INDUSTRY DAY: SURVIVABLE AIRBORNE OPERATIONS CENTER (SAOC), Offutt AFB, NE (SAOC) CONSTRUCTION

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

W071 ENDIST OMAHA

Contract Value

Not provided

Codes & Classification
Solicitation Number

-

NAICS

236220 - Commercial and Institutional Building Construction

Classification Code

-

Additional Details
Set Aside

NONE

Place of Performance

Offutt AFB, Nebraska, UNITED STATES

SourceSAM
The U.S. Army Corps of Engineers, Northwestern Division – Omaha District (NWO) is announcing an upcoming Industry Day to engage with the construction industry regarding a significant federal project at Offutt Air Force Base (AFB), Nebraska. This event, scheduled for January 22, 2026, will focus on the Survivable Airborne Operations Center (SAOC) Program, with particular emphasis on the construction of a new 2-bay maintenance hangar and associated taxiway infrastructure. **Purpose and Scope** The primary objective of this procurement is to deliver a state-of-the-art, fully enclosed 280,200 square foot, 2-bay maintenance hangar designed to accommodate maintenance activities for two Boeing 747-8i aircraft. The facility will also include an Aircraft Maintenance Unit (AMU), 8,000 square feet of consolidated tool kit (CTK) space, and 8,000 square feet dedicated to contractor logistics support (CLS) supply. The scope of work encompasses all aspects of construction, including concrete foundations, steel high bay structures, standing seam metal roofing, dual bridge crane telescopic maintenance platforms, motorized hangar doors, fire alarm and suppression systems (including crane coverage), and all necessary supporting infrastructure. The project will also provide for administrative areas, tool rooms, supply and bench stock areas, storage, shop spaces, emergency shower and eyewash stations, locker rooms with showers, break areas, and secure spaces, including Sensitive and/or Special Access Program areas. The facility will be equipped with a generator as authorized by AFI 32-1062, and will include all required utilities, pavements, site improvements, communications, and other elements necessary for a complete and usable facility. Airfield access pavements will be constructed, including base material, concrete pavement, asphalt shoulders, airfield markings, stormwater retention and drainage, lighting, and related support systems. Cybersecurity measures will be implemented in accordance with current Department of Defense (DoD) criteria for facility-related control systems. The design and construction will adhere to DoD Unified Facilities Criteria 1-200-01 for permanent construction and comply with antiterrorism/force protection requirements per UFC 4-010-01. **Key Requirements and Deliverables** - Construction of a 280,200 SF, 2-bay maintenance hangar for Boeing 747-8i aircraft - Inclusion of AMU, CTK, and CLS supply spaces - Full suite of administrative, maintenance, and support areas - Secure and special access program spaces - All supporting utilities, pavements, site improvements, and communications - Compliance with DoD construction, cybersecurity, and antiterrorism/force protection standards - Delivery of a complete, usable, and permanent facility **Contracting Entity and Location** The contracting activity is managed by the U.S. Army Corps of Engineers, Omaha District (W071 ENDIST OMAHA), a federal office. The place of performance is Offutt Air Force Base, Nebraska (NE), United States. **Procurement Details** - **NAICS Code:** 236220 (Commercial and Institutional Building Construction), with a small business size standard of $45,000,000 in annual revenue. - **Procurement Type:** Unrestricted competitive fixed-price contract; no set-aside applies. - **Estimated Magnitude:** Over $500,000,000. - **Anticipated Delivery Method:** Design-Bid-Build (DBB). - **Bonding Requirements:** Prime contractors must demonstrate single project bonding capability of $400 million or greater to request a one-on-one session; priority will be given to those with $1 billion or greater bonding capacity. **Industry Day Event Details** - **Date/Time:** January 22, 2026, 0900–1100 Central Time (main session); 1300–1600 (one-on-one sessions by invitation) - **Location:** Ed Zorinsky Federal Building, 1616 Capitol Avenue, Omaha, NE 68102-4901, Conference Rooms 158/159 - **Virtual Option:** Microsoft Teams link provided in the notice - **Security:** Valid ID and security screening required for in-person attendance **Participation and Contact Information** Prime construction contractors interested in a one-on-one session must submit a request by 2:00 PM Central Time, January 9, 2026, including their UEI or CAGE code and single bonding capacity. Joint ventures should identify all partners and their bonding capacities. Subcontractors and suppliers are not eligible for one-on-one sessions. - **Primary Contact:** Margarette Wolfe, [email protected] - **Secondary Contact:** Jessica Jackson, [email protected] **Additional Considerations** This Industry Day is intended to inform and solicit feedback from highly capable prime contractors, particularly those with substantial bonding capacity and experience in large-scale, secure, and technically complex federal construction projects. The event will cover project history, major features, constraints, challenges, and delivery methods, and will include a live Q&A session with USACE personnel. Contractors evaluating this opportunity should consider their experience with similar high-value, secure, and mission-critical military construction projects, as well as their ability to meet stringent bonding, security, and technical requirements. For further details and updates, refer to the official notice on SAM.gov: https://sam.gov/opp/1e139d2dff6a410eb1036aa8d402aff0/view