Cancelled Rosebud Lift Station Construction
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
DIV OF ENGINEERING SVCS - SEATTLE
Contract Value
Not provided
Codes & Classification
Solicitation Number
75H70126R00018
NAICS
237110 - Water and Sewer Line and Related Structures Construction
Classification Code
Y1ND
Additional Details
The Indian Health Service (IHS), under the Department of Health and Human Services, issued Solicitation No. 75H70126R00018 for the construction of a new lift station at the Rosebud complex in Rosebud, South Dakota (Todd County). This procurement, classified under NAICS code 237110 (Water and Sewer Line and Related Structures Construction), was intended as a firm-fixed-price contract with an estimated magnitude between $500,000 and $1,000,000. The project was set aside for Indian Small Business Economic Enterprises (ISBEE), with TERO (Tribal Employment Rights Ordinance) requirements applicable as outlined in Section H.50.
**Purpose and Scope:**
The primary objective of this procurement was the complete removal and replacement of the existing lift station, which has been in service since the early 1990s. The current lift station supports the hospital, associated quarters units, and several tribal program buildings. Due to significant expansion—including additional hospital facilities, tribal programs, and residential units—the existing infrastructure was no longer adequate. Frequent pump failures and the need for increased wet well capacity underscored the urgency for a comprehensive upgrade. The new lift station was to be designed to accommodate both current and anticipated future sanitary loads, ensuring reliable wastewater service for the expanding Rosebud complex.
**Key Requirements and Deliverables:**
The scope of work included:
- Demolition of the existing lift station, including the wet well, dry well, pumps, and piping.
- Construction of a new lift station comprising a wet well, dry well, installation of chopper pumps (to better handle debris and reduce maintenance), and force main connection.
- Installation of a modern control system to monitor flow and equipment status, with integration to a PLC-based SCADA system for enhanced operational support and remote troubleshooting.
- Coordination with ongoing and future projects aimed at remediating or replacing damaged sewer mains due to inflow and infiltration.
The contract performance period was initially set at 120 calendar days, later amended to 240 days to accommodate project requirements and clarifications. The solicitation included detailed technical specifications, responses to bidder inquiries, and multiple amendments addressing equipment substitutions, specification clarifications, and proposal submission requirements.
**Contracting Entity and Contact Information:**
The procurement was managed by the Division of Engineering Services - Seattle, a federal office within the Indian Health Service. The primary point of contact was Daniel Cotto ([email protected], 240-461-7841), with Andrew E. Hart ([email protected], 206-375-4443) as the secondary contact.
**Procurement Type and Special Considerations:**
This opportunity was a firm-fixed-price construction contract, set aside for ISBEE participants, with TERO compliance required. The solicitation emphasized the need for contractors to acknowledge all amendments and adhere to the technical and administrative requirements outlined in the solicitation documents.
**Current Status:**
As of Amendment 8, the Government has cancelled Solicitation No. 75H70126R00018 in its entirety. After evaluating the proposals received, the Government determined that cancellation was in its best interest. There is an intention to review the requirement and potentially reissue a revised solicitation at a later date. Contractors are advised that all terms and conditions of the original solicitation are void, and no further action is required at this time. Interested parties should monitor official channels for any future opportunities related to this project.
**Summary for Contractors:**
While this solicitation is currently cancelled, the project represents a significant infrastructure upgrade for the Rosebud complex, with a focus on long-term reliability, capacity expansion, and integration of advanced control systems. Contractors with experience in water and sewer line construction, lift station installation, and SCADA integration—particularly those qualifying under ISBEE and TERO requirements—should consider monitoring for a revised solicitation. All official communications and future updates will be managed through the Division of Engineering Services - Seattle, with contact information provided above.
For reference, the original solicitation and amendments can be accessed via the SAM.gov opportunity ID 3399425221a147af95815756c18dce62.
Documents18