Fort Buchanan Microgrid

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

W072 ENDIST LOUISVILLE

Contract Value

Not provided

Codes & Classification
Solicitation Number

W912QR-26-R-A028

NAICS

237130 - Power and Communication Line and Related Structures Construction

Classification Code

Y1NZ

Additional Details
Set Aside

SBA

Place of Performance

San Juan, Puerto Rico, UNITED STATES

SourceSAM
The U.S. Army Corps of Engineers, Louisville District (W072 ENDIST LOUISVILLE), is soliciting proposals for a Design-Bid-Build construction project to deliver a comprehensive installation-level microgrid at Fort Buchanan, located in San Juan, Puerto Rico. This initiative is a critical component of the Department of Defense’s ongoing commitment to energy resiliency and mission assurance for its installations. The scope of work encompasses the construction and integration of approximately 8 megawatts (MW) of new diesel generators, with an optional 4 megawatt-hour (MWh) battery energy storage system (BESS) to further enhance on-site energy reliability. The project also calls for the installation of a sophisticated microgrid control system, which will include, but is not limited to, paralleling switchgear, transformers, transfer switches, circuit breakers, protective relaying, and fiber optic communication infrastructure. These elements are essential for the seamless operation and management of the microgrid. A significant aspect of the project is the installation of twelve above-ground, ballistic-resistant diesel fuel tanks, each with a 12,000-gallon capacity, equipped with a fuel polishing system. This fuel storage solution is designed to sustain critical operations at Fort Buchanan for a continuous 14-day period, ensuring operational continuity during grid outages or emergencies. The microgrid will be engineered to integrate with Fort Buchanan’s existing renewable energy assets, specifically a 4.65 MW solar photovoltaic (PV) array and two 275 kW wind turbines. This integration will maximize the use of on-site renewable generation, further supporting the Army’s energy security and sustainability objectives. Additional project requirements include all necessary site work, start-up and commissioning activities, securing interconnection agreements, and completing all assessments and authorizations required for operational readiness. The project will also involve modifications to the existing electrical distribution system as needed to establish a robust and resilient microgrid network. Approval of net metering and interconnection agreements with the local utility provider, LUMA, is a prerequisite for project completion. The contract will be awarded as a single Firm-Fixed-Price (FFP) agreement under NAICS code 237130 (Power and Communication Line and Related Structures Construction), with a size limitation of $45,000,000. The anticipated contract duration is 1,141 calendar days from Notice to Proceed, providing ample time for comprehensive execution and commissioning of the microgrid system. This procurement is set aside exclusively for General Small Business concerns, in accordance with SBA guidelines, offering a significant opportunity for qualified small business contractors with expertise in large-scale power generation, microgrid integration, and complex electrical infrastructure projects. Interested parties should note that the contracting activity is managed by the Department of the Army, with primary contact Henry Caldera available for inquiries at [email protected] or 502-315-6791. The solicitation and all associated documents are accessible via the official SAM.gov portal (Opportunity ID: 001d8dd6c3604c48af2316d493b8b531). Contractors considering this opportunity should have demonstrated experience in power generation, microgrid controls, fuel storage systems, and integration of renewable energy sources, as well as the capacity to manage large-scale, multi-year federal construction projects in compliance with all applicable regulations and standards. The project’s location in San Juan, Puerto Rico, may also require familiarity with local utility interconnection processes and resilience requirements unique to islanded grid environments. The solicitation is currently active, with proposals due by May 22, 2026, at 14:05 local time. Interested small businesses are encouraged to review all solicitation attachments and respond in accordance with the instructions provided.
Documents15