MT**
- **Primary Work:** Parking garage stairway repairs.
- **Key Tasks:** Comprehensive assessment of existing damage; repair of cracks, spalling, and chipped stair treads; cleaning or replacement of rebar as necessary; and surface leveling to ensure smooth transitions.
2. **Bozeman USPS and Federal Building – Bozeman, MT**
- **Primary Work:** Repairs to perimeter sidewalks and ADA-compliant ramps.
- **Key Tasks:** Full assessment of exterior walkways; concrete repairs including truncated dome surfaces for accessibility; mitigation of root-related damage; and surface leveling for safe transitions.
3. **Mike Mansfield Federal Building – Butte, MT**
- **Primary Work:** Selective concrete patching.
- **Key Tasks:** Removal of deteriorated concrete to a sound base; restoration or replacement of rebar with epoxy anchoring; application of bonding agents and patching materials; and matching of existing finishes for a seamless appearance.
Across all sites, contractors are required to obtain all necessary permits and licenses, conduct thorough pre-work assessments, and execute standard concrete repair procedures. These include saw cutting, excavation, subgrade preparation, forming, reinforcement, finishing, and curing. Contractors must ensure smooth transitions, proper surface levels, and address any exposed or damaged reinforcing steel to maintain structural integrity and compliance with applicable codes.
The contracting entity for this opportunity is the PBS Project Delivery West - Branch E, a federal office within the General Services Administration’s Public Buildings Service. The primary point of contact for this solicitation is John Morelion, who can be reached via email at [email protected].
Interested contractors should review the revised SOW and associated documents, available through the solicitation’s posting on SAM.gov (Opportunity ID: 65c153ccdb1149ef8df17bbc2f285e06), and ensure their proposals are submitted by the extended deadline. This opportunity is particularly suited for SBA-eligible firms with demonstrated experience in commercial and institutional concrete repair, especially those familiar with federal facility requirements and ADA compliance.
Contractors considering this opportunity should note the emphasis on quality workmanship, adherence to safety and accessibility standards, and the ability to coordinate work across multiple sites within Montana. The project’s requirements and objectives are expected to remain consistent throughout the contract lifecycle, focusing on durable repairs, minimal disruption to facility operations, and compliance with all regulatory and agency standards.