Z--GLCA REPLACE PAVEMENT AT LF CAMPGROUND
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
IMR ARIZONA(12400)
Contract Value
Not provided
Codes & Classification
Solicitation Number
140P1526Q0028
NAICS
237310 - Highway, Street, and Bridge Construction
Classification Code
Z2LB
Additional Details
Documents5
The National Park Service, under the Department of the Interior, has issued a solicitation for the replacement of pavement at the LF Campground within the Glen Canyon National Recreation Area (GLCA). This procurement, identified by number 140P1526Q0028, seeks qualified contractors specializing in highway, street, and bridge construction, as classified under NAICS code 237310 (2022 version). The project falls under Product Service Code Z2LB, which pertains to repair or alteration of highways and roads.
The primary objective of this solicitation is to restore and improve the pavement infrastructure at the LF Campground, ensuring safe and durable access for visitors and staff. The revised statement of work outlines the scope, which likely includes removal of existing pavement, site preparation, installation of new pavement, and associated finishing work. The intended outcome is a high-quality, long-lasting pavement solution that meets federal standards and supports the operational needs of the campground.
The contracting entity responsible for this procurement is IMR ARIZONA (12400), a federal office within the National Park Service. Contractors interested in this opportunity should note that the project is managed by Donald Tremble, who serves as the primary point of contact and can be reached at [email protected] or 720-450-1198 for further information or clarification.
This solicitation is currently active, with a posting date of September 3, 2026, and a response deadline of March 18, 2026, at 23:03. Contractors are encouraged to review all five attachments available via the official SAM.gov opportunity page (https://sam.gov/opp/9f0124d5121f43289cae5d3f336215c0/view) for detailed requirements, specifications, and submission instructions.
While the notice does not specify set-aside requirements or special considerations, contractors should be prepared to demonstrate relevant experience in highway and campground pavement projects, compliance with federal construction standards, and the ability to deliver quality workmanship within the prescribed timeline. The scope and objectives outlined in the revised statement of work will remain constant throughout the contract lifecycle, focusing on the successful replacement of pavement at the LF Campground.
This opportunity is well-suited for contractors with expertise in highway, street, and bridge construction, particularly those familiar with federal contracting and National Park Service projects. Interested parties should carefully review the solicitation documents and reach out to the designated contact for any questions prior to the response deadline.