Custer Gallatin NF - Fairy Lake Phase 2 Road & Recreation Improvements

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

USDA-FS, CSA INTERMOUNTAIN 9

Contract Value

Not provided

Codes & Classification
Solicitation Number

1240LU26Q0012

NAICS

237310 - Highway, Street, and Bridge Construction

Classification Code

Z2LB

Additional Details
Set Aside

SBA

Place of Performance

Bozeman, Montana, UNITED STATES

SourceSAM
The United States Department of Agriculture (USDA) Forest Service, through its Intermountain Region Contracting Office (CSA Intermountain 9), has issued a combined synopsis/solicitation for the "Fairy Lake Phase 2 Road & Recreation Improvements" project, located on the Bozeman Ranger District of the Custer Gallatin National Forest in Bozeman, Montana. This procurement, identified under solicitation number 1240LU26Q0012, is classified under NAICS code 237310 (Highway, Street, and Bridge Construction) and product service code Z2LB, and is designated as a Total Small Business Set-Aside, inviting participation exclusively from qualified small business concerns. The primary objective of this project is to enhance access, safety, and recreational infrastructure at Fairy Lake through a comprehensive suite of road and recreation improvements. The scope of work encompasses excavation, drainage enhancements, road reconditioning, surface stabilization, trail reconditioning and surfacing, as well as the installation of new vehicle turnouts, vault toilet facilities, aggregate surfacing, and two Aquatic Organism Passage (AOP) culverts. All work must be performed in strict accordance with FP-24, Forest Service Supplemental Specifications, and project-specific requirements, ensuring compliance with federal standards and environmental considerations. The anticipated period of performance for this contract is from October 1, 2026, through October 30, 2027. Notably, the commencement of Phase 2 activities is contingent upon the completion of Phase 1, which is currently projected to conclude by September 2026. The total estimated magnitude of construction for this project falls between $1,000,000 and $5,000,000, indicating a substantial and multifaceted effort suitable for experienced contractors with demonstrated capabilities in heavy civil and recreational infrastructure projects. Key deliverables include: - Excavation and grading for road and trail improvements - Installation and enhancement of drainage systems - Road and trail surface stabilization and reconditioning - Construction of new vehicle turnouts - Installation of vault toilet(s) to improve visitor amenities - Placement of aggregate materials for road and trail surfaces - Installation of two AOP culverts to support aquatic habitat connectivity The procurement is being managed by the USDA Forest Service, with Lisa Rakich ([email protected], 406-491-0561) serving as the primary point of contact, and Grant Morrison ([email protected], 406-587-6724) as the secondary contact. Interested parties should note that the solicitation has undergone recent amendments, including an updated item schedule and an extension of the quote due date to April 24, 2026. Contractors considering this opportunity should ensure their qualifications align with the technical requirements and federal construction standards outlined in the solicitation documents. The project location in Bozeman, Montana, may present logistical and environmental challenges typical of forested and recreational settings, and experience in similar environments will be advantageous. All responsible small businesses are encouraged to review the full solicitation and associated attachments, available via the official SAM.gov opportunity listing (https://sam.gov/opp/f0a8e2b3a1fe4615a1b3678053fa0cc5/view), and to submit quotations in accordance with the specified instructions and deadlines. This project represents a significant opportunity to contribute to the long-term sustainability and enjoyment of the Custer Gallatin National Forest’s recreational resources.
Documents10