McNary Lock & Dam Spillway Infrastructure Upgrades
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
US ARMY ENGINEER DISTRICT WALLA WAL
Contract Value
Not provided
Codes & Classification
Solicitation Number
W912EF26RSS19
NAICS
237990 - Other Heavy and Civil Engineering Construction
Classification Code
Z2KA
Additional Details
The U.S. Army Corps of Engineers (USACE), Walla Walla District, is conducting market research through a Sources Sought notice to identify qualified business concerns capable of executing a major construction project titled "McNary Lock & Dam Spillway Infrastructure Upgrades." This initiative is focused on comprehensive electrical and structural modernization of the spillway at the McNary Lock and Dam, located within the project footprint in Umatilla/Benton Counties, Oregon.
The primary objective of this project is to replace and upgrade aging infrastructure to accommodate the installation of new, heavier spillway gantry cranes and gate hoists. The existing electrical and control systems, dating back to 1953 and 1974 respectively, are obsolete and insufficient for the demands of modern equipment, presenting operational and safety risks. The intended outcome is to enhance system safety, reliability, and compliance with current engineering and safety standards.
The scope of work encompasses significant structural upgrades, including the demolition and replacement of concrete pedestals with anchored steel pedestals, reinforcement of main steel girders, and strengthening of the downstream reinforced concrete beam in the north non-overflow section using additional reinforcing steel and externally bonded FRP systems. The project also involves a complete overhaul of the power system, upgrading the main power feed from 4.16kV to 13.8kV, replacing primary transformers with higher capacity units, and installing new switchgear, feeder cables, and an emergency diesel generator. Redundancy and reliability will be improved through an automated feeder transfer system and new dedicated 480V ties between substations.
Control system modernization is a key component, with the installation of a networked control system utilizing OPTO 22 Edge Programmable Industrial Controllers and Cisco industrial switches at each hoist. Existing hoist control cabinets will be replaced, and new safety features such as audible horns and visual strobe lights with verification interlocks will be added. The upgraded system will support both local hardwired and remote network control modes, with manual override capabilities from the control room.
Additional upgrades include a complete overhaul of the SC9 control panel in the control room, installation of an annunciation panel in the navigation lock building, verification and installation of control and phone cables in the spillway gallery, and the addition of phone line junction boxes.
Contractors will be required to adhere to stringent safety and quality control standards. A dedicated Site Safety and Health Officer (SSHO) with 30-hour OSHA training and a Contractor Quality Control Manager (CQC) with Corps of Engineers Construction Quality Management certification must be present on site. The contractor must develop and maintain a network analysis system (NAS) schedule and utilize the Corps of Engineers electronic Quality Control System for record management. All on-site work will be governed by the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1).
The anticipated contract will be a Firm-Fixed Price agreement, with an estimated construction magnitude between $25,000,000 and $100,000,000. Contractors must be able to provide 100% performance and payment bonds. The applicable NAICS code is 237990 (Other Heavy and Civil Engineering Construction), with a small business size standard of $45,000,000. The Product Service Code is Z2KA.
As part of the market research, interested firms are requested to submit a capability statement addressing their experience with projects of similar magnitude and complexity, bonding capacity, business size and type, and any special qualifications or certifications. Additionally, the USACE is seeking input regarding the potential use of a Project Labor Agreement (PLA), including willingness to participate, prior experience, and perspectives on the impact of a PLA on project cost, risk, and workforce availability.
Responses should be submitted to Chandra D. Crow, Contract Specialist, at 201 North 3rd Avenue, Walla Walla, Washington 99362, or via email at [email protected], no later than 3:00 PM on April 24, 2026. For further information, Cynthia Jacobsen may also be contacted at [email protected] or 509-527-7214.
This notice is for information and planning purposes only and does not constitute a solicitation. The information gathered will be used to determine the appropriate acquisition strategy, including potential set-aside requirements.
Contractors with expertise in heavy civil and electrical infrastructure upgrades, particularly those with experience in dam or similar critical infrastructure projects, are encouraged to review the detailed requirements and consider responding to this opportunity.