ERCIP Lake City Army Ammunition Plant Microgrid and Backup Power

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

W072 ENDIST LOUISVILLE

Contract Value

Not provided

Codes & Classification
Solicitation Number

W912QR-26-ERCIPLakeCityAAP

NAICS

237130 - Power and Communication Line and Related Structures Construction

Classification Code

Y1NZ

Additional Details
Set Aside

None

Place of Performance

Independence, Missouri, UNITED STATES

SourceSAM
The U.S. Army Corps of Engineers, Louisville District (W072 ENDIST LOUISVILLE), is conducting a market survey to identify qualified small business concerns for a forthcoming Design-Bid-Build (D-B-B) construction project at the Lake City Army Ammunition Plant in Independence, Missouri. This sources sought notice is intended to assess the availability of capable small businesses—including certified HUBZone, 8(a), Woman-Owned Small Business, and Service-Disabled Veteran-Owned Small Business entities—to determine whether the project can be set aside for these groups. The project’s primary objective is the construction of a state-of-the-art microgrid and backup power system to enhance the energy resilience and operational reliability of the Lake City Army Ammunition Plant. The scope encompasses the design and construction of a microgrid powered by two 7.5 MW combined heat and power (CHP) combustion turbines, utilizing dual-fuel natural gas and propane systems to form a 15 MW CHP power/heat production plant. Key system components include heat recovery steam generators (HRSGs), supplemental exhaust duct firing, and a black start diesel generator. The project will require installation of all necessary electrical distribution equipment and underground duct banks to integrate with the plant’s existing electrical infrastructure. A sophisticated microgrid control system will be implemented to manage multiple operational modes—parallel operation with the utility grid, island mode, and black start capability. This control system will be integrated with two existing substations at four points of common coupling, enabling seamless operation, load shedding, and resynchronization with the grid following outages. The microgrid will also support simultaneous electricity and heat production, with steam distribution features to operate in tandem with the plant’s central heating system. Additional deliverables include installation of two 500-gallon underground waste water/oil storage tanks with double-wall interstitial leak monitoring and overfill alarms, all piping and equipment necessary to connect the CHP to existing natural gas, steam, condensate, and water infrastructure, and a new control room within the central heating plant. Environmental controls will be achieved through low NOx turbines and duct burners. The project also involves site improvements, demolition, full air permitting, communications infrastructure, and comprehensive commissioning. Cybersecurity is a critical requirement, with all systems to be designed in accordance with UFC 4-010-06 (Cyber Security of Facility-Related Control Systems) and UFGS 25 05 11 (Cybersecurity for Facility-Related Control Systems). The use of Software Defined Networking (SDN) capable industrial-grade equipment is mandated to ensure a robust, deny-by-default security posture. The estimated performance period for this project is 1,014 days, with an anticipated cost range between $25,000,000 and $100,000,000—likely toward the upper end of this range. The project is classified under NAICS Code 237130 (Power and Communication Line and Related Structures Construction), with Product Service Code Y1NZ. Interested firms must demonstrate relevant experience through submission of up to three example projects completed within the past five years or substantially complete (over 95%). These projects should reflect similarity in scope and size, including CHP turbine construction with HRSGs, microgrid control systems, master systems integration, natural gas and propane systems, steam generation and distribution, fiber optic-based SCADA systems, and site utility improvements. Firms must also provide details on project completion status, contract value, delivery method (D-B-B or design-build), self-performed work percentages, and subcontractor utilization. Cybersecurity Maturity Model Certification (CMMC) status is required, with firms asked to specify their current level (1, 2, or 3), anticipated changes, and plans for future certification. Small businesses are reminded of FAR 52.219-14, which requires at least 15% of the contract cost (excluding materials) to be performed by the firm’s own employees for general construction-type procurement. Firms must indicate their intended self-performance percentage and approach. Responses must be submitted exclusively via the designated survey form at https://forms.osi.apps.mil/r/Y9bKLfYuuw. No other transmission methods will be accepted, and capability statements should be limited to the space provided in the form. This notice is not a Request for Proposal and does not obligate the Government to any commitment. Responses will inform acquisition strategy, and interested parties must respond to future solicitations separately. All contractors must be registered in the System for Award Management (SAM.gov) prior to contract award, with payments made via electronic funds transfer (EFT). Firms are encouraged to begin the SAM registration process promptly to avoid delays. For further information, the primary point of contact is Alexa Dukes ([email protected]). The notice remains active, with a response deadline of January 6, 2026. Contractors with expertise in large-scale CHP systems, microgrid controls, utility integration, and cybersecurity for industrial control systems are encouraged to review the full requirements and consider responding if their capabilities align with the project’s scope and objectives.