(MATOC) REPLACE ACTIVATED CARBON WITH NEW B650, WATER TREATMENT PLANT, CAMP CARROLL

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

0906 AQ CO DET A CONTRACTI

Contract Value

Not provided

Codes & Classification
Solicitation Number

W90VN926RA010

NAICS

-

Classification Code

-

Additional Details
Set Aside

None

Place of Performance

-

SourceSAM
The Department of the Army, acting through the 0906 AQ CO DET A Contracting Office, has issued an award notice for the project titled "(MATOC) Replace Activated Carbon with New B650, Water Treatment Plant, Camp Carroll." This procurement activity is focused on the replacement of existing activated carbon media with new B650-grade activated carbon at the water treatment facility located at Camp Carroll. The primary objective of this initiative is to ensure the continued effective operation of the water treatment plant by maintaining high standards of water purification and compliance with relevant environmental and safety regulations. The scope of work encompasses the removal of spent activated carbon and the installation of new B650 activated carbon within the plant’s filtration systems. The intended outcome is to restore or enhance the plant’s capacity to treat water efficiently, thereby supporting the health and operational readiness of Camp Carroll’s personnel and infrastructure. This procurement was managed by a federal office under the Department of Defense, specifically the Department of the Army. The contracting office responsible for this award is identified as 0906 AQ CO DET A, with Jaeyoun Lee serving as the primary point of contact. Interested parties may reach out to Mr. Lee via email at [email protected] or by phone at 315-763-5691 for further information. The notice, posted on January 14, 2026, remains active and is accessible through the official SAM.gov portal (Opportunity ID: 0d3563b65a2248648520086cc4a5d667). While the notice does not specify set-aside requirements, classification codes, or special considerations, it is clear that the project falls under the category of maintenance and upgrade of water treatment infrastructure at a military installation. Contractors evaluating this opportunity should note that the core deliverable is the successful replacement of activated carbon media, with all associated labor, materials, and compliance measures required to meet the Army’s operational standards. The project’s location at Camp Carroll and its alignment with Department of Defense objectives underscore the importance of reliability, quality assurance, and adherence to federal contracting protocols throughout the contract lifecycle.