Tiny Home
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
W6QM MICC-FT DRUM
Contract Value
Not provided
Codes & Classification
Solicitation Number
W911S225U1801
NAICS
321991 - Manufactured Home (Mobile Home) Manufacturing
Classification Code
5450
Additional Details
The U.S. Army, through the Mission and Installation Contracting Command at Fort Drum (W6QM MICC-FT DRUM), has issued a Combined Synopsis/Solicitation for the procurement of a prebuilt modular tiny home, classified under NAICS code 321991 (Manufactured Home (Mobile Home) Manufacturing). This opportunity is set aside for Small Business Administration (SBA) eligible contractors, reflecting the government’s commitment to supporting small business participation in federal contracting.
The scope of this procurement encompasses the design, manufacture, delivery, and installation of a modular home intended for four-season use, with robust requirements for both residential comfort and stringent fire protection and life safety standards. The exterior of the home must not exceed dimensions of 13 feet 8 inches by 39 feet 7 inches and will feature a screened-in outdoor porch serving as the main entrance. Key exterior specifications include a standing seam metal roof with a 5:12 pitch and factory-applied finish, engineered wood lap siding and trims with textured finish, LED outdoor lighting, insulated single-hung low E vinyl windows, and a lockable steel entryway door equipped with a programmable smart lock. The home must be equipped with an electrical panel box rated for 50 amp service, insulated skirting (R11 or greater) matching the building siding, and an access door for underbelly maintenance.
Interior requirements are equally comprehensive, with a full kitchen outfitted with stainless steel appliances (refrigerator, gas range, microwave, sink), box-built cabinets, soft-close drawers, granite countertops, and a tile backsplash. The bathroom must include a tiled shower with glass door, rainfall and handheld shower heads, comfort-height toilet, china lavatory sink, and associated fixtures. Climate control is provided by fully electric split system units for both the master bedroom and living area. Additional interior features include sealed walls and doors, wood blinds, smooth finished ceilings (9-10 feet), drywall with luan backer, vinyl plank flooring, solid wood trim, and a furniture package comprising beds, mattresses, sectional sofa, dressers, nightstands, and wall-mounted TVs. Electrical and plumbing systems must support all appliances and include USBC outlets, on-demand gas water heater, and a standard manifold plumbing system.
A critical component of this project is the design and installation of comprehensive fire protection and life safety systems. The contractor is required to engage a qualified Fire Protection Engineer (FPE)—a registered professional engineer with at least five years of dedicated fire protection engineering experience and NCEES certification. The FPE must oversee all aspects of fire protection design, code compliance, system installation, testing, and commissioning, and provide stamped documentation verifying compliance with UFC 3-600-01, UFC 4-021-01, NFPA 13R, NFPA 24, NFPA 70, NFPA 72, NFPA 101, NFPA 90A, NFPA 10, and other referenced standards. Deliverables include fire protection design analysis, life safety plans, code compliance summaries, hydraulic analyses, and as-built documentation.
The fire alarm and mass notification systems must be addressable, non-proprietary, and capable of transmitting signals to the Fort Drum Fire Department via a Monaco BTX radio transmitter system. The system must include control panels, annunciators, emergency lights, smoke and heat detectors, carbon monoxide detectors, exit lights, audible and visual alarms, and gas detection/shut-off capabilities. All wiring must be in conduit, and the system must be water-tight. Testing and commissioning of these systems will be witnessed by government personnel, with all test reports and O&M manuals submitted as part of the post-construction deliverables.
Fire suppression requirements include the installation of automatic wet-pipe sprinkler systems throughout the building, a new water main and locking post indicator valve (PIV), and fire department/hose connections in accordance with NFPA and UFC standards. The contractor must coordinate sprinkler head locations with architectural plans and provide listed guards where necessary. Fire extinguisher cabinets and extinguishers must be installed per NFPA 10. All suppression systems must be inspected, tested, and certified by the FPE, with government representatives invited to witness final tests.
Additional site work includes constructing building supports using CMU block piers and I-beams anchored to existing reinforced concrete slabs, supplying and installing concrete stairs with aluminum railings, and connecting water, sewer, and electrical services to existing stub-outs. All above-grade piping must be insulated and heat-taped to prevent freezing.
This procurement is managed by Carrie Lawton, who serves as the primary point of contact ([email protected], 7721065). The solicitation is active, with proposals due by February 9, 2025. Interested contractors should review the full solicitation and requirements at https://sam.gov/opp/e84a9dd78a6d4399bb6760c5c5dcee49/view.
Contractors considering this opportunity should ensure they possess the requisite experience in modular home manufacturing, fire protection engineering, and federal construction standards, as well as the ability to deliver a turnkey solution that meets all specified requirements for safety, durability, and comfort. The project’s emphasis on code compliance, professional engineering oversight, and detailed deliverables will remain constant throughout the contract lifecycle.