J036--PNEUMATIC TUBE SYSTEM UPGRADE - Base [605] | POP: 04/01/2026 - 03/31/2027
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
262-NETWORK CONTRACT OFFICE 22 (36C262)
Contract Value
Not provided
Codes & Classification
Solicitation Number
36C26226Q0417
NAICS
333922 - Conveyor and Conveying Equipment Manufacturing
Classification Code
J036
Additional Details
The Department of Veterans Affairs (VA), through its Network Contracting Office 22 (NCO 22), is soliciting quotations for a comprehensive upgrade of the pneumatic tube system at the VA Loma Linda Healthcare System (VALLHCS), Jerry L. Pettis VA Medical Center, located at 11201 Benton Street, Loma Linda, CA 92357-1000. This procurement, identified under RFQ 36C26226Q0417, is a combined synopsis/solicitation for commercial products and services, issued in accordance with the Revolutionary FAR Overhaul (RFO) and FAR subpart 12.202 streamlined procedures. The period of performance for this contract is anticipated to run from April 1, 2026, through March 31, 2027.
**Purpose and Scope**
The primary objective of this procurement is to modernize and maintain the hospital’s pneumatic tube system, which has been in service for over 20 years and is critical to the facility’s operations. The existing system is at end-of-life, with parts no longer manufactured, posing a significant risk to hospital logistics, including the timely transport of medications and specimens. The upgrade aims to ensure continued reliability, reduce downtime, and enhance operational efficiency, thereby safeguarding patient care and supporting the hospital’s mission.
The contractor will be responsible for providing all labor, materials, supplies, tools, equipment, parts, software, travel, supervision, and qualified personnel necessary to complete the upgrade and maintenance of the pneumatic tube system. The scope includes the installation of new hardware and software, replacement of obsolete components, integration of advanced features, and comprehensive staff training.
**Key Requirements and Deliverables**
- **System Upgrade:** Installation of a new, Windows-based Dell desktop computer with a 50-inch monitor and AL 5000 system software, replacing the outdated system. The new computer will be installed in the Electronic Shop (1D-03), and the old unit will be removed from the Blood Lab (1F-21).
- **Hardware Enhancements:** Upgrade all 23 diverters with AL-850 control cards, add shut-off valves for compressed air, replace optics, O-rings, and all rubber boots. Replace 23 WS1 front panels, install new loader arm optics, and add compressed air shut-off valves.
- **Software and Interface Improvements:** Implementation of advanced, graphics-based diagnostic software to minimize downtime, reduce transaction times, and enhance system throughput. Features include SQL database transaction logging, graphical user interface, color-coded system status, carrier route visualization, and enhanced user keypads with shortcut keys and online directories.
- **System Integration:** Connect all three system zones using Dazzle configuration, re-pipe system turnaround in the mechanical room, and ensure network and RFID readiness.
- **Fire and Safety Compliance:** All penetrations through fire and smoke walls must be sealed with UL-approved fireproof materials, in accordance with Section 07 84 00, FIRESTOPPING.
- **Training and Documentation:** Provide a one-week field training course for designated staff, covering all operational and maintenance aspects. Deliver six complete sets of operation and maintenance manuals, including step-by-step procedures, parts lists, wiring diagrams, and troubleshooting guides. Provide as-built drawings (three hard copies at 24” x 36” and one AutoCAD copy on DVD) upon final system certification.
- **Testing and Certification:** Submit a detailed test plan and procedures at least ten days prior to testing. Conduct comprehensive system tests, including computer simulation, multi-station dispatching, and cross-zone operations, with results documented in formal test reports.
- **Maintenance and Over-and-Above Repairs:** Any unforeseen repairs or requirements must be approved by the Contracting Officer (CO) before initiation. Only authorized services as specified in the contract are permitted.
**Contractor Qualifications and Compliance**
Offerors must possess:
- A 30-hour OSHA safety card
- Air Link Tube System certification
- C-7 Low Voltage System Contractor license
- C-10 Electrical Contractor license
Contractor personnel must adhere to all VA, local, state, and federal safety and operational regulations, including OSHA 29CFR, NFPA 70E, NFPA 99, and VHA Master Specifications. All staff must obtain Loma Linda PIV badges, comply with energy source lockout/tagout procedures, and coordinate daily activities with the designated VA COR.
**Administrative and Security Considerations**
- The contract is not set aside for small business concerns.
- The applicable NAICS code is 333922 (Conveyor and Conveying Equipment Manufacturing), with a size standard of 500 employees. The Product Service Code (PSC) is J036.
- No government-furnished equipment will be provided.
- The contract does not involve IT security accreditation or connection to VA internal networks.
- All contractor personnel must visibly display identification, comply with VA parking and smoke-free policies, and are subject to search and federal regulations regarding weapons and contraband.
- The contractor is responsible for all insurance requirements, including Workers Compensation and Employee Public Liability Insurance, and must provide proof of coverage within 15 days of award notification.
**Contract Administration and Invoicing**
- The contract will be administered by the designated Contracting Officer and COR. Only the CO or their designee may authorize changes or additional services.
- Invoices must be submitted electronically via the Tungsten Network in accordance with VAAR Clause 852.232-72.
- Payment will be made in arrears upon satisfactory completion of services and proper invoice submission. No advance payments or reimbursement for overtime/holiday pay will be authorized.
**Evaluation and Submission Requirements**
Award will be made based on a comparative evaluation of price and past performance, with price being the more significant factor. Past performance will be assessed using CPARS and FAPIIS ratings. All quotes must include a completed schedule, a capabilities statement demonstrating required certifications and qualifications, and a statement of acceptance of the solicitation’s terms and conditions.
Questions regarding the solicitation must be submitted electronically by March 11, 2026, and final quotations are due by March 24, 2026, at 10:00 PDT, to [email protected]. Late submissions will be handled per FAR 52.212-1(f).
**Contact Information**
- Contracting Officer: Norman Napper-Rogers
- Email: [email protected]
- Phone: 602-795-4170
**Summary**
This opportunity represents a critical infrastructure upgrade for the VA Loma Linda Healthcare System, requiring a contractor with demonstrated experience in pneumatic tube systems, hospital environments, and compliance with stringent safety and operational standards. The successful contractor will deliver a turnkey solution encompassing hardware, software, integration, training, and documentation, ensuring the continued reliability and efficiency of a vital hospital logistics system.
For full solicitation details, attachments, and amendments, interested parties should refer to the official posting at: https://sam.gov/opp/7643a4470c664d8d83114820fccc43b8/view.
Documents11