RFI - AMSS 5/10 Man Tent
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
W6QK ACC-APG NATICK
Contract Value
Not provided
Codes & Classification
Solicitation Number
PdMFSS-2602
NAICS
-
Classification Code
-
Additional Details
Documents2
The U.S. Army, through the Army Contracting Command – Aberdeen Proving Ground (Natick), is conducting a market research effort to identify mature, state-of-the-art shelter solutions for its Arctic Mobility Sustainment System (AMSS) 5-man Team and 10-man Squad Arctic Shelter (AS) program. This Request for Information (RFI), issued under procurement identifier PdMFSS-2602, is a sources sought notice intended to assess industry capabilities and inform the Army’s future acquisition strategy for modernizing its cold weather shelter systems.
**Purpose and Scope**
The AMSS initiative aims to replace legacy arctic shelters and mobility systems, originally developed in the 1950s and last updated in the 1980s, which are no longer produced or standardized across Army units. The Army’s operational requirements in Arctic and extreme cold weather environments (Climate Zone 7) necessitate advanced, lightweight, and integrated shelter solutions to enhance unit mobility, survivability, and sustainability. The intended outcome is to equip Brigade Combat Teams (BCTs) with standardized shelters that significantly improve readiness, reduce risk to personnel, and ensure mission success in harsh environments.
**Key Requirements and Objectives**
The Army seeks Commercial-Off-The-Shelf (COTS) or emerging technologies at Technology Readiness Level (TRL) 7 or higher. Solutions must address both the 5-man Team and 10-man Squad shelter variants, with the following core requirements:
- **Protection and Performance:** Shelters must provide robust protection from hazardous cold, be breathable, wind/water resistant, flame resistant, and fully operational at –40°F (ideally –65°F).
- **Rapid Deployment:** Soldiers must be able to assemble/disassemble the shelter in 20 minutes or less (ideally 5 minutes), while wearing issued arctic clothing, in all weather conditions.
- **Weight Limits:** The 5-man shelter system must not exceed 60 lbs; the 10-man system must not exceed 100 lbs.
- **Durability and Longevity:** Systems must have a minimum useful life of 5 years and a storage life of 10 years.
- **Compliance:** Solutions must be Berry Amendment and Buy American Act compliant.
- **Signature Management:** Shelters must feature a low profile, blackout capability, and integrated visual concealment; ideally, they should mitigate detection across NIR, SWIR, MWIR, and LWIR spectrums.
- **Additional Features:** Must include a stove jack, meet MIL-STD 810-H requirements, and support continuous 72-hour missions.
**Expected Deliverables**
Respondents are to submit a white paper (maximum 10 pages) detailing their proposed shelter solutions for both variants. Submissions must include technical descriptions, system specifications, deployment methods, quantitative performance metrics, manufacturing capabilities, production scalability, and estimated unit costs. Additional information such as supply chain risks, relevant product history, and compliance with U.S. government procurement requirements (CAGE/NCAGE codes) is also required.
**Contracting Entity and Contact Information**
This RFI is issued by W6QK ACC-APG Natick, a federal office under the Department of Defense, Department of the Army. The primary points of contact for submissions and inquiries are:
- Raul Lopez, Project Lead ([email protected])
- Clinton McAdams, Project Engineer ([email protected])
**Submission Instructions and Timeline**
Interested parties must submit electronic responses in PDF or DOCX format by 16 April 2026, 5:00 PM EDT. The subject line should reference “Arctic Mobility Sustainment System (AMSS) 5-man Team and 10-man Squad Arctic Shelter (AS).” Submissions will be acknowledged by email and assigned an identification number.
**Procurement Type and Special Considerations**
This notice is strictly a Request for Information and does not constitute a solicitation or a commitment to procure. No contracts will be awarded based on responses to this RFI, and the government will not reimburse costs associated with participation. All proprietary information will be handled in accordance with applicable regulations. Respondents whose technologies are of interest may be invited to participate in an Industry Day event in June 2026, with further field evaluations possible.
**Constant Elements Over Contract Lifecycle**
- The focus on mature, compliant, and high-performance shelter solutions for Arctic operations.
- The requirement for rapid deployment, durability, and advanced concealment features.
- The expectation of U.S. manufacturing and compliance with federal procurement regulations.
- The Army’s intent to standardize and modernize its cold weather shelter capabilities for improved operational effectiveness.
For further details and to access the official notice, visit: [SAM.gov Opportunity ID 7d276af26688477abca55c857cb79284](https://sam.gov/opp/7d276af26688477abca55c857cb79284/view).