Walla Walla District Dworshak Unit 4, Industry Day and One-on-One Sessions Announcement

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

US ARMY ENGINEER DISTRICT WALLA WAL

Contract Value

Not provided

Codes & Classification
Solicitation Number

W912EF26RSN02

NAICS

-

Classification Code

-

Additional Details
Set Aside

None

Place of Performance

Ahsahka, Idaho, UNITED STATES

SourceSAM
Documents5
The U.S. Army Corps of Engineers (USACE) Walla Walla District has issued a Special Notice (Procurement Identifier: W912EF26RSN02) announcing an upcoming Industry Day and one-on-one sessions related to the planned expansion of the Dworshak Dam Powerhouse in Ahsahka, Idaho. This initiative aims to increase the generation capacity of the facility by installing a fourth main generating unit (Main Unit 4) and extending the existing powerhouse structure. **Purpose and Scope** The primary objective of this procurement is to support the development and execution of multiple acquisitions necessary for the installation of Main Unit 4 at Dworshak Dam. The project encompasses a broad range of activities, including site preparation, construction of a powerhouse extension, procurement and installation of a large hydroelectric generator, and integration of auxiliary systems. The intended outcome is to enhance the dam’s power generation capabilities while maintaining ongoing operations and minimizing disruptions to existing units. **Key Requirements and Expected Deliverables** The Government anticipates awarding multiple firm fixed-price contracts, with the scope of work generally divided as follows: 1. **Powerhouse Building Extension and Site Development:** Preparation of the site, construction of the powerhouse substructure, and erection of the building envelope for the extension. 2. **Generator Step-Up Transformer:** Supply and delivery of a single three-phase transformer rated at approximately 300 MVA. 3. **Turbine-Generator:** Design, supply, installation, and commissioning of a hydroelectric generator with an estimated capacity of 250–300 MW. 4. **Balance of Plant:** Provision of auxiliary mechanical and electrical systems to support power generation and powerhouse operations. 5. **Hydraulic Steel Structures:** Supply of standalone steel structures such as gates, bulkheads, and trash racks. On-site construction is projected to commence in June 2029. Contractors should note that the office building will remain occupied throughout the project, with normal business hours from 6:00 a.m. to 6:00 p.m., Monday through Friday. Construction activities will be confined to designated areas to minimize interference with ongoing operations. **Project Constraints and Considerations** - The powerhouse extension will closely follow the configuration and design of the existing facility. - Existing power generation and maintenance activities will continue during construction; disruptions to current units are only permissible during scheduled outages, which must be coordinated and approved by the Government. - The project site offers limited space for contractor operations and equipment staging. Access is restricted to a single road with minimal turnaround and parking, necessitating the use of remote sites for parking, staging, and storage. - Contractors may consider temporary in-water structures or development of existing skeleton bays to mitigate site constraints. - An on-site rock quarry is available for material extraction, and an unmaintained roadbed from the dam’s original construction may offer additional access if advantageous. - Transportation of large or heavy equipment may be constrained by local infrastructure, including bridge capacities. - Environmental controls are critical due to the proximity to water, with strict requirements to prevent spills and other impacts. - Coordination with other prime contractors may be required, as multiple procurements could be active concurrently. **Industry Day and One-on-One Sessions** USACE will host a virtual Industry Day on December 10–11, 2025, beginning with a government briefing at 9:00 a.m. PST, followed by an open forum Q&A session. One-on-one sessions will be scheduled for interested companies, each lasting 90 minutes and limited to three representatives per company. These sessions are intended for in-depth discussion of project requirements and to solicit industry feedback; marketing presentations are not permitted. Interested parties must register by providing company and attendee information to [email protected] and [email protected] by December 4, 2025. Advance questions may also be submitted to these contacts, with proprietary questions clearly marked. **Supporting Information and Attachments** The notice references several attachments, including concept sketches, site photos, and reference drawings, to aid in understanding the project’s scope and existing conditions. **Project Labor Agreement (PLA) Considerations** The Government is seeking industry input regarding the potential use of a Project Labor Agreement (PLA), including its impact on project cost, schedule, and workforce availability. Contractors are encouraged to provide relevant experience and perspectives on the use of PLAs in similar projects. **Contracting Entity and Contact Information** - **Contracting Entity:** US Army Engineer District, Walla Walla (Federal Office) - **Department:** Department of Defense, Department of the Army - **Location:** Ahsahka, Idaho, United States - **Primary Contact:** LeAnne R. Walling ([email protected], 509-527-7230) - **Secondary Contact:** Jani C. Long ([email protected], 509-527-7209) **Procurement Type and Status** This is a Special Notice intended to facilitate industry engagement and inform the development of future solicitation packages. The procurement will be structured as multiple firm fixed-price contracts. No set-aside requirements or specific classification codes are indicated in the notice. **Conclusion** This opportunity represents a significant and complex hydroelectric infrastructure project with substantial technical, logistical, and operational considerations. Contractors with experience in large-scale power generation, hydroelectric equipment, and complex site logistics are encouraged to participate in the Industry Day and provide feedback to help shape the final solicitation. The Government is particularly interested in industry perspectives on contract structure, site access, schedule optimization, and workforce considerations, including the potential use of PLAs. For further details and to access supporting documents, interested parties should refer to the official notice on SAM.gov (Opportunity ID: 93ec88e767414b6185eb7a739e4dd8a3).