USCG STA Sand Key Repair Fuel Dispensers

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

BASE MIAMI(00028)

Contract Value

Not provided

Codes & Classification
Solicitation Number

30321PR260000003

NAICS

237120 - Oil and Gas Pipeline and Related Structures Construction

Classification Code

Z2NA

Additional Details
Set Aside

SBA

Place of Performance

Clearwater Beach, Florida, UNITED STATES

SourceSAM
Documents3
The United States Coast Guard (USCG), under the Department of Homeland Security, is soliciting proposals for the comprehensive repair, overhaul, and modernization of the fuel storage and dispensing system at USCG Station Sand Key, located at 1375 Gulf Blvd., Clearwater Beach, Florida. This procurement, identified by solicitation number 30321PR260000003, is issued as a combined synopsis/solicitation and is set aside exclusively for Small Business Administration (SBA) qualified entities. The contract will be awarded as a fixed-price agreement utilizing simplified acquisition procedures in accordance with FAR Parts 13 and 15, with selection based on best value, considering both cost and past performance. **Purpose and Scope** The primary objective of this project is to restore the station’s fuel system to full operational status, ensuring compliance with all relevant federal, state, and local regulations, including EPA Underground Storage Tank (UST) requirements, Florida Department of Environmental Protection (FDEP) storage tank system regulations, NFPA 30 & 30A, Unified Facilities Criteria (UFC), and USCG Civil Engineering Unit standards. The scope encompasses a complete overhaul of the existing diesel fuel storage tanks (either UST or AST, to be verified in the field), fuel transfer pumps, dispensing stations, fuel piping (both underground and aboveground), leak detection systems, tank monitoring and alarm systems, spill containment, overfill prevention, and associated electrical controls and emergency shutoff mechanisms. **Key Requirements and Deliverables** Contractors are required to provide all labor, supervision, materials, equipment, tools, testing, permits, and incidentals necessary for the project. The work includes: - **Pre-Construction Services:** Site investigation, system condition assessment, tank tightness testing (if required), as-built verification, phased construction planning to minimize operational disruption, preparation and submission of shop drawings and submittals, and obtaining all necessary permits and approvals. - **Fuel Tank Work:** Decommissioning and removal or cleaning, inspection, and rehabilitation of existing tanks; installation of new double-wall UL-listed steel or fiberglass tanks with corrosion protection and anchoring systems as needed; installation of spill buckets and overfill protection. - **Fuel Piping Replacement:** Removal of existing underground piping, installation of new double-wall fiberglass or coated steel piping with secondary containment, flex connectors, pressure testing, and tracer wire for non-metallic piping. - **Pump & Dispenser Replacement:** Removal and replacement of fuel transfer pumps, installation of explosion-proof motors (Class I, Division 1 rated), new fuel dispensers with metering systems, hose reels, automatic shutoff nozzles, and calibration to weights and measures standards. - **Electrical & Controls:** Replacement or upgrade of control panels, installation of emergency shutoff switches, new fuel management system (if required), upgrade of conduit and wiring to NEC compliance, grounding and bonding system, and integration of leak detection monitoring. - **Environmental & Compliance:** Soil sampling (if excavation required), proper disposal of contaminated materials, certified tank cleaning, spill prevention measures, SPCC compliance updates, and submission of closure documentation (if tank removal occurs). - **Concrete & Site Restoration:** Demolition and replacement of damaged concrete pads, installation of new equipment pads, restoration of pavement, striping, and landscaping as required. - **Testing & Commissioning:** Hydrostatic tank testing, piping pressure testing, leak detection system testing, electrical system testing, dispenser calibration, full operational functional testing, and provision of written test reports. Deliverables include shop drawings, product data submittals, as-built drawings (hard copy and digital), operation and maintenance manuals, warranty documentation (minimum 1-year workmanship, 10-year tank warranty typical), and training for USCG personnel. **Phasing, Operations, and Safety** Contractors must maintain station fueling capability throughout the project or provide a temporary fuel supply solution, coordinate shutdowns with the Commanding Officer, restrict work to approved hours (Monday through Friday, 0730–1800), and maintain site security per USCG requirements. Safety requirements include submission of a site-specific safety plan, compliance with OSHA 29 CFR 1910 & 1926, confined space procedures (if tank entry required), hot work permits, fire watch during welding, and adherence to USCG base access requirements. **Quality Control and Warranty** A robust quality control plan is required, including daily quality control reports, use of qualified fuel system technicians, and employment of a licensed storage tank contractor certified by the State of Florida. The contract mandates a minimum 1-year labor warranty, manufacturer tank warranty (10–30 years depending on system), and pump/dispenser warranty per manufacturer specifications. **Project Duration and Optional Add Alternates** The estimated project duration is 4–8 months, including design and submittals (30–60 days), procurement (45–90 days), construction (60–120 days), and testing/commissioning (1–2 weeks). Optional add alternates may include a fuel polishing system, generator backup power, automated fuel tracking system, additional storage capacity, secondary containment canopy, and cathodic protection monitoring system. **Contracting Entity and Contact Information** The contracting entity is USCG Base Miami Beach (P&C), with proposals to be submitted via email to Angel Melendez ([email protected]) or mailed/hand-delivered to Commanding Officer, USCG Base Miami Beach (P&C), Attn: Angel Melendez, 12100 SW 152nd St, Miami, FL 33177. Primary points of contact for technical and site visit coordination are BMC James Pinto ([email protected], (727) 596-8666 X 105) and CPO Zachery Little ([email protected], (206) 820-4819). **Procurement Details and Special Considerations** - **NAICS Code:** 237120 (Oil and Gas Pipeline and Related Structures Construction) - **Product Service Code:** Z2NA - **Set-Aside Type:** SBA Small Business - **Place of Performance:** Clearwater Beach, Florida - **Contracting Entity:** BASE MIAMI(00028), US Coast Guard - **Wage Determinations:** FL20240184 01/05/2024 - **Applicable FAR and HSAR Clauses:** Incorporated by reference; full text available online. - **SAM Registration:** Vendors must be registered and active in SAM prior to solicitation close. - **Site Visit:** Highly recommended; scheduled for Friday, February 27, 2026, at 09:00AM EST. Contact James Pinto for arrangements. - **Proposal Deadline:** March 10, 2026, 3:00 PM EST. Questions must be submitted by March 4, 2026, 10:00 AM EST. - **Anticipated Award Date:** Approximately 10 business days after solicitation close, on or about March 20, 2026. - **Performance Period:** Work to commence no later than 10 days after award; extensions require Contracting Officer approval. This opportunity is well-suited for contractors with expertise in fuel system construction, tank installation, environmental compliance, and site restoration, particularly those certified for storage tank work in Florida and experienced in federal contracting. The project’s complexity, regulatory requirements, and operational continuity demands make it ideal for firms with robust quality control, safety, and project management capabilities. Interested parties are strongly encouraged to attend the site visit and review all attached documents and referenced clauses for full compliance.