Mouth of the Columbia River (MCR) North Jetty Repair Project Phase 2

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

W071 ENDIST PORTLAND

Contract Value

Not provided

Codes & Classification
Solicitation Number

PAN25P04540

NAICS

237990 - Other Heavy and Civil Engineering Construction

Classification Code

Z2KZ

Additional Details
Set Aside

NONE

Place of Performance

Ilwaco, Washington, UNITED STATES

SourceSAM
The U.S. Army Corps of Engineers (USACE), Portland District, has issued a presolicitation notice for the upcoming Mouth of the Columbia River (MCR) North Jetty Repair Project Phase 2. This significant infrastructure initiative is designed to address critical maintenance and rehabilitation needs at the North Jetty, a key navigation structure located at the confluence of the Columbia River and the Pacific Ocean, near Ilwaco, Washington. The project is part of the broader MCR federal navigation project, which supports deep-draft navigation through three primary jetties—North Jetty, South Jetty, and Jetty A—spanning a combined authorized length of 10.2 miles. **Purpose, Scope, and Intended Outcomes** The primary objective of this procurement is to execute major maintenance and repair activities on approximately 2,300 feet of the North Jetty trunk, focusing on toe, side slope, and crest repair and reconstruction. The work is essential to ensure the continued structural integrity and functionality of the jetty, which plays a vital role in safeguarding navigation channels and supporting maritime commerce at the mouth of the Columbia River. The project will restore the jetty to its intended design parameters, thereby enhancing its resilience against harsh marine conditions and prolonging its service life. **Key Requirements, Objectives, and Expected Deliverables** The scope of work encompasses both mandatory and optional components: - **Mandatory Work:** - Repair and reconstruction of approximately 2,300 feet of the jetty trunk, both on the ocean and channel sides, primarily above 0 feet NAVD88 elevation. - Restoration to a design crest width of 30 feet (transitioning to 40 feet at the oceanward end), side slopes of 1V:1.5H (transitioning to 1V:2H at the oceanward end), and a crest elevation of +25 feet NAVD88. - Placement of approximately 17,000 cubic yards of jetty armor stone, with minimum densities of 175 to 180 pounds per cubic foot and individual stone sizes ranging from 15 to 40 tons. - Construction of a jetty crest haul road and development of a staging area for stone storage. - Execution of repairs using two primary methods: standard repair (reworking adjacent relic stone for proper placement and interlock of new stone) and reconstruction (recycling and rearranging existing competent armor stone to form a consolidated, well-interlocked armor layer, supplemented by new stone as needed). - **Optional Work:** - Major maintenance of an additional 1,000 feet of jetty trunk and 300 feet of jetty head, with similar design parameters and an estimated 8,500 cubic yards of stone placement. All work must be performed during the favorable work season, typically outside the months of November through April, due to hazardous marine and weather conditions prevalent during the winter. **Contracting Entity, Location, and Classification Codes** - **Contracting Entity:** W071 ENDIST PORTLAND, U.S. Army Corps of Engineers, Portland District (Federal Office) - **Department/Agency:** Department of Defense, Department of the Army - **Place of Performance:** Ilwaco, Washington, USA - **NAICS Code:** 237990 (Other Heavy and Civil Engineering Construction, 2022 version) - **Product Service Code:** Z2KZ **Procurement Type, Set-Aside, and Special Considerations** - **Contract Type:** Single Firm Fixed-Price contract - **Estimated Construction Cost:** Between $25,000,000 and $100,000,000 - **Source Selection:** Full and open competition via Invitation for Bid (IFB) - **Set-Aside:** None (open to all qualified firms) - **Cybersecurity Requirement:** Contractors must meet Cybersecurity Maturity Model Certification (CMMC) Level 1 (Self) prior to award and maintain compliance throughout the contract period for any systems processing Federal contract information (FCI) or controlled unclassified information (CUI). - **SAM Registration:** All offerors must be registered in the System for Award Management (SAM) prior to bid submission and award. **Timeline and Additional Information** - **Anticipated Solicitation Release:** July 2026 (to be posted on SAM.gov) - **Anticipated Award:** September 2026 - **Estimated Construction Completion:** By the end of calendar year 2028 **Contact Information** - **Primary Contact:** David Cook ([email protected]) - **Secondary Contact:** Justin Figueredo ([email protected]) **Additional Notes** This presolicitation notice is intended solely to inform industry of the forthcoming opportunity; it is not an invitation for bids, and submissions in response to this notice will not be considered. The government reserves the right to cancel the solicitation at any time and will not reimburse costs incurred in responding to this notice. Plans, specifications, and the official solicitation will be made available on SAM.gov upon release. Contractors with expertise in heavy marine construction, jetty repair, and large-scale stone placement are encouraged to monitor SAM.gov for the official solicitation and to ensure compliance with all registration and cybersecurity requirements in advance of the anticipated bid period.