COMPREHENSIVE EVERGLADES RESTORATION PLAN (CERP) INDIAN RIVER LAGOON SOUTH (IRL-S) C-44 RESERVOIR AND STORMWATER TREATMENT AREA (C-44 RSTA) SEEPAGE MANAGEMENT FEATURE - RELIEF WELLS CONTRACT A, MARTIN COUNTY, FLORIDA

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

W074 ENDIST JACKSNVLLE

Contract Value

Not provided

Codes & Classification
Solicitation Number

W912EP26Z1BBR

NAICS

237990 - Other Heavy and Civil Engineering Construction

Classification Code

Y1PZ

Additional Details
Set Aside

None

Place of Performance

Indiantown, Florida, UNITED STATES

SourceSAM
Documents4
The U.S. Army Corps of Engineers, Jacksonville District, has issued a Special Notice announcing an upcoming Virtual Industry Day for the Comprehensive Everglades Restoration Plan (CERP) Indian River Lagoon South (IRL-S) C-44 Reservoir and Stormwater Treatment Area (C-44 RSTA) Seepage Management Feature – Relief Wells Contract A. This event is scheduled for Wednesday, April 1, 2026, and is intended to engage industry stakeholders in preliminary planning for a significant groundwater management project in Martin County, Florida, specifically in the vicinity of Indiantown. **Purpose and Scope** The primary objective of this procurement is to construct approximately 126 pre-designed groundwater pressure relief wells adjacent to the C-44 Reservoir site, which spans roughly 12,000 acres north of Citrus Boulevard and the C-44 Canal (St. Lucie Canal), between Lake Okeechobee and the Atlantic Ocean. The relief wells are a critical component of the seepage management feature, designed to mitigate groundwater pressure and manage seepage around the reservoir, thereby supporting the broader goals of Everglades restoration and water quality improvement. **Key Requirements and Expected Deliverables** Contractors will be responsible for the following major tasks: - Construction of 126 relief wells, each approximately 60 feet deep, with a 10-inch diameter stainless steel riser and high-flow screen, installed in an 18 to 24-inch diameter borehole. - Management of borehole wall stability across diverse subsurface conditions, including clay, silty sands, loose and dense sands, limestone/sandstone, and shell materials, with groundwater conditions anticipated to be slightly artesian. - Installation of uniform, non-calcareous filter media compatible with encountered subsurface materials, placed by tremie method, and sealing above the screen with bentonite and grout. - Construction of surface protection, access, and discharge features for each well, including a 4-foot diameter manhole (Florida DOT standard or equivalent) and a 12-inch discharge pipe terminating at the canal water level within a concrete headwall. - Documentation of well construction, development, and pump testing, with strict timelines for acceptance and completion of outfall features (wells must be tested and accepted within 5 days of construction; outfall construction must be completed within 14 days of excavation and no more than 60 days after well completion). **Project Challenges** The project presents several technical challenges, including: - Managing borehole stability and artesian conditions during drilling. - Coordinating construction activities in a flat, grass-covered site with variable groundwater and canal water levels. - Ensuring timely procurement and installation of specialized materials (well screens, risers, filter media). - Addressing logistical and environmental risks, such as seasonal weather impacts and restrictions on water source usage for drilling operations. **Contracting Entity and Classification** The procurement is managed by the U.S. Army Corps of Engineers, Jacksonville District (W074 ENDIST JACKSNVLLE), under the Department of Defense, Department of the Army. The applicable North American Industry Classification System (NAICS) code is 237990 (Other Heavy and Civil Engineering Construction), with a small business size standard of $45.0 million. The Product Service Code is Y1PZ. **Procurement Type and Special Considerations** This notice is for market research and industry engagement only; it is not a solicitation and no contract will be awarded at this stage. The event is open to all interested parties, including prospective prime contractors, subcontractors, and suppliers. Draft specifications are available for review, and the government is seeking capability statements and feedback from qualified firms to inform the acquisition strategy. A notable consideration is the potential requirement for a Project Labor Agreement (PLA) under Executive Order 14063, applicable to federal construction projects exceeding $35 million. The government is soliciting industry input on the impact and value of PLAs for this project. **Industry Day Details and Participation** The Virtual Industry Day will be held via Microsoft Teams, with a presentation from 9:00–10:00 AM EDT covering project scope, design, construction considerations, acquisition timeline, and contracting requirements. Breakout sessions for prime contractors will be available by reservation between 10:30 AM and 2:00 PM. Interested firms must register by submitting a capabilities statement via email to Ligaya Lowe ([email protected]) and Martha Sequeira ([email protected]) no later than March 30, 2026, at 5:00 PM EDT. The subject line should reference "Industry Day Registration (Your Company Name) - W912EP26Z1BBR IRLS C-44." **Constant Elements Throughout Contract Lifecycle** - The project location remains fixed in Indiantown, Martin County, Florida. - The scope centers on relief well construction and associated surface/discharge features. - The NAICS code and small business size standard are established. - The contracting entity is the U.S. Army Corps of Engineers, Jacksonville District. - The period of performance is anticipated to be 1,060 calendar days from Notice to Proceed, with work commencing within 60 days of NTP. - PLA requirements and small business opportunities will be considered as part of the acquisition strategy. **Contact Information** Primary Contact: Ligaya Lowe ([email protected], 904-232-2750) Secondary Contact: Martha Sequeira ([email protected], 904-232-2021) **Additional Information** Questions prior to Industry Day should be submitted via ProjNet using the Bidder Inquiry Key R3V4PZ-5WFPW8. Presentation slides and attendee lists will be posted to the SAM.gov notice after the event. Firms are encouraged to review draft specifications and provide detailed responses to technical and PLA-related questions as outlined in the notice. **Summary for Contractors** This opportunity is ideal for firms with demonstrated experience in large-scale well construction, groundwater management, and heavy civil engineering projects, particularly those familiar with Florida’s geotechnical conditions. Contractors should assess their capabilities in managing complex subsurface drilling, material logistics, and adherence to stringent construction timelines. Participation in the Industry Day and submission of a capabilities statement will position firms for future engagement when the formal solicitation is released. For further details and to access attachments, visit the official SAM.gov notice at: https://sam.gov/opp/733f5d190b8e472f96dac40ebed3e3d4/view