Panel, Protection, Electric
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
DLA AVIATION AT OKLAHOMA CITY, OK
Contract Value
Not provided
Codes & Classification
Solicitation Number
SPRTA1-26-R-0205
NAICS
336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
Classification Code
6110
Additional Details
Documents1
The Defense Logistics Agency (DLA) Aviation at Oklahoma City, OK, has issued a solicitation (RFP# SPRTA1-26-R-0205) for the procurement of electric protection panels, specifically identified as "Panel, Protection, Electric" (NSN: 6110-01-222-3807, Part Number: 907D653-5). This procurement is intended to support the maintenance and operational readiness of the B-52 aircraft fleet by providing critical spares that ensure the protection and control of the aircraft’s generator systems.
The scope of this solicitation encompasses the supply of 83 units (with an allowable range of 21 to 125 units) of the specified electric protection panels. Each panel measures 12.0 inches in length, 8.0 inches in width, and 5.5 inches in height, with a weight of 12 pounds. The panels are composed of electrical appliances and instruments not otherwise indicated (NOI) and are essential for the safe and reliable operation of the B-52 aircraft’s electrical systems.
The panels are to be delivered to Hill Air Force Base (SW3210), Utah, with a required delivery date on or before January 22, 2029. The procurement is classified under NAICS code 336413 (Other Aircraft Parts and Auxiliary Equipment Manufacturing) and Product Service Code 6110 (Electrical Control Equipment). This acquisition is not set aside for small businesses, and surplus material is not authorized.
A key requirement for this procurement is that only approved sources may supply the panels. Currently, Hamilton Sundstrand Corporation (CAGE 99167) is listed as a qualified source. The solicitation notes that the government does not possess the data or rights necessary to manufacture this item, and interested firms are encouraged to contact the original equipment manufacturer (OEM) regarding data rights or potential qualification. The acquisition is governed by AMC 4/R, indicating that the item is restricted to approved sources due to the lack of available technical data.
Unique Item Identification (UID) requirements will apply to this procurement, ensuring traceability and accountability of each delivered unit. Export control requirements do not apply to this solicitation.
The procurement will be conducted using electronic procedures, with all solicitation documents available exclusively through www.sam.gov. Hard copies will not be distributed. The anticipated issue date for the solicitation is March 24, 2026, with a closing date of April 23, 2026. The government expects to make an award approximately 90 days after the notice issuance, contingent upon the availability of appropriated funds.
This acquisition is being pursued under the authority of 10 U.S.C. 2304(c)(1) and FAR 6.302, which allows for solicitation and negotiation with only one or a limited number of responsible sources when no other supplies or services will satisfy agency requirements. While this is not a request for competition, all responsible sources may submit a proposal, which will be considered by the agency. The government reserves the right to determine whether to conduct a competitive procurement based on responses received.
Price will be a significant factor in the evaluation of offers, but the final award decision may also consider past performance and other factors as detailed in the solicitation. An Ombudsman has been appointed to address concerns from offerors during the proposal development phase; interested parties may contact the Ombudsman at 385-591-1672 for issues unrelated to solicitation requests.
For further information or questions regarding this procurement, interested parties should contact the buyer, Chrissy Turnage, at [email protected].
This opportunity is suitable for contractors with experience in manufacturing or supplying specialized aircraft electrical components, particularly those with prior approval or the ability to become an approved source for the specified part. The long lead time and strict qualification requirements underscore the importance of early engagement with the OEM and the contracting office for interested parties.