Z--GRTE REPLACE HIGHLANDS W&WW
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
IMR NORTHERN ROCKIES(12200)
Contract Value
Not provided
Codes & Classification
Solicitation Number
140P1426R0010
NAICS
237110 - Water and Sewer Line and Related Structures Construction
Classification Code
Z2NE
Additional Details
The National Park Service, under the Department of the Interior, has issued a solicitation (Procurement Identifier: 140P1426R0010) for the replacement of water and wastewater systems at the Highlands Historic District within Grand Teton National Park, located approximately five miles north of Moose, Wyoming. This procurement, managed by the IMR Northern Rockies office, is specifically set aside for Women-Owned Small Businesses (WOSB) under NAICS code 237110, which covers Water and Sewer Line and Related Structures Construction. The estimated project magnitude falls between $1,000,000 and $5,000,000, in accordance with FAR 36.204.
The scope of work encompasses the comprehensive replacement of both water and wastewater infrastructure serving the Highlands Historic District. Key project elements include extending the existing Moose water transmission line to the Highlands area, which will require trenching across Cottonwood Creek using diversion and dewatering methods. The internal water distribution system within the district will be replaced, and the existing well and associated infrastructure will be abandoned. For the wastewater system, the project calls for installation of a new lift station, septic tank, leach field, and collection piping, with the current system to be decommissioned and abandoned in place.
Construction activities are expected to disturb approximately 2.5 acres within a designated 4-acre project area. Staging for construction will occur both onsite and at the Beaver Creek boneyard. Standard civil construction equipment will be utilized, and all revegetation efforts will be coordinated closely with park staff to ensure compliance with environmental and aesthetic standards.
The solicitation package includes detailed specifications, supporting documents, and attachments, which are incorporated by reference (see Section J). Contractors are required to adhere strictly to the provided plans and specifications. Davis Bacon wage rates apply to this project, and all offerors must be registered in the System for Award Management (SAM) with current online Representations and Certifications prior to submitting their proposals.
Interested parties should note that this procurement is currently marked as active; however, Amendment 1 has canceled the solicitation due to changes in government needs. A replacement solicitation may be issued at a later date. Contractors are encouraged to monitor the official notice page for updates.
For further information or to submit questions regarding this opportunity, contractors should contact Molly Lynam, Contract Specialist, at [email protected]. All questions must be submitted in writing no later than ten calendar days prior to the offer due date. Additional instructions for submitting offers, site visit details, and project duration requirements are provided in the solicitation (refer to Sections L, M, and applicable FAR clauses).
This opportunity represents a significant infrastructure improvement project within a sensitive and high-profile national park setting, requiring experienced contractors with demonstrated capabilities in water and wastewater system construction, environmental compliance, and coordination with federal stakeholders.
Documents12