N--Phoenix Data Center Re-cabling Project Phase III -
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
WESTERN-DESERT SOUTHWEST REGION
Contract Value
Not provided
Codes & Classification
Solicitation Number
89503126QWA000392
NAICS
238210 - Electrical Contractors and Other Wiring Installation Contractors
Classification Code
N061
Additional Details
The Western Area Power Administration (WAPA), Desert Southwest Region, has issued an award notice for the Phoenix Data Center Re-cabling Project Phase III – Installation. This procurement activity is part of a multi-phase initiative aimed at upgrading and enhancing the cabling infrastructure within the Phoenix Data Center, ensuring reliable and efficient electrical and data connectivity to support ongoing operations.
The scope of this project encompasses the installation of new cabling systems, with a focus on electrical and wiring components, as indicated by the NAICS code 238210 (Electrical Contractors and Other Wiring Installation Contractors) and Product Service Code N061. The primary objective is to modernize the data center’s cabling infrastructure, thereby improving system performance, reducing downtime, and supporting future technological advancements. Contractors are expected to deliver high-quality installation services that meet federal standards and align with WAPA’s operational requirements.
The contracting entity for this project is the Western Area Power Administration’s Desert Southwest Region, a federal office under the Department of Energy. The project is located in Phoenix, Arizona, and is managed by Timothy Robert Kramer, who serves as the primary point of contact. Interested parties may reach Mr. Kramer via email at [email protected] or by phone at (720) 962-7737 for further information or clarification regarding the project.
This procurement is classified as an award notice, indicating that the contract has already been awarded. The notice remains active and is accessible through the SAM.gov portal, with the opportunity ID 5f3613ae559e42caaddade19f34e0fa2. No additional documents or attachments are currently available for review.
Contractors evaluating this opportunity should note that the project is focused on electrical and wiring installation within a federal data center environment. The requirements and deliverables are expected to remain consistent throughout the contract lifecycle, emphasizing quality installation, adherence to federal standards, and support for the data center’s operational needs. While specific set-aside requirements or special considerations are not detailed in the notice, the classification codes and federal context suggest a need for experienced contractors with expertise in large-scale cabling projects.
Overall, this award represents a significant infrastructure upgrade for WAPA’s Phoenix Data Center, with the intended outcome of improved reliability, scalability, and operational efficiency for the facility’s critical systems.