Pre-Solicitation Notice: ERCIP Lake City Army Ammunition Plant Microgrid and Combined Heat and Power
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
W072 ENDIST LOUISVILLE
Contract Value
Not provided
Codes & Classification
Solicitation Number
W912QR26RA036
NAICS
237130 - Power and Communication Line and Related Structures Construction
Classification Code
Y1NZ
Additional Details
The U.S. Army Corps of Engineers (USACE) Louisville District has announced its intent to solicit proposals for the construction of a state-of-the-art microgrid and combined heat and power (CHP) system at the Lake City Army Ammunition Plant, located in Independence, Missouri. This initiative, identified under procurement number W912QR26RA036, is a significant infrastructure project aimed at enhancing the energy resilience, reliability, and operational flexibility of the installation.
Purpose and Scope:
The primary objective of this procurement is to deliver a comprehensive Design-Bid-Build project that will establish a microgrid system powered by two 7.5 MW dual-fuel (natural gas and propane) combustion turbines, collectively forming a 15 MW CHP power and heat production plant. The scope encompasses the installation of heat recovery steam generators (HRSGs), supplemental exhaust duct firing, and a black start diesel generator to ensure robust operational capabilities under various scenarios, including utility outages.
Key Requirements and Deliverables:
The project requires the integration of all necessary electrical distribution equipment and underground duct banks to connect the new system seamlessly with the existing electrical infrastructure. Advanced microgrid controls will be implemented to support multiple operational modes—parallel with the utility grid, islanded operation, and black start—enabling the facility to maintain critical operations during grid disruptions and to resynchronize efficiently upon grid restoration. The control system will interface with two existing substations at four points of common coupling, providing sophisticated load shedding and balancing capabilities.
Additional deliverables include:
- Installation of all piping and equipment to connect the CHP system to the plant’s existing natural gas, steam, condensate, and water infrastructure.
- Integration with the central heating plant, including a new industrial-grade control room.
- Environmental controls utilizing low NOx turbines and duct burners.
- Backup propane fuel storage and supply systems.
- Site improvements, demolition of obsolete infrastructure, full air permitting, communications, cybersecurity measures, and comprehensive commissioning.
Contracting and Procurement Details:
This opportunity will be solicited as a Firm-Fixed-Price (FFP) contract under NAICS code 237130 (Power and Communication Line and Related Structures Construction). The procurement is classified as unrestricted, full and open competition, with a HUBZone price evaluation preference. The anticipated magnitude of construction is between $25 million and $100 million, with expectations that the final value will be at the upper end of this range. The contract duration is set at 1,014 calendar days from Notice to Proceed.
Selection Process:
The procurement will follow a single-phase, Best Value Trade Off source selection process. Proposals will be evaluated on past performance, management approach, and price, with non-price factors considered approximately equal to price in the overall evaluation. The Government reserves the right to award without discussions but may conduct them if deemed in its best interest.
Compliance and Registration:
Offerors must maintain active registration in the System for Award Management (SAM) and, if applicable, ensure joint ventures are properly registered. Compliance with the Cybersecurity Maturity Model Certification (CMMC) Level 2 (Self) is required for all information systems processing, storing, or transmitting Federal Contract Information (FCI) or Controlled Unclassified Information (CUI), in accordance with DFARS 252.204-7021. Registration in the Procurement Integrated Enterprise Environment (PIEE) and the Supplier Performance Risk System (SPRS) for CMMC is also mandatory.
Contracting Entity and Contact Information:
The contracting activity is managed by the USACE Louisville District (W072 ENDIST LOUISVILLE), under the Department of the Army, Department of Defense. The primary point of contact for this procurement is Contract Specialist Alexa Dukes, who can be reached at [email protected].
Additional Information:
The official solicitation is expected to be released on or about March 10, 2026, and will be available exclusively via electronic posting on SAM.gov. Interested contractors are responsible for monitoring the site for updates and amendments. No paper copies will be issued, and all project files will be provided in PDF format.
This pre-solicitation notice serves as advance notification of the upcoming opportunity. No responses to this synopsis are required at this stage.
For further details and updates, contractors should refer to the official posting at: https://sam.gov/opp/8720a2c4e98e43fe9afc3a7d10bc3b32/view
This project represents a substantial opportunity for firms with expertise in large-scale power generation, microgrid integration, and complex infrastructure construction, particularly those with experience in federal and military installations.